All projects
Newest activity first. Click one to see the details.
Stargate AI data center campus (Lancium Clean Campus, Abilene)
Abilene, Taylor County
800 acres Β· for Oracle for OpenAI
π May 2026: Buildings 3 and 4 began operating.
Being builtCrusoe 900 MW AI campus for Microsoft (Abilene)
Abilene, Taylor County
for Microsoft
π March 27, 2026: Crusoe announced a 900-megawatt expansion in Abilene for Microsoft, with its own on-siteβ¦
Being builtVantage 'Frontier' AI data center campus (Shackelford County)
Unincorporated Shackelford County, Shackelford County
1,200 acres Β· for Oracle / OpenAI (reported)
π Aug 2025: Vantage announced the $25 billion Frontier campus; construction had already begun.
Being builtGoogle data center campuses (Haskell County)
Unincorporated Haskell County, Haskell County
for Google
π Nov 14, 2025: Google announced $40 billion for Texas, including two data centers in Haskell County.
Approved, not built yetCrusoe data center project (Haskell County)
Unincorporated Haskell County, Haskell County
2,042 acres
π June 23, 2026: County and Haskell DC Owner LLC signed the tax break agreement.
Being builtGoogle data center 'Project Rise' (Wilbarger County, near Vernon)
Unincorporated Wilbarger County, Wilbarger County
for Google
π March 31, 2026: Construction start date listed in state building filings for Project Rise 1A and 2A.
Being builtRowan 'Project Temple' data center campus, incl. Lasso building (Temple)
Temple, Bell County
π Sept 3, 2026: City Council held a first hearing on annexing land and a tax break for Lasso; residents β¦
Being builtRowan 'Project Stampede' and 'Project Ranger' data centers (Temple)
Temple, Bell County
π May 7, 2026: Council approved annexation, zoning and utility items for a three-phase Rowan data centeβ¦
Built & runningMeta AI data center (Temple)
Temple, Bell County
399 acres Β· for Meta
π July 22, 2026: Meta opened the data center.
ProposedCloudHQ SAT data center campus (Texas Research Park)
Unincorporated Bexar County, Bexar County
123 acres
π May 2023: University of Texas System sold about 123.4 acres at Texas Research Park to CloudHQ; sitβ¦
Being builtVantage TX1 data center campus, TX11 and TX12 (Texas Research Park)
Unincorporated Bexar County, Bexar County
58 acres
π July 2026: Environmental groups (Environmental Integrity Project, Sierra Club, Public Citizen) sentβ¦
Being builtVantage data center site, TX21 and TX22 (Westover Hills, San Antonio)
San Antonio, Bexar County
31 acres
π Oct 2025: Vantage filed state plans for TX22 (214,525 sq ft, $272 million), construction Oct. 2025β¦
Being builtMicrosoft data centers SAT14, SAT15, SAT16 (Westover Hills, San Antonio)
San Antonio, Bexar County
for Microsoft
π March 2024: Microsoft filed state plans for SAT16, a 245,000-square-foot, $215 million building at 3β¦
ProposedAmazon 'Lavender Hill' data center (State Highway 211)
Unincorporated Bexar County, Bexar County
for Amazon Web Services
π March 25, 2026: Amazon filed state plans for a new two-story Lavender Hill data center.
Reported in the news, not confirmed yet
ProposedAmazon 'Bitter Blue' data center (Donop Road, San Antonio)
San Antonio, Bexar County
for Amazon Web Services
π March 2026: Amazon Data Services filed state plans for the Bitter Blue data center.
Reported in the news, not confirmed yet
ProposedCOPT Potranco data center shell building (San Antonio)
San Antonio, Bexar County
for unknown (Amazon reported as possible)
π March 2026: COPT filed state plans for a $25 million data center shell building.
Reported in the news, not confirmed yet
Built & runningStream Data Centers San Antonio III campus (West Military Drive)
San Antonio, Bexar County
135 acres
π June 26, 2024: Stream broke ground on its third San Antonio campus.
Reported in the news, not confirmed yet
ProposedQTS San Antonio III data center site (Omicron subdivision)
Unincorporated Bexar County, Bexar County
48 acres
π May 10, 2023: San Antonio Planning Commission considered QTS's request to create the Omicron Subdivisiβ¦
Reported in the news, not confirmed yet
Being builtMicrosoft data center campus SAT80-SAT82 (FM 471 and Potranco Road, near Castroville)
Unincorporated Medina County, Medina County
206 acres Β· for Microsoft
π Dec 2025: Microsoft filed plans for a $400 million, 195,670-square-foot building at 3580 FM 471 Noβ¦
Being builtMicrosoft data center campus SAT89-SAT91 (U.S. 90 West, near Castroville)
Unincorporated Medina County, Medina County
for Microsoft
π March 2025: Microsoft filed state plans for two buildings (SAT89 and SAT90) at 2995 U.S. 90 West, coβ¦
ProposedCyrusOne data center SAT14A (U.S. 90 West, near Castroville)
Unincorporated Medina County, Medina County
244 acres
π July 2026: CyrusOne filed state plans for project SAT14A; Medina County created a tax zone for the β¦
Reported in the news, not confirmed yet
Approved, not built yetRowan 'Project Cinco' data center campus (west of Lytle)
Unincorporated Medina County, Medina County
440 acres
π April 28, 2025: Lytle City Council approved an 80% tax break, 5-0.
ProposedTract Caldwell Valley Technology Park (near Uhland)
Unincorporated Caldwell County, Caldwell County
2,973 acres
π Jan 2026: Tract added 1,458 acres, bringing the park to almost 3,000 acres and up to 4 gigawatts.
ProposedPowerHouse data center in Caldwell Valley Technology Park (near Uhland)
Unincorporated Caldwell County, Caldwell County
500 acres
π May 2026: PowerHouse filed a petition to release its site from Uhland's jurisdiction so it can go β¦
Being builtPrime Data Centers AUS01 and AUS02 (Bob White Road, near Lockhart)
Unincorporated Caldwell County, Caldwell County
206 acres
π May 2026: Prime filed state plans for AUS01 and AUS02; construction set to start June 2026.
Reported in the news, not confirmed yet
Approved, not built yetEdged Austin data center campus (Maxwell)
Unincorporated Caldwell County, Caldwell County
330 acres
π May 2026: Edged filed state plans for the first building; construction set for June 2026 to June 2β¦
Reported in the news, not confirmed yet
Being builtCloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels)
Unincorporated Guadalupe County, Guadalupe County
706 acres
π April 21, 2026: Guadalupe County Commissioners Court approved a $500 million tax break and a developmentβ¦
Stopped or cancelledHighlander SM One data center (Francis Harris Lane, San Marcos)
San Marcos, Hays County
200 acres
π Feb 18, 2026: San Marcos City Council voted 5-2 to deny a land use change for the data center.
ProposedSabey data center campus (Centerpoint Road, San Marcos)
San Marcos, Hays County
786 acres
π June 3, 2025: San Marcos City Council approved starting negotiations on a development agreement with Sβ¦
Reported in the news, not confirmed yet
ProposedLegacy Investing data center (1000 Bolton Road, Marion)
Marion, Guadalupe County
39 acres
π June 2026: Legacy Investing announced the 50 MW project on the former San Antonio Karting Complex sβ¦
Reported in the news, not confirmed yet
Being builtSkybox PowerCampus Austin (Hutto)
Hutto, Williamson County
220 acres
π Nov 2023: State filing for the first Hutto building; construction set for Jan. to Nov. 2024.
Reported in the news, not confirmed yet
Built & runningSkybox Austin data center campus (Pflugerville)
Pflugerville, Travis County
π Nov 2023: State filing for Skybox Austin 2 in Pflugerville; construction set for Dec. 2023 to Oct.β¦
Reported in the news, not confirmed yet
Approved, not built yetColovore 'Project Raptor' data center (Hutto)
Hutto, Williamson County
π Dec 2024: Hutto City Council granted a site use permit for the data center.
Reported in the news, not confirmed yet
Stopped or cancelledZydeco 'Project Hutto' data center (Ed Schmidt Blvd, Hutto)
Hutto, Williamson County
π April 2026: Zydeco withdrew its rezoning request; the special Planning and Zoning meeting set for Apβ¦
Reported in the news, not confirmed yet
ProposedIron Mountain 'Taylor Meadows' data center campus (FM 3349, near Hutto and Taylor)
Unincorporated Williamson County, Williamson County
500 acres
π March 2026: Iron Mountain presented the Taylor Meadows project to Hutto City Council with a sewer seβ¦
Reported in the news, not confirmed yet
Proposed'Project Mustang' data center campus (east of Taylor)
Unincorporated Williamson County, Williamson County
665 acres
π Sept 2026: Developers withdrew their annexation and zoning request with the City of Taylor.
Reported in the news, not confirmed yet
Approved, not built yetKDC 'Project Comal' data center campus (Taylor)
Taylor, Williamson County
220 acres
π March 26, 2026: Taylor City Council voted unanimously to annex and zone the land for the data center.
