USA β€Ί Texas

Data centers in Texas

190 projects we know about, across 81 counties. Pick your county below, or type your ZIP on the home page.

Built & runningBeing builtApproved, not built yetProposedStopped or cancelled

All projects

Newest activity first. Click one to see the details.

Built & running

Stargate AI data center campus (Lancium Clean Campus, Abilene)

Abilene, Taylor County

800 acres Β· for Oracle for OpenAI

πŸ•’ May 2026: Buildings 3 and 4 began operating.

Being built

Crusoe 900 MW AI campus for Microsoft (Abilene)

Abilene, Taylor County

for Microsoft

πŸ•’ March 27, 2026: Crusoe announced a 900-megawatt expansion in Abilene for Microsoft, with its own on-site…

Being built

Vantage 'Frontier' AI data center campus (Shackelford County)

Unincorporated Shackelford County, Shackelford County

1,200 acres Β· for Oracle / OpenAI (reported)

πŸ•’ Aug 2025: Vantage announced the $25 billion Frontier campus; construction had already begun.

Being built

Google data center campuses (Haskell County)

Unincorporated Haskell County, Haskell County

for Google

πŸ•’ Nov 14, 2025: Google announced $40 billion for Texas, including two data centers in Haskell County.

Approved, not built yet

Crusoe data center project (Haskell County)

Unincorporated Haskell County, Haskell County

2,042 acres

πŸ•’ June 23, 2026: County and Haskell DC Owner LLC signed the tax break agreement.

Being built

Google data center 'Project Rise' (Wilbarger County, near Vernon)

Unincorporated Wilbarger County, Wilbarger County

for Google

πŸ•’ March 31, 2026: Construction start date listed in state building filings for Project Rise 1A and 2A.

Being built

Rowan 'Project Temple' data center campus, incl. Lasso building (Temple)

Temple, Bell County

πŸ•’ Sept 3, 2026: City Council held a first hearing on annexing land and a tax break for Lasso; residents …

Being built

Rowan 'Project Stampede' and 'Project Ranger' data centers (Temple)

Temple, Bell County

πŸ•’ May 7, 2026: Council approved annexation, zoning and utility items for a three-phase Rowan data cente…

Built & running

Meta AI data center (Temple)

Temple, Bell County

399 acres Β· for Meta

πŸ•’ July 22, 2026: Meta opened the data center.

Proposed

CloudHQ SAT data center campus (Texas Research Park)

Unincorporated Bexar County, Bexar County

123 acres

πŸ•’ May 2023: University of Texas System sold about 123.4 acres at Texas Research Park to CloudHQ; sit…

Being built

Vantage TX1 data center campus, TX11 and TX12 (Texas Research Park)

Unincorporated Bexar County, Bexar County

58 acres

πŸ•’ July 2026: Environmental groups (Environmental Integrity Project, Sierra Club, Public Citizen) sent…

Being built

Vantage data center site, TX21 and TX22 (Westover Hills, San Antonio)

San Antonio, Bexar County

31 acres

πŸ•’ Oct 2025: Vantage filed state plans for TX22 (214,525 sq ft, $272 million), construction Oct. 2025…

Being built

Microsoft data centers SAT14, SAT15, SAT16 (Westover Hills, San Antonio)

San Antonio, Bexar County

for Microsoft

πŸ•’ March 2024: Microsoft filed state plans for SAT16, a 245,000-square-foot, $215 million building at 3…

Proposed

Amazon 'Lavender Hill' data center (State Highway 211)

Unincorporated Bexar County, Bexar County

for Amazon Web Services

πŸ•’ March 25, 2026: Amazon filed state plans for a new two-story Lavender Hill data center.

Reported in the news, not confirmed yet

Proposed

Amazon 'Bitter Blue' data center (Donop Road, San Antonio)

San Antonio, Bexar County

for Amazon Web Services

πŸ•’ March 2026: Amazon Data Services filed state plans for the Bitter Blue data center.

Reported in the news, not confirmed yet

Proposed

COPT Potranco data center shell building (San Antonio)

San Antonio, Bexar County

for unknown (Amazon reported as possible)

πŸ•’ March 2026: COPT filed state plans for a $25 million data center shell building.

Reported in the news, not confirmed yet

Built & running

Stream Data Centers San Antonio III campus (West Military Drive)

San Antonio, Bexar County

135 acres

πŸ•’ June 26, 2024: Stream broke ground on its third San Antonio campus.

Reported in the news, not confirmed yet

Proposed

QTS San Antonio III data center site (Omicron subdivision)

Unincorporated Bexar County, Bexar County

48 acres

πŸ•’ May 10, 2023: San Antonio Planning Commission considered QTS's request to create the Omicron Subdivisi…

Reported in the news, not confirmed yet

Being built

Microsoft data center campus SAT80-SAT82 (FM 471 and Potranco Road, near Castroville)

Unincorporated Medina County, Medina County

206 acres Β· for Microsoft

πŸ•’ Dec 2025: Microsoft filed plans for a $400 million, 195,670-square-foot building at 3580 FM 471 No…

Being built

Microsoft data center campus SAT89-SAT91 (U.S. 90 West, near Castroville)

Unincorporated Medina County, Medina County

for Microsoft

πŸ•’ March 2025: Microsoft filed state plans for two buildings (SAT89 and SAT90) at 2995 U.S. 90 West, co…

Proposed

CyrusOne data center SAT14A (U.S. 90 West, near Castroville)

Unincorporated Medina County, Medina County

244 acres

πŸ•’ July 2026: CyrusOne filed state plans for project SAT14A; Medina County created a tax zone for the …

Reported in the news, not confirmed yet

Approved, not built yet

Rowan 'Project Cinco' data center campus (west of Lytle)

Unincorporated Medina County, Medina County

440 acres

πŸ•’ April 28, 2025: Lytle City Council approved an 80% tax break, 5-0.

Proposed

Tract Caldwell Valley Technology Park (near Uhland)

Unincorporated Caldwell County, Caldwell County

2,973 acres

πŸ•’ Jan 2026: Tract added 1,458 acres, bringing the park to almost 3,000 acres and up to 4 gigawatts.

Proposed

PowerHouse data center in Caldwell Valley Technology Park (near Uhland)

Unincorporated Caldwell County, Caldwell County

500 acres

πŸ•’ May 2026: PowerHouse filed a petition to release its site from Uhland's jurisdiction so it can go …

Being built

Prime Data Centers AUS01 and AUS02 (Bob White Road, near Lockhart)

Unincorporated Caldwell County, Caldwell County

206 acres

πŸ•’ May 2026: Prime filed state plans for AUS01 and AUS02; construction set to start June 2026.

Reported in the news, not confirmed yet

Approved, not built yet

Edged Austin data center campus (Maxwell)

Unincorporated Caldwell County, Caldwell County

330 acres

πŸ•’ May 2026: Edged filed state plans for the first building; construction set for June 2026 to June 2…

Reported in the news, not confirmed yet

Being built

CloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels)

Unincorporated Guadalupe County, Guadalupe County

706 acres

πŸ•’ April 21, 2026: Guadalupe County Commissioners Court approved a $500 million tax break and a development…

Stopped or cancelled

Highlander SM One data center (Francis Harris Lane, San Marcos)

San Marcos, Hays County

200 acres

πŸ•’ Feb 18, 2026: San Marcos City Council voted 5-2 to deny a land use change for the data center.

Proposed

Sabey data center campus (Centerpoint Road, San Marcos)

San Marcos, Hays County

786 acres

πŸ•’ June 3, 2025: San Marcos City Council approved starting negotiations on a development agreement with S…

Reported in the news, not confirmed yet

Proposed

Legacy Investing data center (1000 Bolton Road, Marion)

Marion, Guadalupe County

39 acres

πŸ•’ June 2026: Legacy Investing announced the 50 MW project on the former San Antonio Karting Complex s…

Reported in the news, not confirmed yet

Being built

Skybox PowerCampus Austin (Hutto)

Hutto, Williamson County

220 acres

πŸ•’ Nov 2023: State filing for the first Hutto building; construction set for Jan. to Nov. 2024.

Reported in the news, not confirmed yet

Built & running

Skybox Austin data center campus (Pflugerville)

Pflugerville, Travis County

πŸ•’ Nov 2023: State filing for Skybox Austin 2 in Pflugerville; construction set for Dec. 2023 to Oct.…

Reported in the news, not confirmed yet

Approved, not built yet

Colovore 'Project Raptor' data center (Hutto)

Hutto, Williamson County

πŸ•’ Dec 2024: Hutto City Council granted a site use permit for the data center.

