Being builtBig (AI-size): 200 megawatts
PowerHouse Irving data center campus (111 Customer Way)
PowerHouse is building three data center buildings on 50 acres in Irving that together would use 200 megawatts.
What happens next?
🗓️ No meeting or deadline known yet.
Zoning here is usually decided by the City Council of Irving City.
Where things stand: Being built Construction was set to begin early 2025.
❓ 3 open questions about it: see below.
Last checked Oct 7, 2026.
What we know
- 📍 Where111 Customer Way, Irving-Las Colinas, Irving, Dallas County
- 🏢 CompanyPowerHouse Data Centers with Harrison Street
- 🌳 Size50 acres
- ⚡ Power it needs200 megawatts (about as much as 160,000 homes)
- 🔌 Where the power comes fromExisting Oncor substation next door.
❓ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- Are any buildings finished? 🙋 I'll find out ·
- Who is the tenant? 🙋 I'll find out ·
- How much water does it use? 🙋 I'll find out ·
🔎 What we checked
- Oct 7, 2026: We checked the site location: exact address found.
🛰️ See it from above
Drag the slider to compare the land before and now.
20182025
Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.
Where this comes from
- PowerHouse expands into Texas, plans 200MW campus in Dallas · DatacenterDynamics
- Census geocoder match for 111 Customer Way, Irving, TX · U.S. Census Bureau · Oct 7, 2026
See something wrong? Tell us and we'll fix it.