Reported in the news, not confirmed yet
Approved, not built yetBlueprint data center campus (MLK Jr. Drive, Taylor)
Taylor, Williamson County
π Oct 2025: A state district judge dismissed a lawsuit against Blueprint.
Approved, not built yetMesone data center (County Road 305, Jarrell)
Jarrell, Williamson County
150 acres
π Oct 14, 2025: City Council annexed the land and changed its land use and zoning to allow the data centβ¦
Reported in the news, not confirmed yet
ProposedSkybox data center (Old Settlers Blvd and Kiphen Road, Round Rock)
Round Rock, Williamson County
30 acres
π Nov 5, 2025: Round Rock Planning and Zoning Commission gave preliminary approval.
Reported in the news, not confirmed yet
Being builtSwitch 'The Rock' data center campus (Round Rock)
Round Rock, Williamson County
π Oct 26, 2023: Round Rock City Council unanimously rezoned 32.48 acres for a Switch data center.
Reported in the news, not confirmed yet
Being builtSabey Data Centers Austin campus (Round Rock)
Round Rock, Williamson County
π July 2025: Sabey announced its second building, under construction.
Reported in the news, not confirmed yet
ProposedAmazon data center site (County Road 172, Round Rock)
Round Rock, Williamson County
149 acres Β· for Amazon Web Services
π Dec 2023: Amazon sought a Planning and Zoning recommendation to annex and rezone the land, adding β¦
Reported in the news, not confirmed yet
ProposedSwitch data center expansion (Smith School Road, Austin)
Austin, Travis County
π Feb 2024: Switch filed site plans with the City of Austin for a new building.
Reported in the news, not confirmed yet
Status unclearCosmos Technology Campus (former 3M site, Four Points, Austin)
Austin, Travis County
for SoftBank affiliate (Silver Bands 3)
π Sept 2026: SEC filing showed about $1 billion in financing and a 15-year lease to a SoftBank affiliβ¦
Reported in the news, not confirmed yet
Built & runningTesla Cortex AI data centers (Giga Texas)
Unincorporated Travis County, Travis County
for Tesla
π April 2026: Tesla said its Cortex 2 AI training cluster at Giga Texas was online.
Reported in the news, not confirmed yet
Approved, not built yetSailfish 'Comanche Circle' data center campus (near Tolar)
Unincorporated Hood County, Hood County
2,100 acres
π June 9, 2026: Commissioners Court approved the concept plan without conditions, 3-1.
Stopped or cancelled'Fort Spunky' data center (Pacifico Energy, Hood County)
Unincorporated Hood County, Hood County
862 acres
π 2026: Pacifico Energy sued Hood County, saying it lacked power to deny the project over water.
Reported in the news, not confirmed yet
Status unclear'Project Red' and 'Project Yellow' data centers (Hood County)
Unincorporated Hood County, Hood County
677 acres
π July 21, 2026: District Judge Bryan Bufkin dismissed the developers' lawsuit with prejudice.
Approved, not built yetBilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury)
Granbury, Hood County
2,000 acres
π July 13, 2026: Residents filed petitions to recall the mayor and most council members.
Status unclearAmazon 'Project Spectrum' data center campus (Coates Road, near Comanche Peak)
Unincorporated Hood County, Hood County
1,265 acres Β· for Amazon Web Services
π May 26, 2026: Hood County Commissioners Court accepted the conditional plan, 3-0 (two commissioners abβ¦
Reported in the news, not confirmed yet
Approved, not built yetAmazon data center campus at Comanche Peak nuclear plant (Somervell County)
Unincorporated Somervell County, Somervell County
435 acres Β· for Amazon Web Services
π Feb 2026: Somervell County Commissioners Court voted to move forward with a development agreement β¦
Reported in the news, not confirmed yet
Built & runningMARA (Marathon) bitcoin mining data center (Granbury area)
Unincorporated Hood County, Hood County
for Marathon (bitcoin mining)
π 2023: Marathon Digital bought the Granbury site from Generate Capital for $178.6 million.
Reported in the news, not confirmed yet
Being builtCyrusOne data center at Calpine's Thad Hill Energy Center (Bosque County)
Unincorporated Bosque County, Bosque County
π Nov 3, 2025: They added 210 MW, for 400 MW in total.
Reported in the news, not confirmed yet
Approved, not built yetTexas Data Center Campus (Wichita Falls Business Park)
Wichita Falls, Wichita County
225 acres
π Oct 2025: City Council approved selling more than 225 acres in the business park for a data centerβ¦
Reported in the news, not confirmed yet
ProposedCalvano hyperscale data center (Northwest Freeway and City View Drive, Wichita Falls)
Wichita Falls, Wichita County
227 acres
π Nov 5, 2024: Wichita Falls City Council rezoned about 227 acres from residential to light industrial β¦
Reported in the news, not confirmed yet
Stopped or cancelledAirport Drive data center rezoning (Wichita Falls)
Wichita Falls, Wichita County
π May 5, 2026: City Council voted unanimously to deny the rezoning.
Reported in the news, not confirmed yet
ProposedBolt Data and Energy 'Project North' (west of Albany)
Unincorporated Shackelford County, Shackelford County
π Aug 12, 2026: Residents heard from the developer at a town hall at Albany High School.
Reported in the news, not confirmed yet
ProposedPowerPlay AI and Sharon AI gas-powered data center (near Abilene)
Unincorporated Taylor County, Taylor County
π July 2026: PowerPlay AI and Sharon AI announced the 400 MW joint venture.
Reported in the news, not confirmed yet
ProposedFluidStack data center (outside Harlingen)
Unincorporated Cameron County, Cameron County
π Sept 2, 2026: Harlingen City Commission tabled FluidStack's drainage agreement after residents raised β¦
Reported in the news, not confirmed yet
Built & runningSoluna 'Project Kati' bitcoin and AI data center (Willacy County)
Unincorporated Willacy County, Willacy County
for Bitcoin mining and AI customers
π Sept 8, 2026: Soluna energized the last 14 MW of Kati 1 and got conditional ERCOT approval for all 166β¦
Reported in the news, not confirmed yet
ProposedSoluna 'Project Hedy' crypto and AI data center (Cameron County)
Unincorporated Cameron County, Cameron County
π April 2025: Soluna signed a power supply agreement with a wind farm owner for Project Hedy.
Reported in the news, not confirmed yet
ProposedSoluna 'Project Ellen' crypto and AI data center (South Texas wind farm)
Unincorporated Cameron County, Cameron County
π April 17, 2025: Soluna announced a power term sheet for Project Ellen.
Reported in the news, not confirmed yet
Being builtPeak Mining bitcoin data centers (Corpus Christi area)
Unincorporated Nueces County, Nueces County
for Bitcoin mining
π May 24, 2024: Peak Mining announced it bought a second 300 MW site next to its first, which was under β¦
Reported in the news, not confirmed yet
ProposedEnergy Abundance 'Data City' (near Laredo)
Unincorporated Webb County, Webb County
50,000 acres
π March 2025: Energy Abundance announced Data City near Laredo.
Reported in the news, not confirmed yet
ProposedMisae 'Mojo Ranch' AI data center and energy project (north of Stockdale)
Unincorporated Wilson County, Wilson County
2,700 acres
π Feb 2026: More than 140 residents met in Stockdale to raise concerns about water, noise and light.
Reported in the news, not confirmed yet
ProposedCipher 'Reveille' data center site (Cotulla area)
Unincorporated La Salle County, La Salle County
π Feb 2026: Cipher's annual report listed Reveille (up to 70 MW, power expected 2027).
Reported in the news, not confirmed yet
ProposedCipher 'Mikeska' data center site (McCulloch County)
Unincorporated McCulloch County, McCulloch County
π Feb 2026: Cipher exercised its option on the Mikeska site.
Reported in the news, not confirmed yet
ProposedTract 'Applewhite Technology Park' (south San Antonio)
San Antonio, Bexar County
339 acres
Reported in the news, not confirmed yet
ProposedBlack Mountain Power site (State Highway 16 and Lone Star Pass, south San Antonio)
San Antonio, Bexar County
432 acres
π Jan 2026: Black Mountain Power LLC bought 432 acres at SH 16 and Lone Star Pass.
Reported in the news, not confirmed yet
ProposedTract 'Medina Technology Park' (U.S. 90 W and CR 4516, near Castroville)
Unincorporated Medina County, Medina County
265 acres
π May 2026: Medina County residents spoke out against the planned technology park.
Reported in the news, not confirmed yet
Stopped or cancelledRowan Moriah data center (Bob White Road, Temple)
Temple, Bell County
π 2024: The tenant left the building.
ProposedAmpZ Champion AI data center (old Southland Paper Mill, near Lufkin)
Unincorporated Angelina County, Angelina County
1,000 acres
π Aug 25, 2026: Commissioners hired a law firm to help write tax break deals for data centers.
Being builtHyperDataGrid data center (old Northern Chip Mill, Hwy 103 West)
Unincorporated Angelina County, Angelina County
40 acres
π July 9, 2026: County judge said HyperDataGrid had power and water deals and had started clearing land.