Reported in the news, not confirmed yet

Stopped or cancelled

Zydeco 'Project Hutto' data center (Ed Schmidt Blvd, Hutto)

Hutto, Williamson County

πŸ•’ April 2026: Zydeco withdrew its rezoning request; the special Planning and Zoning meeting set for Ap…

Reported in the news, not confirmed yet

Proposed

Iron Mountain 'Taylor Meadows' data center campus (FM 3349, near Hutto and Taylor)

Unincorporated Williamson County, Williamson County

500 acres

πŸ•’ March 2026: Iron Mountain presented the Taylor Meadows project to Hutto City Council with a sewer se…

Reported in the news, not confirmed yet

Proposed

'Project Mustang' data center campus (east of Taylor)

Unincorporated Williamson County, Williamson County

665 acres

πŸ•’ Sept 2026: Developers withdrew their annexation and zoning request with the City of Taylor.

Reported in the news, not confirmed yet

Approved, not built yet

KDC 'Project Comal' data center campus (Taylor)

Taylor, Williamson County

220 acres

πŸ•’ March 26, 2026: Taylor City Council voted unanimously to annex and zone the land for the data center.

Reported in the news, not confirmed yet

Approved, not built yet

Blueprint data center campus (MLK Jr. Drive, Taylor)

Taylor, Williamson County

πŸ•’ Oct 2025: A state district judge dismissed a lawsuit against Blueprint.

Approved, not built yet

Mesone data center (County Road 305, Jarrell)

Jarrell, Williamson County

150 acres

πŸ•’ Oct 14, 2025: City Council annexed the land and changed its land use and zoning to allow the data cent…

Reported in the news, not confirmed yet

Proposed

Skybox data center (Old Settlers Blvd and Kiphen Road, Round Rock)

Round Rock, Williamson County

30 acres

πŸ•’ Nov 5, 2025: Round Rock Planning and Zoning Commission gave preliminary approval.

Reported in the news, not confirmed yet

Being built

Switch 'The Rock' data center campus (Round Rock)

Round Rock, Williamson County

πŸ•’ Oct 26, 2023: Round Rock City Council unanimously rezoned 32.48 acres for a Switch data center.

Reported in the news, not confirmed yet

Being built

Sabey Data Centers Austin campus (Round Rock)

Round Rock, Williamson County

πŸ•’ July 2025: Sabey announced its second building, under construction.

Reported in the news, not confirmed yet

Proposed

Amazon data center site (County Road 172, Round Rock)

Round Rock, Williamson County

149 acres Β· for Amazon Web Services

πŸ•’ Dec 2023: Amazon sought a Planning and Zoning recommendation to annex and rezone the land, adding …

Reported in the news, not confirmed yet

Proposed

Switch data center expansion (Smith School Road, Austin)

Austin, Travis County

πŸ•’ Feb 2024: Switch filed site plans with the City of Austin for a new building.

Reported in the news, not confirmed yet

Status unclear

Cosmos Technology Campus (former 3M site, Four Points, Austin)

Austin, Travis County

for SoftBank affiliate (Silver Bands 3)

πŸ•’ Sept 2026: SEC filing showed about $1 billion in financing and a 15-year lease to a SoftBank affili…

Reported in the news, not confirmed yet

Built & running

Tesla Cortex AI data centers (Giga Texas)

Unincorporated Travis County, Travis County

for Tesla

πŸ•’ April 2026: Tesla said its Cortex 2 AI training cluster at Giga Texas was online.

Reported in the news, not confirmed yet

Approved, not built yet

Sailfish 'Comanche Circle' data center campus (near Tolar)

Unincorporated Hood County, Hood County

2,100 acres

πŸ•’ June 9, 2026: Commissioners Court approved the concept plan without conditions, 3-1.

Stopped or cancelled

'Fort Spunky' data center (Pacifico Energy, Hood County)

Unincorporated Hood County, Hood County

862 acres

πŸ•’ 2026: Pacifico Energy sued Hood County, saying it lacked power to deny the project over water.

Reported in the news, not confirmed yet

Status unclear

'Project Red' and 'Project Yellow' data centers (Hood County)

Unincorporated Hood County, Hood County

677 acres

πŸ•’ July 21, 2026: District Judge Bryan Bufkin dismissed the developers' lawsuit with prejudice.

Approved, not built yet

Bilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury)

Granbury, Hood County

2,000 acres

πŸ•’ July 13, 2026: Residents filed petitions to recall the mayor and most council members.

Status unclear

Amazon 'Project Spectrum' data center campus (Coates Road, near Comanche Peak)

Unincorporated Hood County, Hood County

1,265 acres Β· for Amazon Web Services

πŸ•’ May 26, 2026: Hood County Commissioners Court accepted the conditional plan, 3-0 (two commissioners ab…

Reported in the news, not confirmed yet

Approved, not built yet

Amazon data center campus at Comanche Peak nuclear plant (Somervell County)

Unincorporated Somervell County, Somervell County

435 acres Β· for Amazon Web Services

πŸ•’ Feb 2026: Somervell County Commissioners Court voted to move forward with a development agreement …

Reported in the news, not confirmed yet

Built & running

MARA (Marathon) bitcoin mining data center (Granbury area)

Unincorporated Hood County, Hood County

for Marathon (bitcoin mining)

πŸ•’ 2023: Marathon Digital bought the Granbury site from Generate Capital for $178.6 million.

Reported in the news, not confirmed yet

Being built

CyrusOne data center at Calpine's Thad Hill Energy Center (Bosque County)

Unincorporated Bosque County, Bosque County

πŸ•’ Nov 3, 2025: They added 210 MW, for 400 MW in total.

Reported in the news, not confirmed yet

Approved, not built yet

Texas Data Center Campus (Wichita Falls Business Park)

Wichita Falls, Wichita County

225 acres

πŸ•’ Oct 2025: City Council approved selling more than 225 acres in the business park for a data center…

Reported in the news, not confirmed yet

Proposed

Calvano hyperscale data center (Northwest Freeway and City View Drive, Wichita Falls)

Wichita Falls, Wichita County

227 acres

πŸ•’ Nov 5, 2024: Wichita Falls City Council rezoned about 227 acres from residential to light industrial …

Reported in the news, not confirmed yet

Stopped or cancelled

Airport Drive data center rezoning (Wichita Falls)

Wichita Falls, Wichita County

πŸ•’ May 5, 2026: City Council voted unanimously to deny the rezoning.

Reported in the news, not confirmed yet

Proposed

Bolt Data and Energy 'Project North' (west of Albany)

Unincorporated Shackelford County, Shackelford County

πŸ•’ Aug 12, 2026: Residents heard from the developer at a town hall at Albany High School.

Reported in the news, not confirmed yet

Proposed

PowerPlay AI and Sharon AI gas-powered data center (near Abilene)

Unincorporated Taylor County, Taylor County

πŸ•’ July 2026: PowerPlay AI and Sharon AI announced the 400 MW joint venture.

Reported in the news, not confirmed yet

Proposed

FluidStack data center (outside Harlingen)

Unincorporated Cameron County, Cameron County

πŸ•’ Sept 2, 2026: Harlingen City Commission tabled FluidStack's drainage agreement after residents raised …

Reported in the news, not confirmed yet

Built & running

Soluna 'Project Kati' bitcoin and AI data center (Willacy County)

Unincorporated Willacy County, Willacy County

for Bitcoin mining and AI customers

πŸ•’ Sept 8, 2026: Soluna energized the last 14 MW of Kati 1 and got conditional ERCOT approval for all 166…

Reported in the news, not confirmed yet

Proposed

Soluna 'Project Hedy' crypto and AI data center (Cameron County)

Unincorporated Cameron County, Cameron County

πŸ•’ April 2025: Soluna signed a power supply agreement with a wind farm owner for Project Hedy.

Reported in the news, not confirmed yet

Proposed

Soluna 'Project Ellen' crypto and AI data center (South Texas wind farm)

Unincorporated Cameron County, Cameron County

πŸ•’ April 17, 2025: Soluna announced a power term sheet for Project Ellen.

Reported in the news, not confirmed yet

Being built

Peak Mining bitcoin data centers (Corpus Christi area)

Unincorporated Nueces County, Nueces County

for Bitcoin mining

πŸ•’ May 24, 2024: Peak Mining announced it bought a second 300 MW site next to its first, which was under …

Reported in the news, not confirmed yet

Proposed

Energy Abundance 'Data City' (near Laredo)

Unincorporated Webb County, Webb County

50,000 acres

πŸ•’ March 2025: Energy Abundance announced Data City near Laredo.

Reported in the news, not confirmed yet

Proposed

Misae 'Mojo Ranch' AI data center and energy project (north of Stockdale)

Unincorporated Wilson County, Wilson County

2,700 acres

πŸ•’ Feb 2026: More than 140 residents met in Stockdale to raise concerns about water, noise and light.