Reported in the news, not confirmed yet
Approved, not built yetProvident / PowerHouse hyperscale campus (Grand Prairie, Ellis County)
Grand Prairie, Ellis County
768 acres
π Feb 25, 2025: Developers announced a 24-building, 768-acre campus with a 1.8-gigawatt switchyard.
Reported in the news, not confirmed yet
Approved, not built yetCompass Datacenters 830-acre campus (Red Oak)
Red Oak, Ellis County
830 acres
π June 2, 2026: Compass announced a $15 million grant for an animal shelter in Ellis County.
Being builtDataBank Red Oak campus (Stainback Road)
Red Oak, Ellis County
292 acres
π Nov 5, 2024: DataBank filed a $265 million, 425,000 sq ft second building (DFW10) on its 292-acre camβ¦
Reported in the news, not confirmed yet
Being builtSTACK Infrastructure DFW02 campus (Lancaster)
Lancaster, Dallas County
102 acres
Reported in the news, not confirmed yet
Being builtNexus Apex DFW campus (near Hubbard)
Unincorporated Hill County, Hill County
2,000 acres
π June 2026: Company filed state building plans and an air permit request for its gas plant.
Built & runningRiot Platforms Rockdale site (bitcoin mine turning into AI data center)
Unincorporated Milam County, Milam County
200 acres Β· for AMD (first tenant, 50 MW)
π May 1, 2026: AMD added 25 MW, for 50 MW in total.
Being builtRiot Platforms Corsicana campus (1 GW)
Unincorporated Navarro County, Navarro County
π 2023: Construction began; site running by 2024.
Reported in the news, not confirmed yet
Built & runningBitdeer Rockdale site (bitcoin mine, planned AI expansion)
Unincorporated Milam County, Milam County
200 acres
π Sept 5, 2026: Bitdeer bought 200 acres for $100 million to plan AI and high-power computing.
Reported in the news, not confirmed yet
Being builtCore Scientific / CoreWeave AI data center (Jim Christal Road, Denton)
Denton, Denton County
78.85 acres Β· for CoreWeave (planned user, per 2024 reports)
π Nov 19, 2024: City Council voted to lease 78.85 acres of city land and approve a new power deal for thβ¦
Approved, not built yetQumulusAI modular data center (Denton)
Denton, Denton County
4 acres
π Jan 13, 2026: City Council approved the permit and a tax break for 8 prefab data center 'pods' on 4 acβ¦
Reported in the news, not confirmed yet
Approved, not built yetBlack Mountain data center campus (southeast Fort Worth)
Fort Worth, Tarrant County
431 acres
π Aug 2026: City Council approved a revised plan with a substation and setbacks of more than 300 feeβ¦
ProposedEdged data center (Veale Ranch, west Fort Worth)
Fort Worth, Tarrant County
186 acres
π March 31, 2026: City Council voted to delay a decision on a 50% tax break.
Being builtQTS Fort Worth campus expansion (FTW1, 14100 Park Vista Blvd.)
Fort Worth, Tarrant County
53 acres
π 2026: QTS filed a $300 million, 147,946 sq ft addition (FTW1 DC1 Expansion), July 2026 to Oct.β¦
Reported in the news, not confirmed yet
ProposedColovore Alliance AI data center (AllianceTexas)
Fort Worth, Denton County
π Sept 30, 2026: Colovore filed plans for a $430 million, 156,500 sq ft liquid-cooled data center.
Reported in the news, not confirmed yet
Being builtOpenAI Stargate data center (Milam County, near Burlington)
Unincorporated Milam County, Milam County
for OpenAI
π May 4, 2026: Photo showed construction under way near Burlington.
Being builtAmazon (AWS) data center campus near Boling
Unincorporated Wharton County, Wharton County
3,000 acres Β· for Amazon Web Services
π Sept 8, 2026: Coastal Bend Groundwater Conservation District approved permits for three more wells.
Reported in the news, not confirmed yet
Being builtCyrusOne campus at Freestone Energy Center (near Fairfield)
Unincorporated Freestone County, Freestone County
π 2026: State building filings for three buildings (about 918,650 sq ft, $1.5 billion) were repoβ¦
Reported in the news, not confirmed yet
ProposedCrusoe AI campus at the Port of Victoria (Blue Energy power)
Unincorporated Victoria County, Victoria County
1,600 acres
π June 23, 2026: Blue Energy applied for local property tax breaks for the power plant.
Reported in the news, not confirmed yet
Status unclearProject Aquila (RCM Hill, unincorporated Hill County)
Unincorporated Hill County, Hill County
800 acres
π May 28, 2026: RCM Hill sued Hill County in federal court in Waco, calling the pause illegal.
ProposedProvident data center on Hillsboro EDC land
Hillsboro, Hill County
300 acres
π April 24, 2026: Many residents spoke against the plan at a public meeting.
Reported in the news, not confirmed yet
ProposedMARA computing campus (former HIF fuels site, Matagorda County)
Unincorporated Matagorda County, Matagorda County
1,200 acres
π July 9, 2026: MARA signed a deal to buy the 1,200-acre site from HIF USA for AI computing and possiblyβ¦
Reported in the news, not confirmed yet
Status unclearLAMP data center and power hub (BaRupOn, near Raywood)
Unincorporated Liberty County, Liberty County
700 acres
π May 22, 2026: County attorney said the company restarted building without permits and must pay fines.
Reported in the news, not confirmed yet
ProposedOld Ocean data center campus (Nightpeak Energy, near Sweeny)
Unincorporated Brazoria County, Brazoria County
158 acres
π March 2026: Brazoria County commissioners unanimously rejected the tax break requests.
Reported in the news, not confirmed yet
ProposedCrusoe data center (Kahla Project, Leon County)
Unincorporated Leon County, Leon County
π July 13, 2026: Leon County commissioners rejected Crusoe's first tax break application as incomplete; 2β¦
Reported in the news, not confirmed yet
ProposedPort Arthur AI data center (planned near Entergy Legend plant)
Port Arthur, Jefferson County
42 acres
π Jan 14, 2026: Chamber of Commerce briefed contractors on a $1.3 billion AI data center plan.
Reported in the news, not confirmed yet
ProposedRaeden AI data center (old glass bottle plant, Jacinto City)
Jacinto City, Harris County
30 acres
π Sept 11, 2026: City held a town hall with residents and the company.
ProposedViridien computing center (Longwood Drive, Brenham)
Brenham, Washington County
21 acres
π Jan 8, 2026: Brenham City Council unanimously rejected a reinvestment zone for the project.
Being builtEdgeConneX Cedar Creek campus 1 (FM 535 and Wolf Lane)
Unincorporated Bastrop County, Bastrop County
112 acres Β· for CoreWeave
π May 27, 2026: First 578,000 sq ft building was nearly finished.
Being builtEdgeConneX Cedar Creek campus 2 (6682 and 6402 FM 535)
Unincorporated Bastrop County, Bastrop County
951 acres
π June 16, 2026: Town halls held in Elgin, Smithville (June 17) and Bastrop (June 18).
ProposedEdgeConneX Cedar Creek campus 3 (6543 FM 535)
Unincorporated Bastrop County, Bastrop County
400 acres
Reported in the news, not confirmed yet
ProposedPacifico Cedar Creek gas plant and data center campus (Earl Callahan Road)
Unincorporated Bastrop County, Bastrop County
2,842 acres
π Aug 19, 2026: Developers withdrew both county tax break requests.
Approved, not built yetRELLIS data and research center (Texas A&M RELLIS Campus)
Bryan, Brazos County
π Aug 18, 2026: Brazos County commissioners voted 4-0 to move the tax deal to the new owner, ThisWay Gloβ¦
Stopped or cancelledProject Aggie AI data center (Midtown Business Park, College Station)
College Station, Brazos County
200 acres
π Sept 11, 2025: City Council voted unanimously to reject the land sale after nearly six hours of public β¦
Being builtCleanSpark AI data center campus (Austin County)
unknown, Austin County
271 acres
π Oct 29, 2025: CleanSpark announced it bought rights to 271 acres and signed 285 MW of power deals.
Reported in the news, not confirmed yet
ProposedCleanSpark AI data center site (Brazoria County)
unknown, Brazoria County
447 acres
Reported in the news, not confirmed yet
Stopped or cancelledDiode Ventures data center near Cedar Creek Reservoir (canceled)
unknown, Henderson County
π July 23, 2026: Diode Ventures said it was pulling the project, saying it could not meet the governor's β¦
Stopped or cancelledData Factory data center (Athens)
Athens, Henderson County
π Aug 24, 2026: City Council voted 3-2 for an ordinance banning data centers (over 500 sq ft of servers).
Reported in the news, not confirmed yet
Stopped or cancelledVulcan Core bitcoin mine / data center (W. Erwin St., Tyler)
Tyler, Smith County
for Barrio (data center operator, planned tenant)
π July 7, 2026: Tyler Planning and Zoning Commission voted 5-2 to deny the permit, as city staff advised.
Reported in the news, not confirmed yet
Status unclearCyrusOne data center on old Thermo mine land (near Sulphur Springs)
Unincorporated Hopkins County, Hopkins County
π Sept 24, 2026: CyrusOne held a community meeting at the Hopkins County Civic Center.
Reported in the news, not confirmed yet
ProposedProposed Delta County data center
unknown, Delta County
π March 2, 2026: County held a public town hall at Cooper ISD High School.
Reported in the news, not confirmed yet
ProposedProject Big Pine (TexAmericas Center)
unknown, Bowie County
500 acres
π April 28, 2026: TexAmericas Center and Potentia announced they are moving forward with a 500-acre campus.
Reported in the news, not confirmed yet
ProposedDatahub Developers AI data center (East Texas Logistics Center, I-30)
unknown, Bowie County
π Sept 24, 2026: Residents objected to the land sale for a data center.
Reported in the news, not confirmed yet
Proposed1606 Corp. AI data center at a Lufkin power plant
Lufkin, Angelina County
132 acres
π 2026: 1606 Corp. signed a non-binding term sheet to buy the plant and 132 acres for about $11.β¦
Reported in the news, not confirmed yet
ProposedCore Scientific / Telios AI data center campus (Wieland, Hunt County)
Unincorporated Hunt County, Hunt County
265 acres
π March 24, 2026: Core Scientific and Telios spoke to the Hunt County Commissioners Court.
Reported in the news, not confirmed yet
ProposedBT Gateway AI data center (Giga Energy, near Royse City)
Unincorporated Hunt County, Hunt County
30 acres
π June 2026: BT Gateway Data Center LLC filed state plans for a $384 million, 100,000 sq ft AI data cβ¦
Reported in the news, not confirmed yet
ProposedPrometheus Hyperscale campus (between Talty and Post Oak Bend City)
unknown, Kaufman County
500 acres
Reported in the news, not confirmed yet
ProposedBlack Mountain data center (near Bells)
unknown, Grayson County
π March 17, 2026: Residents filled Grayson County Commissioners Court with concerns.
ProposedHedgehog USA powered land data center campus (Navarro County)
unknown, Navarro County
Reported in the news, not confirmed yet
ProposedInfrakey data district (west of Elm Mott)
Lacy-Lakeview, McLennan County
520 acres
π Dec 9, 2025: City Council voted 6-1 to approve an agreement and annex 520 acres.
ProposedCipher Digital data center campus (near Riesel, Sandy Creek coal plant)
Unincorporated McLennan County, McLennan County
Reported in the news, not confirmed yet
Approved, not built yetGalaxy Project Merlin data center (McGregor industrial park)
McGregor, McLennan County
500 acres
π June 2026: McGregor City Council approved plans for the data center.
Reported in the news, not confirmed yet
ProposedYondr data center campus (Lancaster)
Lancaster, Dallas County
163 acres
Reported in the news, not confirmed yet
Approved, not built yetProject Orange and Project Labrador data center campuses (Lancaster)
Lancaster, Dallas County
535 acres
π Aug 11, 2025: Lancaster City Council approved zoning and a development agreement for both sites.
Reported in the news, not confirmed yet
ProposedCrow Holdings / CleanArc data center campus (Stemmons Corridor, Dallas)
Dallas, Dallas County
40 acres
π Jan 20, 2026: Crow Holdings announced a 245 MW campus; first 70 MW building due late 2027.
Reported in the news, not confirmed yet
Being builtPowerHouse Irving data center campus (111 Customer Way)
Irving, Dallas County
50 acres
Reported in the news, not confirmed yet
Being builtQTS DFW2 campus (303 Mason Road)
unknown, Dallas County
π April 2025: QTS filed state plans for two buildings (470,000 and 560,000 sq ft) costing about $650 mβ¦
Reported in the news, not confirmed yet
Approved, not built yetMicrosoft data centers (four buildings, Irving)
Irving, Dallas County
for Microsoft
π Dec 12, 2024: Irving City Council approved tax breaks for four Microsoft data centers.
Approved, not built yetQTS Irving campus expansion (three buildings)
Irving, Dallas County
π Dec 12, 2024: Irving City Council approved tax breaks for three QTS data centers.
Approved, not built yetKDC data center on University of Dallas land (Irving)
Irving, Dallas County
π July 2024: Irving City Council approved rezoning for the data center.
Reported in the news, not confirmed yet
Being builtGoogle data center (156 N. Austin Blvd., Red Oak)
Red Oak, Ellis County
for Google
π Aug 31, 2023: Google announced a data center in Red Oak costing at least $600 million over several yeaβ¦
Reported in the news, not confirmed yet
Status unclearCircle T data center (Westlake, near Keller)
Westlake, Tarrant County
90 acres
π Aug 18, 2026: Keller City Council voted to take legal action against Westlake over the project.
ProposedProvident data center (old Santander site, Rufe Snow Drive)
North Richland Hills, Tarrant County
π June 23, 2026: Hundreds of residents attended Provident's information meeting and questioned the develoβ¦
Reported in the news, not confirmed yet
Being builtAligned DFW-03 data center (3801 Britton Road, Mansfield)
Mansfield, Tarrant County
27 acres
π Feb 19, 2025: Aligned announced a new data center on 27 acres in Mansfield.
Reported in the news, not confirmed yet
Being builtAligned DFW-04 data center for Lambda (401 N. Star Road, Plano)
Plano, Collin County
44 acres Β· for Lambda (AI cloud company)
Reported in the news, not confirmed yet
Being builtCyrusOne DFW7 campus (Asphalt Drive, Fort Worth)
Fort Worth, Tarrant County
Reported in the news, not confirmed yet
Being builtPrime Data Centers DFW04 campus (Aledo Road and Chapin School Road)
Fort Worth, Tarrant County
π Sept 2024: Construction of the first 48 MW, $545 million building was set to begin.
Reported in the news, not confirmed yet
Being builtPrime Data Centers Garland campus (4221 N. Garland Ave.)
Garland, Dallas County
Reported in the news, not confirmed yet
ProposedBT Aycock data center (CR 561, east of Princeton)
unknown, Collin County
50 acres
π June 9, 2026: North Texas Groundwater Conservation District approved a water well for the data center.
Reported in the news, not confirmed yet
Stopped or cancelledProject Tomahawk data center (Prosper, withdrawn)
Prosper, Denton County
37.3 acres
π Sept 1, 2026: Prosper Planning and Zoning Commission voted 7-0 to recommend denial.
Being builtGoogle Midlothian data center campus (Railport Parkway) - building 5
Midlothian, Ellis County
for Google
π Jan 2026: Construction of an $880 million fifth building (288,000 sq ft) began.
Reported in the news, not confirmed yet
Being builtLincoln Rackhouse data center campus (Red Oak, 131 acres)
Red Oak, Ellis County
131 acres
Reported in the news, not confirmed yet
Being builtDigital Realty Garland campus expansion (Ferris Road / W. Campbell Road)
Garland, Dallas County
for Wells Fargo (one customer)
π March 2025: Construction of DFW37 (410,000 sq ft, six 8 MW halls, $120 million) was set to begin.
Reported in the news, not confirmed yet
Being builtServerfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road)
unknown, Harris County
250 acres
π July 2025: Construction of two new buildings (565,000 and 438,000 sq ft, $137 million each) was setβ¦
Reported in the news, not confirmed yet
Status unclearData center on the Fannin-Grayson county line (near Savoy)
unknown, Fannin County
π March 17, 2026: Grayson County judge said a data center is being built in Fannin County right on the Graβ¦
Reported in the news, not confirmed yet
Being builtTRG Datacenters HOU2 (2626 Spring Cypress Road, Spring)
Unincorporated Harris County, Harris County
Reported in the news, not confirmed yet
ProposedEast Texas Energy Campus data center (Clean Holding Company, Newton County)
unknown, Newton County
Reported in the news, not confirmed yet
Being builtMeta El Paso data center campus
El Paso, El Paso County
1,000 acres Β· for Meta
π July 28, 2026: Meta and BlackRock announced a joint venture to own and pay for the campus. Meta will beβ¦
ProposedFort Bliss Army data center (Carlyle)
El Paso, El Paso County
1,384 acres
π May 21, 2026: U.S. Rep. Veronica Escobar wrote to the Secretary of the Army asking for more openness. β¦
Being builtFermi America Project Matador (HyperGrid) energy and data center campus
Unincorporated Carson County, Carson County
5,800 acres Β· for TensorWave (first tenant, 222 MW); others not announced
π Aug 10, 2026: Fermi signed a 15-year lease with TensorWave for 222 megawatts, starting in the second hβ¦
Being builtCrusoe Goodnight data center campus for Google (near Claude)
Unincorporated Armstrong County, Armstrong County
for Google
π Sept 28, 2026: Crusoe confirmed it is building the campus for Google.