Reported in the news, not confirmed yet

Proposed

Cipher 'Reveille' data center site (Cotulla area)

Unincorporated La Salle County, La Salle County

πŸ•’ Feb 2026: Cipher's annual report listed Reveille (up to 70 MW, power expected 2027).

Reported in the news, not confirmed yet

Proposed

Cipher 'Mikeska' data center site (McCulloch County)

Unincorporated McCulloch County, McCulloch County

πŸ•’ Feb 2026: Cipher exercised its option on the Mikeska site.

Reported in the news, not confirmed yet

Proposed

Tract 'Applewhite Technology Park' (south San Antonio)

San Antonio, Bexar County

339 acres

Reported in the news, not confirmed yet

Proposed

Black Mountain Power site (State Highway 16 and Lone Star Pass, south San Antonio)

San Antonio, Bexar County

432 acres

πŸ•’ Jan 2026: Black Mountain Power LLC bought 432 acres at SH 16 and Lone Star Pass.

Reported in the news, not confirmed yet

Proposed

Tract 'Medina Technology Park' (U.S. 90 W and CR 4516, near Castroville)

Unincorporated Medina County, Medina County

265 acres

πŸ•’ May 2026: Medina County residents spoke out against the planned technology park.

Reported in the news, not confirmed yet

Stopped or cancelled

Rowan Moriah data center (Bob White Road, Temple)

Temple, Bell County

πŸ•’ 2024: The tenant left the building.

Proposed

AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin)

Unincorporated Angelina County, Angelina County

1,000 acres

πŸ•’ Aug 25, 2026: Commissioners hired a law firm to help write tax break deals for data centers.

Being built

HyperDataGrid data center (old Northern Chip Mill, Hwy 103 West)

Unincorporated Angelina County, Angelina County

40 acres

πŸ•’ July 9, 2026: County judge said HyperDataGrid had power and water deals and had started clearing land.

Reported in the news, not confirmed yet

Approved, not built yet

Provident / PowerHouse hyperscale campus (Grand Prairie, Ellis County)

Grand Prairie, Ellis County

768 acres

πŸ•’ Feb 25, 2025: Developers announced a 24-building, 768-acre campus with a 1.8-gigawatt switchyard.

Reported in the news, not confirmed yet

Approved, not built yet

Compass Datacenters 830-acre campus (Red Oak)

Red Oak, Ellis County

830 acres

πŸ•’ June 2, 2026: Compass announced a $15 million grant for an animal shelter in Ellis County.

Being built

DataBank Red Oak campus (Stainback Road)

Red Oak, Ellis County

292 acres

πŸ•’ Nov 5, 2024: DataBank filed a $265 million, 425,000 sq ft second building (DFW10) on its 292-acre cam…

Reported in the news, not confirmed yet

Being built

STACK Infrastructure DFW02 campus (Lancaster)

Lancaster, Dallas County

102 acres

Reported in the news, not confirmed yet

Being built

Nexus Apex DFW campus (near Hubbard)

Unincorporated Hill County, Hill County

2,000 acres

πŸ•’ June 2026: Company filed state building plans and an air permit request for its gas plant.

Built & running

Riot Platforms Rockdale site (bitcoin mine turning into AI data center)

Unincorporated Milam County, Milam County

200 acres Β· for AMD (first tenant, 50 MW)

πŸ•’ May 1, 2026: AMD added 25 MW, for 50 MW in total.

Being built

Riot Platforms Corsicana campus (1 GW)

Unincorporated Navarro County, Navarro County

πŸ•’ 2023: Construction began; site running by 2024.

Reported in the news, not confirmed yet

Built & running

Bitdeer Rockdale site (bitcoin mine, planned AI expansion)

Unincorporated Milam County, Milam County

200 acres

πŸ•’ Sept 5, 2026: Bitdeer bought 200 acres for $100 million to plan AI and high-power computing.

Reported in the news, not confirmed yet

Being built

Core Scientific / CoreWeave AI data center (Jim Christal Road, Denton)

Denton, Denton County

78.85 acres Β· for CoreWeave (planned user, per 2024 reports)

πŸ•’ Nov 19, 2024: City Council voted to lease 78.85 acres of city land and approve a new power deal for th…

Approved, not built yet

QumulusAI modular data center (Denton)

Denton, Denton County

4 acres

πŸ•’ Jan 13, 2026: City Council approved the permit and a tax break for 8 prefab data center 'pods' on 4 ac…

Reported in the news, not confirmed yet

Approved, not built yet

Black Mountain data center campus (southeast Fort Worth)

Fort Worth, Tarrant County

431 acres

πŸ•’ Aug 2026: City Council approved a revised plan with a substation and setbacks of more than 300 fee…

Proposed

Edged data center (Veale Ranch, west Fort Worth)

Fort Worth, Tarrant County

186 acres

πŸ•’ March 31, 2026: City Council voted to delay a decision on a 50% tax break.

Being built

QTS Fort Worth campus expansion (FTW1, 14100 Park Vista Blvd.)

Fort Worth, Tarrant County

53 acres

πŸ•’ 2026: QTS filed a $300 million, 147,946 sq ft addition (FTW1 DC1 Expansion), July 2026 to Oct.…

Reported in the news, not confirmed yet

Proposed

Colovore Alliance AI data center (AllianceTexas)

Fort Worth, Denton County

πŸ•’ Sept 30, 2026: Colovore filed plans for a $430 million, 156,500 sq ft liquid-cooled data center.

Reported in the news, not confirmed yet

Being built

OpenAI Stargate data center (Milam County, near Burlington)

Unincorporated Milam County, Milam County

for OpenAI

πŸ•’ May 4, 2026: Photo showed construction under way near Burlington.

Being built

Amazon (AWS) data center campus near Boling

Unincorporated Wharton County, Wharton County

3,000 acres Β· for Amazon Web Services

πŸ•’ Sept 8, 2026: Coastal Bend Groundwater Conservation District approved permits for three more wells.

Reported in the news, not confirmed yet

Being built

CyrusOne campus at Freestone Energy Center (near Fairfield)

Unincorporated Freestone County, Freestone County

πŸ•’ 2026: State building filings for three buildings (about 918,650 sq ft, $1.5 billion) were repo…

Reported in the news, not confirmed yet

Proposed

Crusoe AI campus at the Port of Victoria (Blue Energy power)

Unincorporated Victoria County, Victoria County

1,600 acres

πŸ•’ June 23, 2026: Blue Energy applied for local property tax breaks for the power plant.

Reported in the news, not confirmed yet

Status unclear

Project Aquila (RCM Hill, unincorporated Hill County)

Unincorporated Hill County, Hill County

800 acres

πŸ•’ May 28, 2026: RCM Hill sued Hill County in federal court in Waco, calling the pause illegal.

Proposed

Provident data center on Hillsboro EDC land

Hillsboro, Hill County

300 acres

πŸ•’ April 24, 2026: Many residents spoke against the plan at a public meeting.

Reported in the news, not confirmed yet

Proposed

MARA computing campus (former HIF fuels site, Matagorda County)

Unincorporated Matagorda County, Matagorda County

1,200 acres

πŸ•’ July 9, 2026: MARA signed a deal to buy the 1,200-acre site from HIF USA for AI computing and possibly…

Reported in the news, not confirmed yet

Status unclear

LAMP data center and power hub (BaRupOn, near Raywood)

Unincorporated Liberty County, Liberty County

700 acres

πŸ•’ May 22, 2026: County attorney said the company restarted building without permits and must pay fines.

Reported in the news, not confirmed yet

Proposed

Old Ocean data center campus (Nightpeak Energy, near Sweeny)

Unincorporated Brazoria County, Brazoria County

158 acres

πŸ•’ March 2026: Brazoria County commissioners unanimously rejected the tax break requests.

Reported in the news, not confirmed yet

Proposed

Crusoe data center (Kahla Project, Leon County)

Unincorporated Leon County, Leon County

πŸ•’ July 13, 2026: Leon County commissioners rejected Crusoe's first tax break application as incomplete; 2…

Reported in the news, not confirmed yet

Proposed

Port Arthur AI data center (planned near Entergy Legend plant)

Port Arthur, Jefferson County

42 acres

πŸ•’ Jan 14, 2026: Chamber of Commerce briefed contractors on a $1.3 billion AI data center plan.

Reported in the news, not confirmed yet

Proposed

Raeden AI data center (old glass bottle plant, Jacinto City)

Jacinto City, Harris County

30 acres

πŸ•’ Sept 11, 2026: City held a town hall with residents and the company.