Being builtGoogle Meitner Energy Center data center (near Pampa)
Unincorporated Gray County, Gray County
for Google
π June 4, 2026: Google and Intersect announced the Meitner Energy Center and started building. An 800-acβ¦
ProposedGoogle Project Roman data center (near Hereford)
Unincorporated Deaf Smith County, Deaf Smith County
3,700 acres Β· for Google
π Aug 27, 2026: Reporting said the project has four phases, with 3,700 acres for the first phase and morβ¦
ProposedZone Frontier data center campus (Potter County)
Unincorporated Potter County, Potter County
4,077 acres
π Sept 29, 2026: Zone Frontier signed a 30-year land lease with an option to buy, for a campus starting aβ¦
Reported in the news, not confirmed yet
Being builtAligned Data Centers Project Caprock (near Abernathy)
Unincorporated Hale County, Hale County
313 acres
π April 9, 2026: Aligned broke ground on a six-building, 540-megawatt campus on 313 acres.
Being builtFluidstack Abernathy AI data center (formerly TeraWulf joint venture)
Abernathy, Hale County
120 acres Β· for Fluidstack (AI cloud company); Google backs about $1.3 billion of the lease
π July 6, 2026: TeraWulf sold its 50.1% share to a Fluidstack-led group. Fluidstack now leads the project.
Approved, not built yetCorva Project Infrared data center (Northeast Lubbock)
Lubbock, Lubbock County
π July 29, 2026: LEDA defended the deal after residents learned of it. It said the project is below the cβ¦
Stopped or cancelledTexas Solar Works hyperscale data center plan (Northeast Lubbock)
Lubbock, Lubbock County
936 acres
π Jan 16, 2026: The developer withdrew its request before the City Council vote and said it would reviseβ¦
ProposedAmazon Horizon Junction data center campus (Floydada)
Unincorporated Floyd County, Floyd County
485 acres Β· for Amazon Web Services
π Aug 6, 2026: Floyd County commissioners said they were weighing a tax break for an Amazon campus of uβ¦
Reported in the news, not confirmed yet
Being builtGW Ranch off-grid power and Amazon data center campus (north of Fort Stockton)
Unincorporated Pecos County, Pecos County
8,000 acres Β· for Amazon Web Services
π Aug 2026: Amazon filed state building plans for three data center buildings at the site.
Status unclearPoolside Project Horizon AI campus (near Fort Stockton)
Unincorporated Pecos County, Pecos County
559 acres Β· for Poolside (CoreWeave left the deal in April 2026)
π July 27, 2026: Fort Stockton Board of Adjustment held a hearing on Poolside's request for zoning exceptβ¦
ProposedMicrosoft Pecos AI data center with Chevron's Project Kilby gas plant
Unincorporated Reeves County, Reeves County
for Microsoft
π June 22, 2026: Microsoft announced a 2-gigawatt data center in Pecos. Chevron signed a 20-year deal to β¦
Being builtCore Scientific Pecos AI data center expansion
Unincorporated Reeves County, Reeves County
200 acres Β· for unknown (site offered for lease)
π April 27, 2026: Core Scientific said it will grow its Pecos campus to 1.5 gigawatts for AI, with first sβ¦
ProposedPrometheus Hyperscale Pecos campus
Unincorporated Reeves County, Reeves County
π Aug 24, 2026: Plans were reported for a 1.5-gigawatt off-grid campus near Pecos, growing to about 2.5 β¦
Reported in the news, not confirmed yet
ProposedPowerBridge Alpha Digital Campus (LandBridge land near Waha)
Unincorporated Reeves County, Reeves County
3,400 acres
π April 2, 2026: LandBridge and PowerBridge announced a deal for a 2-gigawatt powered data center campus β¦
Reported in the news, not confirmed yet
Built & runningCipher Black Pearl AI data center for Amazon (near Wink)
Unincorporated Winkler County, Winkler County
75 acres Β· for Amazon Web Services (15-year lease)
π Aug 2026: First data center space was handed over to Amazon and rent began.
Being builtCipher Barber Lake AI data center for Fluidstack and Google (near Colorado City)
Unincorporated Mitchell County, Mitchell County
250 acres Β· for Fluidstack, with Google backing part of the lease
π Aug 4, 2026: Cipher said the tenant had started using part of the building, with first delivery expecβ¦
Being builtCipher Stingray AI data center for Amazon (Andrews)
Unincorporated Andrews County, Andrews County
for Amazon Web Services (15-year lease)
π Aug 4, 2026: Cipher said grading, pad work and underground electrical work were underway.
ProposedCipher Colchis data center site (northeast of San Angelo)
Unincorporated Tom Green County, Tom Green County
620 acres
π June 2, 2026: Local reporting said the site is outside city limits, so San Angelo cannot regulate it.
Approved, not built yetSkybox / Emergent data center on city land (San Angelo City Farm)
San Angelo, Tom Green County
350 acres
π June 22, 2026: A petition to recall the mayor over the project failed to get enough signatures.
ProposedBeacon Data Centers Dove Creek campus (Westline site)
Unincorporated Tom Green County, Tom Green County
1,240 acres
π Aug 10, 2026: Reporting showed the developer applied to TCEQ for an air permit for gas engines, allowiβ¦
ProposedTexas Critical Data Centers AI campus (near Penwell)
Unincorporated Ector County, Ector County
438 acres
π 2026: Stream Data Centers joined the project. Plans grew to more than 1 gigawatt on about 438 β¦
ProposedSangha Renewables Project Genesis data center (solar-powered)
Unincorporated Ector County, Ector County
for unknown (AI, cloud and computing work planned)
π Sept 2026: ERCOT, the state grid operator, gave the 110-megawatt campus a conditional 'base load' Oβ¦
Reported in the news, not confirmed yet
Being builtIonic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow)
Unincorporated Ward County, Ward County
for Nscale (AI cloud company), serving Microsoft
π Oct 15, 2025: Ionic Digital signed a 10-year, about $2 billion lease with Nscale for its 234-megawatt β¦
Reported in the news, not confirmed yet
ProposedFO Permian Partners off-grid data center site (Midland)
Unincorporated Midland County, Midland County
π Sept 4, 2025: FO Permian announced a 150-megawatt off-grid powered site for data centers, with room toβ¦
Reported in the news, not confirmed yet
Built & runningGalaxy Helios AI data center campus for CoreWeave (near Afton)
Unincorporated Dickens County, Dickens County
2,200 acres Β· for CoreWeave (15-year leases)
π July 9, 2026: Galaxy finished Phase I, handing about 200 megawatts of power to CoreWeave.
Built & runningIREN Childress campus (bitcoin mine becoming AI data center for Microsoft)
Unincorporated Childress County, Childress County
for Microsoft (AI cloud contract worth $9.7 billion over five years)
π Aug 13, 2026: IREN said its first 50-megawatt liquid-cooled AI hall at Childress (Horizon 1) was delivβ¦
Reported in the news, not confirmed yet
ProposedCrusoe and Lancium 1-gigawatt AI campus (Childress)
Unincorporated Childress County, Childress County
270 acres Β· for An unnamed large tech company ('hyperscaler')
π July 15, 2026: Crusoe and Lancium announced a 1-gigawatt AI data center campus on 270 acres in Childresβ¦
Reported in the news, not confirmed yet
Being builtIREN Sweetwater 1 data center campus
Unincorporated Nolan County, Nolan County
for IREN AI cloud (customers not named for this site)
π May 2026: IREN connected the 1.4-gigawatt Sweetwater 1 substation to the ERCOT grid.
Reported in the news, not confirmed yet
ProposedIREN Sweetwater 2 data center site
Unincorporated Fisher County, Fisher County
π May 2026: IREN said Sweetwater 2 is planned to join Sweetwater 1 as a 2-gigawatt hub.
Reported in the news, not confirmed yet
Approved, not built yetCrusoe $7 billion data center (Nolan County, near Sweetwater)
Unincorporated Nolan County, Nolan County
π April 13, 2026: Nolan County commissioners approved a 10-year tax break for the $7 billion Crusoe data cβ¦
Reported in the news, not confirmed yet
ProposedSB Energy proposed data center (Scurry County)
Unincorporated Scurry County, Scurry County
π Oct 1, 2026: SB Energy held a community open house at the Scurry County Museum in Snyder about the prβ¦
Reported in the news, not confirmed yet
Being builtEnergy Vault AI campus with Crusoe modular data centers (Snyder)
Unincorporated Scurry County, Scurry County
for Crusoe Cloud customers
π July 27, 2026: Energy Vault began building an AI campus in Snyder with 10 Crusoe Spark modular data cenβ¦
Reported in the news, not confirmed yet
Being builtSoluna Project Dorothy 3 wind-powered AI campus (Briscoe County)
Unincorporated Briscoe County, Briscoe County
300 acres Β· for unknown (AI and computing customers)
π April 2, 2026: Soluna bought the 150-megawatt Briscoe wind farm for $53 million and announced Dorothy 3β¦
ProposedQTS Howard County data center campus (Big Spring area)
Unincorporated Howard County, Howard County
902 acres
π 2026: QTS posted plans for an 8-building, $10 billion campus on 902 acres in Howard County, wiβ¦
Reported in the news, not confirmed yet
ProposedInfraTech Capital $2.7 billion data center campus (Carson County, near Amarillo)
Unincorporated Carson County, Carson County
5,000 acres Β· for An unnamed large tech company ('hyperscaler')
π Aug 21, 2026: InfraTech Capital announced plans for a $2.7 billion data center campus on more than 5,0β¦
Reported in the news, not confirmed yet
Status unclearPampa Energy Center data center park (APR Energy / Duos)
Pampa, Gray County
800 acres
π June 2025: Pampa economic development leaders backed APR Energy's 800-acre, 400-megawatt gas-powereβ¦
Reported in the news, not confirmed yet
The rules in Texas
What the state says about data centers, in plain words.