Proposed

Viridien computing center (Longwood Drive, Brenham)

Brenham, Washington County

21 acres

πŸ•’ Jan 8, 2026: Brenham City Council unanimously rejected a reinvestment zone for the project.

Being built

EdgeConneX Cedar Creek campus 1 (FM 535 and Wolf Lane)

Unincorporated Bastrop County, Bastrop County

112 acres Β· for CoreWeave

πŸ•’ May 27, 2026: First 578,000 sq ft building was nearly finished.

Being built

EdgeConneX Cedar Creek campus 2 (6682 and 6402 FM 535)

Unincorporated Bastrop County, Bastrop County

951 acres

πŸ•’ June 16, 2026: Town halls held in Elgin, Smithville (June 17) and Bastrop (June 18).

Proposed

EdgeConneX Cedar Creek campus 3 (6543 FM 535)

Unincorporated Bastrop County, Bastrop County

400 acres

Reported in the news, not confirmed yet

Proposed

Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road)

Unincorporated Bastrop County, Bastrop County

2,842 acres

πŸ•’ Aug 19, 2026: Developers withdrew both county tax break requests.

Approved, not built yet

RELLIS data and research center (Texas A&M RELLIS Campus)

Bryan, Brazos County

πŸ•’ Aug 18, 2026: Brazos County commissioners voted 4-0 to move the tax deal to the new owner, ThisWay Glo…

Stopped or cancelled

Project Aggie AI data center (Midtown Business Park, College Station)

College Station, Brazos County

200 acres

πŸ•’ Sept 11, 2025: City Council voted unanimously to reject the land sale after nearly six hours of public …

Being built

CleanSpark AI data center campus (Austin County)

unknown, Austin County

271 acres

πŸ•’ Oct 29, 2025: CleanSpark announced it bought rights to 271 acres and signed 285 MW of power deals.

Reported in the news, not confirmed yet

Proposed

CleanSpark AI data center site (Brazoria County)

unknown, Brazoria County

447 acres

Reported in the news, not confirmed yet

Stopped or cancelled

Diode Ventures data center near Cedar Creek Reservoir (canceled)

unknown, Henderson County

πŸ•’ July 23, 2026: Diode Ventures said it was pulling the project, saying it could not meet the governor's …

Stopped or cancelled

Data Factory data center (Athens)

Athens, Henderson County

πŸ•’ Aug 24, 2026: City Council voted 3-2 for an ordinance banning data centers (over 500 sq ft of servers).

Reported in the news, not confirmed yet

Stopped or cancelled

Vulcan Core bitcoin mine / data center (W. Erwin St., Tyler)

Tyler, Smith County

for Barrio (data center operator, planned tenant)

πŸ•’ July 7, 2026: Tyler Planning and Zoning Commission voted 5-2 to deny the permit, as city staff advised.

Reported in the news, not confirmed yet

Status unclear

CyrusOne data center on old Thermo mine land (near Sulphur Springs)

Unincorporated Hopkins County, Hopkins County

πŸ•’ Sept 24, 2026: CyrusOne held a community meeting at the Hopkins County Civic Center.

Reported in the news, not confirmed yet

Proposed

Proposed Delta County data center

unknown, Delta County

πŸ•’ March 2, 2026: County held a public town hall at Cooper ISD High School.

Reported in the news, not confirmed yet

Proposed

Project Big Pine (TexAmericas Center)

unknown, Bowie County

500 acres

πŸ•’ April 28, 2026: TexAmericas Center and Potentia announced they are moving forward with a 500-acre campus.

Reported in the news, not confirmed yet

Proposed

Datahub Developers AI data center (East Texas Logistics Center, I-30)

unknown, Bowie County

πŸ•’ Sept 24, 2026: Residents objected to the land sale for a data center.

Reported in the news, not confirmed yet

Proposed

1606 Corp. AI data center at a Lufkin power plant

Lufkin, Angelina County

132 acres

πŸ•’ 2026: 1606 Corp. signed a non-binding term sheet to buy the plant and 132 acres for about $11.…

Reported in the news, not confirmed yet

Proposed

Core Scientific / Telios AI data center campus (Wieland, Hunt County)

Unincorporated Hunt County, Hunt County

265 acres

πŸ•’ March 24, 2026: Core Scientific and Telios spoke to the Hunt County Commissioners Court.

Reported in the news, not confirmed yet

Proposed

BT Gateway AI data center (Giga Energy, near Royse City)

Unincorporated Hunt County, Hunt County

30 acres

πŸ•’ June 2026: BT Gateway Data Center LLC filed state plans for a $384 million, 100,000 sq ft AI data c…

Reported in the news, not confirmed yet

Proposed

Prometheus Hyperscale campus (between Talty and Post Oak Bend City)

unknown, Kaufman County

500 acres

Reported in the news, not confirmed yet

Proposed

Black Mountain data center (near Bells)

unknown, Grayson County

πŸ•’ March 17, 2026: Residents filled Grayson County Commissioners Court with concerns.

Proposed

Hedgehog USA powered land data center campus (Navarro County)

unknown, Navarro County

Reported in the news, not confirmed yet

Proposed

Infrakey data district (west of Elm Mott)

Lacy-Lakeview, McLennan County

520 acres

πŸ•’ Dec 9, 2025: City Council voted 6-1 to approve an agreement and annex 520 acres.

Proposed

Cipher Digital data center campus (near Riesel, Sandy Creek coal plant)

Unincorporated McLennan County, McLennan County

Reported in the news, not confirmed yet

Approved, not built yet

Galaxy Project Merlin data center (McGregor industrial park)

McGregor, McLennan County

500 acres

πŸ•’ June 2026: McGregor City Council approved plans for the data center.

Reported in the news, not confirmed yet

Proposed

Yondr data center campus (Lancaster)

Lancaster, Dallas County

163 acres

Reported in the news, not confirmed yet

Approved, not built yet

Project Orange and Project Labrador data center campuses (Lancaster)

Lancaster, Dallas County

535 acres

πŸ•’ Aug 11, 2025: Lancaster City Council approved zoning and a development agreement for both sites.

Reported in the news, not confirmed yet

Proposed

Crow Holdings / CleanArc data center campus (Stemmons Corridor, Dallas)

Dallas, Dallas County

40 acres

πŸ•’ Jan 20, 2026: Crow Holdings announced a 245 MW campus; first 70 MW building due late 2027.

Reported in the news, not confirmed yet

Being built

PowerHouse Irving data center campus (111 Customer Way)

Irving, Dallas County

50 acres

Reported in the news, not confirmed yet

Being built

QTS DFW2 campus (303 Mason Road)

unknown, Dallas County

πŸ•’ April 2025: QTS filed state plans for two buildings (470,000 and 560,000 sq ft) costing about $650 m…

Reported in the news, not confirmed yet

Approved, not built yet

Microsoft data centers (four buildings, Irving)

Irving, Dallas County

for Microsoft

πŸ•’ Dec 12, 2024: Irving City Council approved tax breaks for four Microsoft data centers.

Approved, not built yet

QTS Irving campus expansion (three buildings)

Irving, Dallas County

πŸ•’ Dec 12, 2024: Irving City Council approved tax breaks for three QTS data centers.

Approved, not built yet

KDC data center on University of Dallas land (Irving)

Irving, Dallas County

πŸ•’ July 2024: Irving City Council approved rezoning for the data center.

Reported in the news, not confirmed yet

Being built

Google data center (156 N. Austin Blvd., Red Oak)

Red Oak, Ellis County

for Google

πŸ•’ Aug 31, 2023: Google announced a data center in Red Oak costing at least $600 million over several yea…

Reported in the news, not confirmed yet

Status unclear

Circle T data center (Westlake, near Keller)

Westlake, Tarrant County

90 acres

πŸ•’ Aug 18, 2026: Keller City Council voted to take legal action against Westlake over the project.

Proposed

Provident data center (old Santander site, Rufe Snow Drive)

North Richland Hills, Tarrant County

πŸ•’ June 23, 2026: Hundreds of residents attended Provident's information meeting and questioned the develo…

Reported in the news, not confirmed yet

Being built

Aligned DFW-03 data center (3801 Britton Road, Mansfield)

Mansfield, Tarrant County

27 acres

πŸ•’ Feb 19, 2025: Aligned announced a new data center on 27 acres in Mansfield.

Reported in the news, not confirmed yet

Being built

Aligned DFW-04 data center for Lambda (401 N. Star Road, Plano)

Plano, Collin County

44 acres Β· for Lambda (AI cloud company)

Reported in the news, not confirmed yet

Being built

CyrusOne DFW7 campus (Asphalt Drive, Fort Worth)

Fort Worth, Tarrant County

Reported in the news, not confirmed yet

Being built

Prime Data Centers DFW04 campus (Aledo Road and Chapin School Road)

Fort Worth, Tarrant County

πŸ•’ Sept 2024: Construction of the first 48 MW, $545 million building was set to begin.