π State laws
SB 6 (2025): rules for very big power users like data centers Β· June 20, 2025
Signed June 20, 2025, and in effect right away. It covers new or bigger hookups of 75 megawatts or more on the main Texas grid (ERCOT). The state utility commission (PUC) must write hookup rules. Big users must: pay a study fee of at least $100,000; prove they own or lease the land; put up money to back the power lines built for them; say if they are asking for power at other Texas sites too; and report on-site backup generators. In a power emergency, ERCOT can tell big users with backup generators to switch to them or cut back. New big users hooked up after December 31, 2025, must have equipment so they can be cut off during rolling blackouts. Hooking a new data center straight to an existing power plant now needs ERCOT study and PUC approval. Big users must help pay to connect. The PUC must review how power-line costs are split between home and business customers and change its rules by December 31, 2026. Source
HB 24 (2025): new zoning notice and protest rules for cities Β· June 20, 2025
In effect September 1, 2025. Cities must now post zoning hearing notices on their website as well as in the newspaper. Home-rule cities must put a notice sign (at least 24 by 48 inches) on the land at least 10 days before the zoning commission hearing. The neighbor protest rule stayed the same for non-housing projects like data centers: if owners of at least 20% of the land in the change, or of the land within 200 feet, sign a written protest, the city council needs a three-fourths vote to approve it. The lower bar in this law only applies to changes that add housing. Source
HB 2559 (2025): limits on city building pauses (moratoriums) Β· June 20, 2025
In effect September 1, 2025. A city that wants to pause new development must hold two public hearings at least 30 days apart, give 30 days' newspaper notice, and pass the pause with a three-fourths vote of the council. A pause ends after 90 days unless the council extends it with written findings, and it can never total more than 180 days. The same kind of pause cannot come back for two years. A state senator has said this law also blocks city data center bans; land use experts quoted by the Texas Tribune disagree, because a zoning change is not a moratorium. Source
Governor's order: data centers must pay their own power costs (June 10, 2026) Β· June 10, 2026
Governor Abbott told the PUC to make sure data center hookups lead to lower home electric bills and that data centers pay all of their power line and hookup costs. He told the PUC to start cutting home customers' power-line (transmission) costs by July 31, 2026. He also said he will ask lawmakers in 2027 to: make data centers add power plants, not just use power; require water-saving cooling such as closed-loop systems; make big data centers report power and water use every year; end the data center sales tax break; and set rules on setbacks and noise. This is an order to state agencies, not a law. Source
Governor's pause: no new data center grid approvals until an audit (August 3, 2026) Β· Aug 3, 2026
Governor Abbott ordered the PUC and ERCOT to check (audit) every data center moving through the grid hookup line before any more are approved. Projects that do not pass must be denied a grid connection. Each project must report: tax breaks, power use and on-site power plants, water use and type of cooling, steps to protect neighbors (noise, lights, setbacks, traffic), and who owns it. ERCOT told the PUC on August 14 that the audit covers about 250 to 300 projects in its first group ('Batch Zero'), about 200 gigawatts in all, and will take 'several months.' The governor said the pause applies statewide, including outside the ERCOT grid. It is an order, not a law. Source
Governor's order: punish data centers that skip the state water survey (September 14, 2026) Β· Sept 14, 2026
State law already says big water users must answer the Texas Water Development Board's yearly water use survey, or face a Class C misdemeanor. Few data centers did: about 30% of the 329 surveyed in 2025. Governor Abbott told the board to enforce the law and to send cases to county or district attorneys. The board says it cannot prosecute anyone itself. The board's update to the governor is due October 14, 2026. Source
Governor's pause: no state environmental permits for data centers until the audit ends (September 21, 2026) Β· Sept 21, 2026
Governor Abbott told the Texas Commission on Environmental Quality (TCEQ) to pause all permits sought by data center projects until ERCOT finishes its review. This reaches projects that make their own power and skip the grid. TCEQ must report back to the governor by October 19, 2026. The letter also says the governor will ask lawmakers to end money incentives for data centers. It is an order, not a law. Source
Next chance for new laws: the 2027 session Β· Jan 2027
The Texas Legislature meets in regular session only in odd years. Its next session starts in January 2027. In 2026, House and Senate committees held study hearings on data center power use, water use, tax breaks and local control. The Senate Finance chair, Sen. Joan Huffman, said she will file a bill to change or repeal the data center sales tax break. People including the agriculture commissioner and some lawmakers asked the governor to call a special session now; we found no special session called on data centers as of October 6, 2026. Source
π‘ Who pays for the power
What the 2025 law (SB 6) makes big users pay Β· June 20, 2025
For new hookups of 75 megawatts or more on the ERCOT grid: a study fee of at least $100,000; money held as a guarantee for the power lines built to serve them (refunded as the project ramps up); and a share of the cost to connect. City-owned utilities and co-ops that do not offer customer choice must pass the 'reasonable costs' of connecting a big user on to that user. The PUC must review whether the way power-line costs are split (the '4CP' method, based on use at the four summer peak hours) is fair to all customers and fix its rules by December 31, 2026. Source
'Batch Zero': the new line for data centers to join the grid Β· June 18, 2026
On June 18, 2026, the PUC approved ERCOT's new 'batch' process. Instead of studying each request one at a time, ERCOT studies a group of big users (75 megawatts and up) together and decides which power lines are needed. The Texas Tribune reported that developers would have to pay $50,000 per megawatt requested and prove they own or lease the land before being studied. In August ERCOT said it still aims to finish the first batch study by its original April deadline; a full power line plan for the batch is expected in fall 2027. Applications for the next batch were expected in summer 2027. The governor's August 2026 audit now comes first. Source
How much power data centers are asking for Β· Aug 3, 2026
As of August 2026, ERCOT was tracking more than 1,800 big-user requests asking for about 474 gigawatts, more than five times the grid's record peak. About 90% are data centers. Experts and ERCOT say many will never be built. ERCOT's April 2026 draft forecast said peak demand could reach 367,790 megawatts by 2032, compared with the record of 85,508 megawatts in August 2023; ERCOT itself called that forecast likely too high. Source
Governor: data centers must pay all their power line costs Β· July 17, 2026
The governor's June 10, 2026 letter told the PUC to require data centers to pay all of their electric infrastructure costs and to start cutting home customers' transmission costs by July 31, 2026. On July 17, PUC Chair Thomas Gleeson answered with a letter listing steps already taken under SB 6 and asked lawmakers for more power, such as making data centers register with the state and letting regulators talk to data centers directly in an emergency. Exactly how data centers will pay for new power lines is still being worked out. Source
Home electric prices since 2020 Β· Sept 15, 2026
The Texas Tribune, using data from the private marketplace ElectricChoice, reports the average Texas home electric rate rose about 40%, from 11.50 cents per kilowatt-hour in 2020 to 16.11 cents in 2026. The Tribune says rising bills are driven by natural disasters, power line congestion and growing demand. We did not find an official state study that measures how much of this is caused by data centers. Source
π΅ Tax breaks
State sales tax break for data centers Β· 2015
Since 2013 (expanded in 2015), qualifying data centers do not pay the 6.25% state sales tax on equipment and on electricity. That covers servers, storage, cooling and electrical systems, emergency generators, software and the power they buy. Local sales tax is still due. There are two levels. (1) A building of at least 100,000 square feet that promises 20 jobs in the county and $200 million of investment over 5 years gets 10 years, or 15 years at $250 million or more. (2) A project of at least 250,000 square feet that promises 40 jobs and $500 million gets 20 years. Each site must have a single occupant. The comptroller checks investment and jobs at the 5-year mark and can take the break away. Source
How much the sales tax break costs Β· July 27, 2026
The comptroller estimated in 2025 that the break will cost the state $3.2 billion in sales tax over two years, and nearly $1.8 billion a year by 2030. In 2015 it cost $5.4 million. At a July 27, 2026 Senate hearing, the comptroller's office said 138 data centers qualify, only 20 have been audited, and 6 of those broke the rules (at least 4 did not create the promised jobs). 59 more were certified in 2026, about 10 a month, so the next cost estimate will be 'significantly higher.' The governor, the lieutenant governor and the Senate Finance chair have called for repealing or changing the break in 2027. Source
Local property tax breaks (abatements) Β· Aug 13, 2026