Reported in the news, not confirmed yet

Being built

Prime Data Centers Garland campus (4221 N. Garland Ave.)

Garland, Dallas County

Reported in the news, not confirmed yet

Proposed

BT Aycock data center (CR 561, east of Princeton)

unknown, Collin County

50 acres

πŸ•’ June 9, 2026: North Texas Groundwater Conservation District approved a water well for the data center.

Reported in the news, not confirmed yet

Stopped or cancelled

Project Tomahawk data center (Prosper, withdrawn)

Prosper, Denton County

37.3 acres

πŸ•’ Sept 1, 2026: Prosper Planning and Zoning Commission voted 7-0 to recommend denial.

Being built

Google Midlothian data center campus (Railport Parkway) - building 5

Midlothian, Ellis County

for Google

πŸ•’ Jan 2026: Construction of an $880 million fifth building (288,000 sq ft) began.

Reported in the news, not confirmed yet

Being built

Lincoln Rackhouse data center campus (Red Oak, 131 acres)

Red Oak, Ellis County

131 acres

Reported in the news, not confirmed yet

Being built

Digital Realty Garland campus expansion (Ferris Road / W. Campbell Road)

Garland, Dallas County

for Wells Fargo (one customer)

πŸ•’ March 2025: Construction of DFW37 (410,000 sq ft, six 8 MW halls, $120 million) was set to begin.

Reported in the news, not confirmed yet

Being built

Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road)

unknown, Harris County

250 acres

πŸ•’ July 2025: Construction of two new buildings (565,000 and 438,000 sq ft, $137 million each) was set…

Reported in the news, not confirmed yet

Status unclear

Data center on the Fannin-Grayson county line (near Savoy)

unknown, Fannin County

πŸ•’ March 17, 2026: Grayson County judge said a data center is being built in Fannin County right on the Gra…

Reported in the news, not confirmed yet

Being built

TRG Datacenters HOU2 (2626 Spring Cypress Road, Spring)

Unincorporated Harris County, Harris County

Reported in the news, not confirmed yet

Proposed

East Texas Energy Campus data center (Clean Holding Company, Newton County)

unknown, Newton County

Reported in the news, not confirmed yet

Being built

Meta El Paso data center campus

El Paso, El Paso County

1,000 acres Β· for Meta

πŸ•’ July 28, 2026: Meta and BlackRock announced a joint venture to own and pay for the campus. Meta will be…

Proposed

Fort Bliss Army data center (Carlyle)

El Paso, El Paso County

1,384 acres

πŸ•’ May 21, 2026: U.S. Rep. Veronica Escobar wrote to the Secretary of the Army asking for more openness. …

Being built

Fermi America Project Matador (HyperGrid) energy and data center campus

Unincorporated Carson County, Carson County

5,800 acres Β· for TensorWave (first tenant, 222 MW); others not announced

πŸ•’ Aug 10, 2026: Fermi signed a 15-year lease with TensorWave for 222 megawatts, starting in the second h…

Being built

Crusoe Goodnight data center campus for Google (near Claude)

Unincorporated Armstrong County, Armstrong County

for Google

πŸ•’ Sept 28, 2026: Crusoe confirmed it is building the campus for Google.

Being built

Google Meitner Energy Center data center (near Pampa)

Unincorporated Gray County, Gray County

for Google

πŸ•’ June 4, 2026: Google and Intersect announced the Meitner Energy Center and started building. An 800-ac…

Proposed

Google Project Roman data center (near Hereford)

Unincorporated Deaf Smith County, Deaf Smith County

3,700 acres Β· for Google

πŸ•’ Aug 27, 2026: Reporting said the project has four phases, with 3,700 acres for the first phase and mor…

Proposed

Zone Frontier data center campus (Potter County)

Unincorporated Potter County, Potter County

4,077 acres

πŸ•’ Sept 29, 2026: Zone Frontier signed a 30-year land lease with an option to buy, for a campus starting a…

Reported in the news, not confirmed yet

Being built

Aligned Data Centers Project Caprock (near Abernathy)

Unincorporated Hale County, Hale County

313 acres

πŸ•’ April 9, 2026: Aligned broke ground on a six-building, 540-megawatt campus on 313 acres.

Being built

Fluidstack Abernathy AI data center (formerly TeraWulf joint venture)

Abernathy, Hale County

120 acres Β· for Fluidstack (AI cloud company); Google backs about $1.3 billion of the lease

πŸ•’ July 6, 2026: TeraWulf sold its 50.1% share to a Fluidstack-led group. Fluidstack now leads the project.

Approved, not built yet

Corva Project Infrared data center (Northeast Lubbock)

Lubbock, Lubbock County

πŸ•’ July 29, 2026: LEDA defended the deal after residents learned of it. It said the project is below the c…

Stopped or cancelled

Texas Solar Works hyperscale data center plan (Northeast Lubbock)

Lubbock, Lubbock County

936 acres

πŸ•’ Jan 16, 2026: The developer withdrew its request before the City Council vote and said it would revise…

Proposed

Amazon Horizon Junction data center campus (Floydada)

Unincorporated Floyd County, Floyd County

485 acres Β· for Amazon Web Services

πŸ•’ Aug 6, 2026: Floyd County commissioners said they were weighing a tax break for an Amazon campus of u…

Reported in the news, not confirmed yet

Being built

GW Ranch off-grid power and Amazon data center campus (north of Fort Stockton)

Unincorporated Pecos County, Pecos County

8,000 acres Β· for Amazon Web Services

πŸ•’ Aug 2026: Amazon filed state building plans for three data center buildings at the site.

Status unclear

Poolside Project Horizon AI campus (near Fort Stockton)

Unincorporated Pecos County, Pecos County

559 acres Β· for Poolside (CoreWeave left the deal in April 2026)

πŸ•’ July 27, 2026: Fort Stockton Board of Adjustment held a hearing on Poolside's request for zoning except…

Proposed

Microsoft Pecos AI data center with Chevron's Project Kilby gas plant

Unincorporated Reeves County, Reeves County

for Microsoft

πŸ•’ June 22, 2026: Microsoft announced a 2-gigawatt data center in Pecos. Chevron signed a 20-year deal to …

Being built

Core Scientific Pecos AI data center expansion

Unincorporated Reeves County, Reeves County

200 acres Β· for unknown (site offered for lease)

πŸ•’ April 27, 2026: Core Scientific said it will grow its Pecos campus to 1.5 gigawatts for AI, with first s…

Proposed

Prometheus Hyperscale Pecos campus

Unincorporated Reeves County, Reeves County

πŸ•’ Aug 24, 2026: Plans were reported for a 1.5-gigawatt off-grid campus near Pecos, growing to about 2.5 …

Reported in the news, not confirmed yet

Proposed

PowerBridge Alpha Digital Campus (LandBridge land near Waha)

Unincorporated Reeves County, Reeves County

3,400 acres

πŸ•’ April 2, 2026: LandBridge and PowerBridge announced a deal for a 2-gigawatt powered data center campus …

Reported in the news, not confirmed yet

Built & running

Cipher Black Pearl AI data center for Amazon (near Wink)

Unincorporated Winkler County, Winkler County

75 acres Β· for Amazon Web Services (15-year lease)

πŸ•’ Aug 2026: First data center space was handed over to Amazon and rent began.

Being built

Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City)

Unincorporated Mitchell County, Mitchell County

250 acres Β· for Fluidstack, with Google backing part of the lease

πŸ•’ Aug 4, 2026: Cipher said the tenant had started using part of the building, with first delivery expec…

Being built

Cipher Stingray AI data center for Amazon (Andrews)

Unincorporated Andrews County, Andrews County

for Amazon Web Services (15-year lease)

πŸ•’ Aug 4, 2026: Cipher said grading, pad work and underground electrical work were underway.

Proposed

Cipher Colchis data center site (northeast of San Angelo)

Unincorporated Tom Green County, Tom Green County

620 acres

πŸ•’ June 2, 2026: Local reporting said the site is outside city limits, so San Angelo cannot regulate it.

Approved, not built yet

Skybox / Emergent data center on city land (San Angelo City Farm)

San Angelo, Tom Green County

350 acres

πŸ•’ June 22, 2026: A petition to recall the mayor over the project failed to get enough signatures.