Cities, counties and special districts (not school districts) can cut property taxes on a new project's added value for up to 10 years under Chapter 312 of the Tax Code. Steps: the local government adopts abatement rules after a public hearing; creates a 'reinvestment zone' after a public hearing with 7 days' newspaper notice; and gives at least 30 days' public notice before the meeting where it votes on the deal. The notice must name the owner and applicant and describe the project. Residents can speak at the hearings. Counties often use these deals to add conditions such as road repair. A consultant told the Texas Tribune he knew of no data center project that went ahead without an abatement. Local deals are posted on the comptroller's website. Source
π€ Secret deals and public records
Secret deals (NDAs) are legal in Texas Β· Aug 10, 2026
No Texas law bans secret deals (NDAs) between data center companies and cities, counties, economic development groups or water agencies. The Texas Tribune found NDAs in several places, for example a river authority that signed one with a developer in 2026, and city officials who said an NDA kept them from answering questions. Texas law lets local governments negotiate business deals in private, but the final vote must be on a public agenda. Companies often use shell companies (LLCs with different names) on public votes and filings. Microsoft said in spring 2026 it would stop using NDAs with local governments. Source
Public records: the Texas Public Information Act Β· Jan 21, 2025
Anyone can ask for Texas government records. You do not have to live in Texas or say why. Ask in writing. The government must release records 'promptly.' If it cannot within 10 business days, it must tell you in writing when they will be ready. If it wants to keep something secret, it must ask the Texas Attorney General for a ruling within 10 business days and send you a copy of its letter. The Attorney General then has 45 business days (plus up to 10 more) to decide. If the government misses the 10-day deadline, the records are presumed public. Source
What data center records are often kept secret Β· July 28, 2026
Texas law lets governments hold back trade secrets and business information that would cause competitive harm, and details of economic development talks while a deal is being negotiated. But once a deal is made, information about tax breaks or other incentives that cost public money is public. The 2025 grid law (SB 6) makes customer-specific information that ERCOT gets about big users confidential. The state comptroller has refused to say how much sales tax each data center saves. Some water utilities, such as San Antonio's SAWS, refuse to release data center water use, citing a law meant to protect household smart-meter data. Source
The grid operator keeps project details private Β· Aug 10, 2026
ERCOT treats project-level data (how much power a site wants, where, and who is building it) as private. It shares only totals, mostly in meeting slides. The PUC's 2026 voluntary data center water survey got few answers, and the PUC asked the Attorney General to let it withhold the results from the Texas Tribune. Source
New in 2025: faster answers and a way to complain Β· Sept 1, 2025
Since September 1, 2025 (HB 4219): if the government has no records, it must tell you in writing within 10 business days. If it wants to hold records back, it must ask the Attorney General within 10 business days and name the exact legal reasons. If it does not answer you as the law requires, you can send a written complaint to the Attorney General, who can require training, stop it from charging you, and order a faster review. Each government must also give the Attorney General an official mail and email address for records requests (HB 4214), and the Attorney General posts them in a public database. Source
Open meetings: votes must be public Β· Aug 11, 2026
The Texas Open Meetings Act requires public notice and public access when city councils, county commissioners courts and school boards meet on official business. They may meet in closed (executive) session on some topics, such as buying or leasing land and some contract talks, but final votes should be taken in public. So a data center deal, tax break or land sale must appear on a public agenda before the vote. Source
π§ Water
Who controls the water a data center uses Β· Aug 11, 2026
There is no single state approval for a data center's water. It depends on the source. City water: the city or water utility decides, and can set conditions on a new heavy user. Wells: the local groundwater conservation district may know how much is pumped, but not every part of Texas has one. River or lake water: the state owns surface water, so a user needs a water right from the Texas Commission on Environmental Quality (TCEQ), or a deal with a river authority or water district that has one. Wastewater discharge needs a TCEQ permit. Source
State water use survey (Texas Water Development Board) Β· Sept 14, 2026
The Texas Water Development Board (TWDB) plans the state's water supply. Since 2020 it has asked operating data centers that use at least 10 million gallons a year to report their water use. Answering is required by law, but in 2025 only about 30% of 329 data centers did. Survey answers are available only through a public records request. Planned data centers that are not built yet are not surveyed. In September 2026 the governor ordered the board to enforce the law. Source
PUC's 2026 data center water and power survey Β· Aug 3, 2026
Under the state budget law, the PUC and the Water Development Board surveyed data centers and crypto mines in 2026 about water use, cooling, water sources, power demand and on-site power plants. Only 28 of 377 companies notified had answered by June. There is no fine for not answering. The PUC must share the results with the water board and TCEQ and report to the governor and the Legislative Budget Board by the end of 2026. The PUC asked the Attorney General to let it keep the results from the Texas Tribune. Source
π«οΈ Air and generators
Air permits for generators and gas plants (TCEQ) Β· July 9, 2026
The Texas Commission on Environmental Quality (TCEQ) issues air permits for data center diesel backup generators and on-site gas power plants. Many get quick 'permits by rule' or 'standard permits,' which do not require public notice or a comment period. Bigger 'major source' permits require the best pollution controls, more review and public comment. Floodlight found at least 38 Texas data centers got the smaller permits since 2024, for more than 2,100 diesel generators. More than half reported nitrogen oxide emissions just under the limits that would require public input (for example 249.1 tons a year where the limit is 250, and 99.8 tons near San Antonio where it is 100). Watchdogs say some projects get a small permit first and expand later. Source
Data center permits paused; a federal rule could cut public input Β· Sept 21, 2026
On September 21, 2026, the governor told TCEQ to pause all permits sought by data center projects until ERCOT's audit is done. TCEQ must report back by October 19, 2026. Separately, on July 7, 2026 the U.S. EPA proposed letting states decide how much public notice and input to give for 'minor' air permits, the kind many data centers use. Written comments were due August 21, 2026. If EPA adopts it, any TCEQ change would still go through its own state rulemaking with public input. Source
π How to have your say
Who decides a data center near you Β· June 30, 2026
Inside city limits, the city decides. Texas cities zone land: a zoning (planning) commission holds a hearing and recommends, and the city council votes. Outside city limits, the county is in charge, but Texas counties have no general zoning power, so they usually cannot block a data center or stop it by a pause. In 2026, Hill County's pause was dropped after a $100 million lawsuit, and a state senator warned Hood County it had no power to pass one. Counties mainly decide tax breaks (abatements), county roads and septic permits. A developer outside city limits may also ask a city to annex its land; the council votes on that in public (San Marcos said no in 2026). About half of the planned Texas data centers are on unincorporated land. Source
City zoning hearings: notices and how to speak Β· Sept 1, 2025
For a rezoning, the city must mail written notice to property owners within 200 feet at least 10 days before the zoning commission hearing. The city council must hold its own public hearing, with notice in the newspaper and on the city website at least 15 days before. Home-rule cities must also post a sign on the land at least 10 days before the commission hearing. Anyone can speak at these hearings. Ask the city planning office for the case number and staff report. Source
Neighbor protest petition: force a three-fourths vote Β· Sept 1, 2025
If owners of at least 20% of the land being rezoned, or 20% of the land within 200 feet of it, sign a written protest, the city council needs a three-fourths vote of all members to approve the change. Streets and alleys count in the land area, and the area is added up for all the tracts together. Turn in the signed protest before the council votes; ask the city clerk about its deadline and form. Source
Appeal deadline: 10 days for board of adjustment decisions Β· Aug 30, 1999
A city board of adjustment decides variances and appeals of the zoning officer. If you were harmed by its decision, or you are a taxpayer, you can ask a district or county court to review it. You must file a sworn (verified) petition within 10 days after the decision is filed in the board's office. This is a very short deadline. A city council's rezoning vote is a law-making act and is challenged differently; talk to a lawyer quickly. Source
What you can ask your county to do Β· Feb 13, 2026
County commissioners courts vote in public on tax breaks (abatements). They can say no, or put conditions in the deal, such as road repairs, noise and light limits, setbacks or local hiring. Many Texas counties have also passed resolutions asking the state for more power and more information about data centers. Watch the commissioners court agenda, sign up to speak, and ask whether any NDA was signed. Source