Proposed

Beacon Data Centers Dove Creek campus (Westline site)

Unincorporated Tom Green County, Tom Green County

1,240 acres

πŸ•’ Aug 10, 2026: Reporting showed the developer applied to TCEQ for an air permit for gas engines, allowi…

Proposed

Texas Critical Data Centers AI campus (near Penwell)

Unincorporated Ector County, Ector County

438 acres

πŸ•’ 2026: Stream Data Centers joined the project. Plans grew to more than 1 gigawatt on about 438 …

Proposed

Sangha Renewables Project Genesis data center (solar-powered)

Unincorporated Ector County, Ector County

for unknown (AI, cloud and computing work planned)

πŸ•’ Sept 2026: ERCOT, the state grid operator, gave the 110-megawatt campus a conditional 'base load' O…

Reported in the news, not confirmed yet

Being built

Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow)

Unincorporated Ward County, Ward County

for Nscale (AI cloud company), serving Microsoft

πŸ•’ Oct 15, 2025: Ionic Digital signed a 10-year, about $2 billion lease with Nscale for its 234-megawatt …

Reported in the news, not confirmed yet

Proposed

FO Permian Partners off-grid data center site (Midland)

Unincorporated Midland County, Midland County

πŸ•’ Sept 4, 2025: FO Permian announced a 150-megawatt off-grid powered site for data centers, with room to…

Reported in the news, not confirmed yet

Built & running

Galaxy Helios AI data center campus for CoreWeave (near Afton)

Unincorporated Dickens County, Dickens County

2,200 acres Β· for CoreWeave (15-year leases)

πŸ•’ July 9, 2026: Galaxy finished Phase I, handing about 200 megawatts of power to CoreWeave.

Built & running

IREN Childress campus (bitcoin mine becoming AI data center for Microsoft)

Unincorporated Childress County, Childress County

for Microsoft (AI cloud contract worth $9.7 billion over five years)

πŸ•’ Aug 13, 2026: IREN said its first 50-megawatt liquid-cooled AI hall at Childress (Horizon 1) was deliv…

Reported in the news, not confirmed yet

Proposed

Crusoe and Lancium 1-gigawatt AI campus (Childress)

Unincorporated Childress County, Childress County

270 acres Β· for An unnamed large tech company ('hyperscaler')

πŸ•’ July 15, 2026: Crusoe and Lancium announced a 1-gigawatt AI data center campus on 270 acres in Childres…

Reported in the news, not confirmed yet

Being built

IREN Sweetwater 1 data center campus

Unincorporated Nolan County, Nolan County

for IREN AI cloud (customers not named for this site)

πŸ•’ May 2026: IREN connected the 1.4-gigawatt Sweetwater 1 substation to the ERCOT grid.

Reported in the news, not confirmed yet

Proposed

IREN Sweetwater 2 data center site

Unincorporated Fisher County, Fisher County

πŸ•’ May 2026: IREN said Sweetwater 2 is planned to join Sweetwater 1 as a 2-gigawatt hub.

Reported in the news, not confirmed yet

Approved, not built yet

Crusoe $7 billion data center (Nolan County, near Sweetwater)

Unincorporated Nolan County, Nolan County

πŸ•’ April 13, 2026: Nolan County commissioners approved a 10-year tax break for the $7 billion Crusoe data c…

Reported in the news, not confirmed yet

Proposed

SB Energy proposed data center (Scurry County)

Unincorporated Scurry County, Scurry County

πŸ•’ Oct 1, 2026: SB Energy held a community open house at the Scurry County Museum in Snyder about the pr…

Reported in the news, not confirmed yet

Being built

Energy Vault AI campus with Crusoe modular data centers (Snyder)

Unincorporated Scurry County, Scurry County

for Crusoe Cloud customers

πŸ•’ July 27, 2026: Energy Vault began building an AI campus in Snyder with 10 Crusoe Spark modular data cen…

Reported in the news, not confirmed yet

Being built

Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County)

Unincorporated Briscoe County, Briscoe County

300 acres Β· for unknown (AI and computing customers)

πŸ•’ April 2, 2026: Soluna bought the 150-megawatt Briscoe wind farm for $53 million and announced Dorothy 3…

Proposed

QTS Howard County data center campus (Big Spring area)

Unincorporated Howard County, Howard County

902 acres

πŸ•’ 2026: QTS posted plans for an 8-building, $10 billion campus on 902 acres in Howard County, wi…

Reported in the news, not confirmed yet

Proposed

InfraTech Capital $2.7 billion data center campus (Carson County, near Amarillo)

Unincorporated Carson County, Carson County

5,000 acres Β· for An unnamed large tech company ('hyperscaler')

πŸ•’ Aug 21, 2026: InfraTech Capital announced plans for a $2.7 billion data center campus on more than 5,0…

Reported in the news, not confirmed yet

Status unclear

Pampa Energy Center data center park (APR Energy / Duos)

Pampa, Gray County

800 acres

πŸ•’ June 2025: Pampa economic development leaders backed APR Energy's 800-acre, 400-megawatt gas-powere…

Reported in the news, not confirmed yet

The rules in Texas

What the state says about data centers, in plain words.

πŸ“œ State laws

SB 6 (2025): rules for very big power users like data centers Β· June 20, 2025
Signed June 20, 2025, and in effect right away. It covers new or bigger hookups of 75 megawatts or more on the main Texas grid (ERCOT). The state utility commission (PUC) must write hookup rules. Big users must: pay a study fee of at least $100,000; prove they own or lease the land; put up money to back the power lines built for them; say if they are asking for power at other Texas sites too; and report on-site backup generators. In a power emergency, ERCOT can tell big users with backup generators to switch to them or cut back. New big users hooked up after December 31, 2025, must have equipment so they can be cut off during rolling blackouts. Hooking a new data center straight to an existing power plant now needs ERCOT study and PUC approval. Big users must help pay to connect. The PUC must review how power-line costs are split between home and business customers and change its rules by December 31, 2026. Source

HB 24 (2025): new zoning notice and protest rules for cities Β· June 20, 2025
In effect September 1, 2025. Cities must now post zoning hearing notices on their website as well as in the newspaper. Home-rule cities must put a notice sign (at least 24 by 48 inches) on the land at least 10 days before the zoning commission hearing. The neighbor protest rule stayed the same for non-housing projects like data centers: if owners of at least 20% of the land in the change, or of the land within 200 feet, sign a written protest, the city council needs a three-fourths vote to approve it. The lower bar in this law only applies to changes that add housing. Source

HB 2559 (2025): limits on city building pauses (moratoriums) Β· June 20, 2025
In effect September 1, 2025. A city that wants to pause new development must hold two public hearings at least 30 days apart, give 30 days' newspaper notice, and pass the pause with a three-fourths vote of the council. A pause ends after 90 days unless the council extends it with written findings, and it can never total more than 180 days. The same kind of pause cannot come back for two years. A state senator has said this law also blocks city data center bans; land use experts quoted by the Texas Tribune disagree, because a zoning change is not a moratorium. Source

Governor's order: data centers must pay their own power costs (June 10, 2026) Β· June 10, 2026
Governor Abbott told the PUC to make sure data center hookups lead to lower home electric bills and that data centers pay all of their power line and hookup costs. He told the PUC to start cutting home customers' power-line (transmission) costs by July 31, 2026. He also said he will ask lawmakers in 2027 to: make data centers add power plants, not just use power; require water-saving cooling such as closed-loop systems; make big data centers report power and water use every year; end the data center sales tax break; and set rules on setbacks and noise. This is an order to state agencies, not a law. Source

Governor's pause: no new data center grid approvals until an audit (August 3, 2026) Β· Aug 3, 2026
Governor Abbott ordered the PUC and ERCOT to check (audit) every data center moving through the grid hookup line before any more are approved. Projects that do not pass must be denied a grid connection. Each project must report: tax breaks, power use and on-site power plants, water use and type of cooling, steps to protect neighbors (noise, lights, setbacks, traffic), and who owns it. ERCOT told the PUC on August 14 that the audit covers about 250 to 300 projects in its first group ('Batch Zero'), about 200 gigawatts in all, and will take 'several months.' The governor said the pause applies statewide, including outside the ERCOT grid. It is an order, not a law. Source

Governor's order: punish data centers that skip the state water survey (September 14, 2026) Β· Sept 14, 2026
State law already says big water users must answer the Texas Water Development Board's yearly water use survey, or face a Class C misdemeanor. Few data centers did: about 30% of the 329 surveyed in 2025. Governor Abbott told the board to enforce the law and to send cases to county or district attorneys. The board says it cannot prosecute anyone itself. The board's update to the governor is due October 14, 2026. Source

Governor's pause: no state environmental permits for data centers until the audit ends (September 21, 2026) Β· Sept 21, 2026
Governor Abbott told the Texas Commission on Environmental Quality (TCEQ) to pause all permits sought by data center projects until ERCOT finishes its review. This reaches projects that make their own power and skip the grid. TCEQ must report back to the governor by October 19, 2026. The letter also says the governor will ask lawmakers to end money incentives for data centers. It is an order, not a law. Source

Next chance for new laws: the 2027 session Β· Jan 2027
The Texas Legislature meets in regular session only in odd years. Its next session starts in January 2027. In 2026, House and Senate committees held study hearings on data center power use, water use, tax breaks and local control. The Senate Finance chair, Sen. Joan Huffman, said she will file a bill to change or repeal the data center sales tax break. People including the agriculture commissioner and some lawmakers asked the governor to call a special session now; we found no special session called on data centers as of October 6, 2026. Source

πŸ’‘ Who pays for the power

What the 2025 law (SB 6) makes big users pay Β· June 20, 2025
For new hookups of 75 megawatts or more on the ERCOT grid: a study fee of at least $100,000; money held as a guarantee for the power lines built to serve them (refunded as the project ramps up); and a share of the cost to connect. City-owned utilities and co-ops that do not offer customer choice must pass the 'reasonable costs' of connecting a big user on to that user. The PUC must review whether the way power-line costs are split (the '4CP' method, based on use at the four summer peak hours) is fair to all customers and fix its rules by December 31, 2026. Source

'Batch Zero': the new line for data centers to join the grid Β· June 18, 2026
On June 18, 2026, the PUC approved ERCOT's new 'batch' process. Instead of studying each request one at a time, ERCOT studies a group of big users (75 megawatts and up) together and decides which power lines are needed. The Texas Tribune reported that developers would have to pay $50,000 per megawatt requested and prove they own or lease the land before being studied. In August ERCOT said it still aims to finish the first batch study by its original April deadline; a full power line plan for the batch is expected in fall 2027. Applications for the next batch were expected in summer 2027. The governor's August 2026 audit now comes first. Source

How much power data centers are asking for Β· Aug 3, 2026
As of August 2026, ERCOT was tracking more than 1,800 big-user requests asking for about 474 gigawatts, more than five times the grid's record peak. About 90% are data centers. Experts and ERCOT say many will never be built. ERCOT's April 2026 draft forecast said peak demand could reach 367,790 megawatts by 2032, compared with the record of 85,508 megawatts in August 2023; ERCOT itself called that forecast likely too high. Source

Governor: data centers must pay all their power line costs Β· July 17, 2026
The governor's June 10, 2026 letter told the PUC to require data centers to pay all of their electric infrastructure costs and to start cutting home customers' transmission costs by July 31, 2026. On July 17, PUC Chair Thomas Gleeson answered with a letter listing steps already taken under SB 6 and asked lawmakers for more power, such as making data centers register with the state and letting regulators talk to data centers directly in an emergency. Exactly how data centers will pay for new power lines is still being worked out. Source

Home electric prices since 2020 Β· Sept 15, 2026
The Texas Tribune, using data from the private marketplace ElectricChoice, reports the average Texas home electric rate rose about 40%, from 11.50 cents per kilowatt-hour in 2020 to 16.11 cents in 2026. The Tribune says rising bills are driven by natural disasters, power line congestion and growing demand. We did not find an official state study that measures how much of this is caused by data centers. Source

πŸ’΅ Tax breaks

State sales tax break for data centers Β· 2015
Since 2013 (expanded in 2015), qualifying data centers do not pay the 6.25% state sales tax on equipment and on electricity. That covers servers, storage, cooling and electrical systems, emergency generators, software and the power they buy. Local sales tax is still due. There are two levels. (1) A building of at least 100,000 square feet that promises 20 jobs in the county and $200 million of investment over 5 years gets 10 years, or 15 years at $250 million or more. (2) A project of at least 250,000 square feet that promises 40 jobs and $500 million gets 20 years. Each site must have a single occupant. The comptroller checks investment and jobs at the 5-year mark and can take the break away. Source

How much the sales tax break costs Β· July 27, 2026
The comptroller estimated in 2025 that the break will cost the state $3.2 billion in sales tax over two years, and nearly $1.8 billion a year by 2030. In 2015 it cost $5.4 million. At a July 27, 2026 Senate hearing, the comptroller's office said 138 data centers qualify, only 20 have been audited, and 6 of those broke the rules (at least 4 did not create the promised jobs). 59 more were certified in 2026, about 10 a month, so the next cost estimate will be 'significantly higher.' The governor, the lieutenant governor and the Senate Finance chair have called for repealing or changing the break in 2027. Source

Local property tax breaks (abatements) Β· Aug 13, 2026
Cities, counties and special districts (not school districts) can cut property taxes on a new project's added value for up to 10 years under Chapter 312 of the Tax Code. Steps: the local government adopts abatement rules after a public hearing; creates a 'reinvestment zone' after a public hearing with 7 days' newspaper notice; and gives at least 30 days' public notice before the meeting where it votes on the deal. The notice must name the owner and applicant and describe the project. Residents can speak at the hearings. Counties often use these deals to add conditions such as road repair. A consultant told the Texas Tribune he knew of no data center project that went ahead without an abatement. Local deals are posted on the comptroller's website. Source

🀐 Secret deals and public records

Secret deals (NDAs) are legal in Texas Β· Aug 10, 2026
No Texas law bans secret deals (NDAs) between data center companies and cities, counties, economic development groups or water agencies. The Texas Tribune found NDAs in several places, for example a river authority that signed one with a developer in 2026, and city officials who said an NDA kept them from answering questions. Texas law lets local governments negotiate business deals in private, but the final vote must be on a public agenda. Companies often use shell companies (LLCs with different names) on public votes and filings. Microsoft said in spring 2026 it would stop using NDAs with local governments. Source

Public records: the Texas Public Information Act Β· Jan 21, 2025
Anyone can ask for Texas government records. You do not have to live in Texas or say why. Ask in writing. The government must release records 'promptly.' If it cannot within 10 business days, it must tell you in writing when they will be ready. If it wants to keep something secret, it must ask the Texas Attorney General for a ruling within 10 business days and send you a copy of its letter. The Attorney General then has 45 business days (plus up to 10 more) to decide. If the government misses the 10-day deadline, the records are presumed public. Source

What data center records are often kept secret Β· July 28, 2026
Texas law lets governments hold back trade secrets and business information that would cause competitive harm, and details of economic development talks while a deal is being negotiated. But once a deal is made, information about tax breaks or other incentives that cost public money is public. The 2025 grid law (SB 6) makes customer-specific information that ERCOT gets about big users confidential. The state comptroller has refused to say how much sales tax each data center saves. Some water utilities, such as San Antonio's SAWS, refuse to release data center water use, citing a law meant to protect household smart-meter data. Source

The grid operator keeps project details private Β· Aug 10, 2026
ERCOT treats project-level data (how much power a site wants, where, and who is building it) as private. It shares only totals, mostly in meeting slides. The PUC's 2026 voluntary data center water survey got few answers, and the PUC asked the Attorney General to let it withhold the results from the Texas Tribune. Source

New in 2025: faster answers and a way to complain Β· Sept 1, 2025
Since September 1, 2025 (HB 4219): if the government has no records, it must tell you in writing within 10 business days. If it wants to hold records back, it must ask the Attorney General within 10 business days and name the exact legal reasons. If it does not answer you as the law requires, you can send a written complaint to the Attorney General, who can require training, stop it from charging you, and order a faster review. Each government must also give the Attorney General an official mail and email address for records requests (HB 4214), and the Attorney General posts them in a public database. Source

Open meetings: votes must be public Β· Aug 11, 2026
The Texas Open Meetings Act requires public notice and public access when city councils, county commissioners courts and school boards meet on official business. They may meet in closed (executive) session on some topics, such as buying or leasing land and some contract talks, but final votes should be taken in public. So a data center deal, tax break or land sale must appear on a public agenda before the vote. Source

πŸ’§ Water

Who controls the water a data center uses Β· Aug 11, 2026
There is no single state approval for a data center's water. It depends on the source. City water: the city or water utility decides, and can set conditions on a new heavy user. Wells: the local groundwater conservation district may know how much is pumped, but not every part of Texas has one. River or lake water: the state owns surface water, so a user needs a water right from the Texas Commission on Environmental Quality (TCEQ), or a deal with a river authority or water district that has one. Wastewater discharge needs a TCEQ permit. Source

State water use survey (Texas Water Development Board) Β· Sept 14, 2026
The Texas Water Development Board (TWDB) plans the state's water supply. Since 2020 it has asked operating data centers that use at least 10 million gallons a year to report their water use. Answering is required by law, but in 2025 only about 30% of 329 data centers did. Survey answers are available only through a public records request. Planned data centers that are not built yet are not surveyed. In September 2026 the governor ordered the board to enforce the law. Source