How to file a public records request in Texas Β· Jan 21, 2025
1) Find the agency's public information officer (city secretary, county clerk, water utility, or state agency). 2) Send a written request by email, mail or the agency's online portal. 3) Be specific, for example: 'all NDAs, letters and emails with [company] about a data center, January 2025 to today.' 4) Anyone may ask; you do not need to be a Texan or give a reason. 5) Mark your calendar: if the agency wants to withhold records, it must ask the Attorney General within 10 business days and copy you. 6) You can send the Attorney General your own arguments. If the agency refuses to follow the law, you can complain to your county or district attorney or file suit. Source
Where to look for clues about a project Β· Aug 11, 2026
Check city and county meeting agendas for zoning cases and tax abatements. Look up the land owner on the county appraisal district website. Search the state comptroller's lists of data centers with sales tax breaks and of local tax deals. Search the Texas Department of Licensing and Regulation (TDLR) building registrations, which list owner, location and cost. Search TCEQ for air permits for generators or gas plants. Ask the local groundwater district or water utility about water deals. Source
How to track and comment on TCEQ permits Β· Aug 11, 2026
Search TCEQ's central registry and its lists of pending air permit applications (new source review and federal operating permits). Only some permits require public notice and input before they are approved. Permits by rule and standard permits often have none, so look early. A federal operating permit may be the first chance to comment. The nonprofit Air Alliance Houston keeps a map of air permit notices. Public Citizen, Save Our Springs and Environment Texas published a guide to tracking data center permits. Source
How to speak up at the utility commission (PUC) Β· Aug 28, 2026
The PUC decides grid hookup rules, power line routes and how costs are split. People can speak during PUC open meetings; landowners and lawmakers testified at the August 14 and August 28, 2026 meetings on data centers and power lines. If a new power line case (called a 'CCN') may cross your land, you get a letter. You can file to take part (intervene) in the case, but deadlines are short; some landowners said they had 21 days to respond. On August 28, 2026 the PUC approved two 765,000-volt Oncor lines in West Texas despite hundreds of landowner protests. Source
π§Ύ Help with your bills
CEAP: help paying electric and gas bills Β· Aug 13, 2026
The Comprehensive Energy Assistance Program (CEAP) is Texas's federally funded (LIHEAP) utility bill help for low-income households. Local agencies run it in all 254 counties, and it also teaches ways to lower energy costs. To find your local agency, use the state housing agency's 'Help for Texans' page or call 2-1-1. Source
Free home weatherization Β· Aug 13, 2026
The Weatherization Assistance Program helps lower utility bills by making homes more energy efficient. Find a local provider on the state housing agency's 'Help for Texans' page. Source
2-1-1 Texas: find local bill help Β· Oct 6, 2026
Call 2-1-1 or search 211texas.org for local help with electric, gas and water bills, payment plans, utility deposits and disconnection protection. Source
π Who to contact
Public Utility Commission of Texas (PUC) Β· Oct 6, 2026
Oversees ERCOT and the power companies. Sets grid hookup rules for big users, approves new power lines, and decides how costs are split. Running the data center audit with ERCOT. Source
ERCOT (Electric Reliability Council of Texas) Β· Oct 6, 2026
Runs the main Texas power grid (about 90% of the state's power use). Studies data center hookup requests in 'batches' and plans power lines. Source
Texas Commission on Environmental Quality (TCEQ) Β· Oct 6, 2026
Issues air permits (generators, gas plants), water rights for river and lake water, and wastewater permits. Data center permits have been paused since September 21, 2026. Source
Texas Water Development Board (TWDB) Β· Oct 6, 2026
Plans the state's water supply and runs the yearly water use survey that data centers must answer. Source
Texas Comptroller of Public Accounts Β· Oct 6, 2026
Runs the data center sales tax break, lists the data centers that qualify, and posts local tax abatement deals. Source
Texas Attorney General, Open Government Β· Oct 6, 2026
Rules on whether records can be withheld under the Public Information Act and takes complaints when a government does not respond. Source
Texas Department of Licensing and Regulation (TDLR), TABS search Β· Oct 6, 2026
Big building projects register here for accessibility review. The TABS search shows owner, location and estimated cost, and can reveal data center buildings early. Source
Groundwater conservation districts (map) Β· Oct 6, 2026
Local districts that manage well water. The Texas Alliance of Groundwater Districts keeps a map with contacts. Source
Texas Legislature Online Β· Oct 6, 2026
Look up bills, hearings and votes. The next regular session starts in January 2027. Source
Office of the Governor Β· Oct 6, 2026
Issued the 2026 orders on data center costs, the grid audit, water reporting and the TCEQ permit pause. Source
Texas Department of Housing and Community Affairs (TDHCA) Β· Oct 6, 2026
Runs the CEAP bill help and weatherization programs through local agencies. Source
Guides and model rules for towns
Sample rules other towns can copy, from planners and groups across Texas.
Counties
Bold counties have at least one data center project.
- Anderson County
- Andrews County (1)
- Angelina County (3)
- Aransas County
- Archer County
- Armstrong County (1)
- Atascosa County
- Austin County (1)
- Bailey County
- Bandera County
- Bastrop County (4)
- Baylor County
- Bee County
- Bell County (4)
- Bexar County (11)
- Blanco County
- Borden County
- Bosque County (1)
- Bowie County (2)
- Brazoria County (2)
- Brazos County (2)
- Brewster County
- Briscoe County (1)
- Brooks County
- Brown County
- Burleson County
- Burnet County
- Caldwell County (4)
- Calhoun County
- Callahan County
- Cameron County (3)
- Camp County
- Carson County (2)
- Cass County
- Castro County
- Chambers County
- Cherokee County
- Childress County (2)
- Clay County
- Cochran County
- Coke County
- Coleman County
- Collin County (2)
- Collingsworth County
- Colorado County
- Comal County
- Comanche County
- Concho County
- Cooke County
- Coryell County
- Cottle County
- Crane County
- Crockett County
- Crosby County
- Culberson County
- Dallam County
- Dallas County (11)
- Dawson County
- DeWitt County
- Deaf Smith County (1)
- Delta County (1)
- Denton County (4)
- Dickens County (1)
- Dimmit County
- Donley County
- Duval County
- Eastland County
- Ector County (2)
- Edwards County
- El Paso County (2)
- Ellis County (6)
- Erath County
- Falls County
- Fannin County (1)
- Fayette County
- Fisher County (1)
- Floyd County (1)
- Foard County
- Fort Bend County
- Franklin County
- Freestone County (1)
- Frio County
- Gaines County
- Galveston County
- Garza County
- Gillespie County
- Glasscock County
- Goliad County
- Gonzales County
- Gray County (2)
- Grayson County (1)
- Gregg County
- Grimes County
- Guadalupe County (2)
- Hale County (2)
- Hall County
- Hamilton County
- Hansford County
- Hardeman County
- Hardin County
- Harris County (3)
- Harrison County
- Hartley County
- Haskell County (2)
- Hays County (2)
- Hemphill County
- Henderson County (2)
- Hidalgo County
- Hill County (3)
- Hockley County
- Hood County (6)
- Hopkins County (1)
- Houston County
- Howard County (1)
- Hudspeth County
- Hunt County (2)
- Hutchinson County
- Irion County
- Jack County
- Jackson County
- Jasper County
- Jeff Davis County
- Jefferson County (1)
- Jim Hogg County
- Jim Wells County
- Johnson County
- Jones County
- Karnes County
- Kaufman County (1)
- Kendall County
- Kenedy County
- Kent County
- Kerr County
- Kimble County
- King County
- Kinney County
- Kleberg County
- Knox County
- La Salle County (1)
- Lamar County
- Lamb County
- Lampasas County
- Lavaca County
- Lee County
- Leon County (1)
- Liberty County (1)
- Limestone County
- Lipscomb County
- Live Oak County
- Llano County
- Loving County
- Lubbock County (2)
- Lynn County
- Madison County
- Marion County
- Martin County
- Mason County
- Matagorda County (1)
- Maverick County
- McCulloch County (1)
- McLennan County (3)
- McMullen County
- Medina County (5)
- Menard County
- Midland County (1)
- Milam County (3)
- Mills County
- Mitchell County (1)
- Montague County
- Montgomery County
- Moore County
- Morris County
- Motley County
- Nacogdoches County
- Navarro County (2)
- Newton County (1)
- Nolan County (2)
- Nueces County (1)
- Ochiltree County
- Oldham County
- Orange County
- Palo Pinto County
- Panola County
- Parker County
- Parmer County
- Pecos County (2)
- Polk County
- Potter County (1)
- Presidio County
- Rains County
- Randall County
- Reagan County
- Real County
- Red River County
- Reeves County (4)
- Refugio County
- Roberts County
- Robertson County
- Rockwall County
- Runnels County
- Rusk County
- Sabine County
- San Augustine County
- San Jacinto County
- San Patricio County
- San Saba County
- Schleicher County
- Scurry County (2)
- Shackelford County (2)
- Shelby County
- Sherman County
- Smith County (1)
- Somervell County (1)
- Starr County
- Stephens County
- Sterling County
- Stonewall County
- Sutton County
- Swisher County
- Tarrant County (8)
- Taylor County (3)
- Terrell County
- Terry County
- Throckmorton County
- Titus County
- Tom Green County (3)
- Travis County (4)
- Trinity County
- Tyler County
- Upshur County
- Upton County
- Uvalde County
- Val Verde County
- Van Zandt County
- Victoria County (1)
- Walker County
- Waller County
- Ward County (1)
- Washington County (1)
- Webb County (1)
- Wharton County (1)
- Wheeler County
- Wichita County (3)
- Wilbarger County (1)
- Willacy County (1)
- Williamson County (12)
- Wilson County (1)
- Winkler County (1)
- Wise County
- Wood County
- Yoakum County
- Young County
- Zapata County
- Zavala County