PUC's 2026 data center water and power survey Β· Aug 3, 2026
Under the state budget law, the PUC and the Water Development Board surveyed data centers and crypto mines in 2026 about water use, cooling, water sources, power demand and on-site power plants. Only 28 of 377 companies notified had answered by June. There is no fine for not answering. The PUC must share the results with the water board and TCEQ and report to the governor and the Legislative Budget Board by the end of 2026. The PUC asked the Attorney General to let it keep the results from the Texas Tribune. Source

🌫️ Air and generators

Air permits for generators and gas plants (TCEQ) Β· July 9, 2026
The Texas Commission on Environmental Quality (TCEQ) issues air permits for data center diesel backup generators and on-site gas power plants. Many get quick 'permits by rule' or 'standard permits,' which do not require public notice or a comment period. Bigger 'major source' permits require the best pollution controls, more review and public comment. Floodlight found at least 38 Texas data centers got the smaller permits since 2024, for more than 2,100 diesel generators. More than half reported nitrogen oxide emissions just under the limits that would require public input (for example 249.1 tons a year where the limit is 250, and 99.8 tons near San Antonio where it is 100). Watchdogs say some projects get a small permit first and expand later. Source

Data center permits paused; a federal rule could cut public input Β· Sept 21, 2026
On September 21, 2026, the governor told TCEQ to pause all permits sought by data center projects until ERCOT's audit is done. TCEQ must report back by October 19, 2026. Separately, on July 7, 2026 the U.S. EPA proposed letting states decide how much public notice and input to give for 'minor' air permits, the kind many data centers use. Written comments were due August 21, 2026. If EPA adopts it, any TCEQ change would still go through its own state rulemaking with public input. Source

πŸ™‹ How to have your say

Who decides a data center near you Β· June 30, 2026
Inside city limits, the city decides. Texas cities zone land: a zoning (planning) commission holds a hearing and recommends, and the city council votes. Outside city limits, the county is in charge, but Texas counties have no general zoning power, so they usually cannot block a data center or stop it by a pause. In 2026, Hill County's pause was dropped after a $100 million lawsuit, and a state senator warned Hood County it had no power to pass one. Counties mainly decide tax breaks (abatements), county roads and septic permits. A developer outside city limits may also ask a city to annex its land; the council votes on that in public (San Marcos said no in 2026). About half of the planned Texas data centers are on unincorporated land. Source

City zoning hearings: notices and how to speak Β· Sept 1, 2025
For a rezoning, the city must mail written notice to property owners within 200 feet at least 10 days before the zoning commission hearing. The city council must hold its own public hearing, with notice in the newspaper and on the city website at least 15 days before. Home-rule cities must also post a sign on the land at least 10 days before the commission hearing. Anyone can speak at these hearings. Ask the city planning office for the case number and staff report. Source

Neighbor protest petition: force a three-fourths vote Β· Sept 1, 2025
If owners of at least 20% of the land being rezoned, or 20% of the land within 200 feet of it, sign a written protest, the city council needs a three-fourths vote of all members to approve the change. Streets and alleys count in the land area, and the area is added up for all the tracts together. Turn in the signed protest before the council votes; ask the city clerk about its deadline and form. Source

Appeal deadline: 10 days for board of adjustment decisions Β· Aug 30, 1999
A city board of adjustment decides variances and appeals of the zoning officer. If you were harmed by its decision, or you are a taxpayer, you can ask a district or county court to review it. You must file a sworn (verified) petition within 10 days after the decision is filed in the board's office. This is a very short deadline. A city council's rezoning vote is a law-making act and is challenged differently; talk to a lawyer quickly. Source

What you can ask your county to do Β· Feb 13, 2026
County commissioners courts vote in public on tax breaks (abatements). They can say no, or put conditions in the deal, such as road repairs, noise and light limits, setbacks or local hiring. Many Texas counties have also passed resolutions asking the state for more power and more information about data centers. Watch the commissioners court agenda, sign up to speak, and ask whether any NDA was signed. Source

How to file a public records request in Texas Β· Jan 21, 2025
1) Find the agency's public information officer (city secretary, county clerk, water utility, or state agency). 2) Send a written request by email, mail or the agency's online portal. 3) Be specific, for example: 'all NDAs, letters and emails with [company] about a data center, January 2025 to today.' 4) Anyone may ask; you do not need to be a Texan or give a reason. 5) Mark your calendar: if the agency wants to withhold records, it must ask the Attorney General within 10 business days and copy you. 6) You can send the Attorney General your own arguments. If the agency refuses to follow the law, you can complain to your county or district attorney or file suit. Source

Where to look for clues about a project Β· Aug 11, 2026
Check city and county meeting agendas for zoning cases and tax abatements. Look up the land owner on the county appraisal district website. Search the state comptroller's lists of data centers with sales tax breaks and of local tax deals. Search the Texas Department of Licensing and Regulation (TDLR) building registrations, which list owner, location and cost. Search TCEQ for air permits for generators or gas plants. Ask the local groundwater district or water utility about water deals. Source

How to track and comment on TCEQ permits Β· Aug 11, 2026
Search TCEQ's central registry and its lists of pending air permit applications (new source review and federal operating permits). Only some permits require public notice and input before they are approved. Permits by rule and standard permits often have none, so look early. A federal operating permit may be the first chance to comment. The nonprofit Air Alliance Houston keeps a map of air permit notices. Public Citizen, Save Our Springs and Environment Texas published a guide to tracking data center permits. Source

How to speak up at the utility commission (PUC) Β· Aug 28, 2026
The PUC decides grid hookup rules, power line routes and how costs are split. People can speak during PUC open meetings; landowners and lawmakers testified at the August 14 and August 28, 2026 meetings on data centers and power lines. If a new power line case (called a 'CCN') may cross your land, you get a letter. You can file to take part (intervene) in the case, but deadlines are short; some landowners said they had 21 days to respond. On August 28, 2026 the PUC approved two 765,000-volt Oncor lines in West Texas despite hundreds of landowner protests. Source

🧾 Help with your bills

CEAP: help paying electric and gas bills Β· Aug 13, 2026
The Comprehensive Energy Assistance Program (CEAP) is Texas's federally funded (LIHEAP) utility bill help for low-income households. Local agencies run it in all 254 counties, and it also teaches ways to lower energy costs. To find your local agency, use the state housing agency's 'Help for Texans' page or call 2-1-1. Source

Free home weatherization Β· Aug 13, 2026
The Weatherization Assistance Program helps lower utility bills by making homes more energy efficient. Find a local provider on the state housing agency's 'Help for Texans' page. Source

2-1-1 Texas: find local bill help Β· Oct 6, 2026
Call 2-1-1 or search 211texas.org for local help with electric, gas and water bills, payment plans, utility deposits and disconnection protection. Source

πŸ“ž Who to contact

Public Utility Commission of Texas (PUC) Β· Oct 6, 2026
Oversees ERCOT and the power companies. Sets grid hookup rules for big users, approves new power lines, and decides how costs are split. Running the data center audit with ERCOT. Source

ERCOT (Electric Reliability Council of Texas) Β· Oct 6, 2026
Runs the main Texas power grid (about 90% of the state's power use). Studies data center hookup requests in 'batches' and plans power lines. Source

Texas Commission on Environmental Quality (TCEQ) Β· Oct 6, 2026
Issues air permits (generators, gas plants), water rights for river and lake water, and wastewater permits. Data center permits have been paused since September 21, 2026. Source

Texas Water Development Board (TWDB) Β· Oct 6, 2026
Plans the state's water supply and runs the yearly water use survey that data centers must answer. Source

Texas Comptroller of Public Accounts Β· Oct 6, 2026
Runs the data center sales tax break, lists the data centers that qualify, and posts local tax abatement deals. Source

Texas Attorney General, Open Government Β· Oct 6, 2026
Rules on whether records can be withheld under the Public Information Act and takes complaints when a government does not respond. Source

Texas Department of Licensing and Regulation (TDLR), TABS search Β· Oct 6, 2026
Big building projects register here for accessibility review. The TABS search shows owner, location and estimated cost, and can reveal data center buildings early. Source

Groundwater conservation districts (map) Β· Oct 6, 2026
Local districts that manage well water. The Texas Alliance of Groundwater Districts keeps a map with contacts. Source

Texas Legislature Online Β· Oct 6, 2026
Look up bills, hearings and votes. The next regular session starts in January 2027. Source

Office of the Governor Β· Oct 6, 2026
Issued the 2026 orders on data center costs, the grid audit, water reporting and the TCEQ permit pause. Source

Texas Department of Housing and Community Affairs (TDHCA) Β· Oct 6, 2026
Runs the CEAP bill help and weatherization programs through local agencies. Source

Counties

Bold counties have at least one data center project.