🙋 Help out in Texas
Some answers only a local person can get. Pick a task and press "I'll do it". We email you a task code and everything you need. When you find the answer, send it in, and we add it for everyone to see.
618 open questions in Texas, by county. Other states
Open tasks by county
Cottle County
- ❓ Did Cottle County approve the tax break for Aetheris, and on what terms?
About Aetheris 'Project Matter' data center (Triangle Ranch, Cottle County) in Paducah Town - ❓ Who will use the data center?
About Aetheris 'Project Matter' data center (Triangle Ranch, Cottle County) in Paducah Town - ❓ Where exactly on Triangle Ranch is the site?
About Aetheris 'Project Matter' data center (Triangle Ranch, Cottle County) in Paducah Town - ❓ Where will the water come from, and how much will be used each day?
About Aetheris 'Project Matter' data center (Triangle Ranch, Cottle County) in Paducah Town - ❓ Has Aetheris applied to the state (TCEQ) for an air permit for the gas power plant?
About Aetheris 'Project Matter' data center (Triangle Ranch, Cottle County) in Paducah Town
Navarro County
- ❓ How many megawatts will it use?
About EG AI small data center (Rice) in Rice City - ❓ How will it be cooled, and will it use city water?
About EG AI small data center (Rice) in Rice City - ❓ Does it need any approval from the City of Rice?
About EG AI small data center (Rice) in Rice City
Mitchell County
- ❓ How much water does the site use?
About Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City) in Unincorporated Mitchell County - ❓ Did Mitchell County give a tax break?
About Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City) in Unincorporated Mitchell County - ❓ Does the site have backup diesel generators, and how many?
About Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City) in Unincorporated Mitchell County - ❓ Did Cipher deliver the first part of Barber Lake to Fluidstack in September 2026 as planned?
About Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City) in Unincorporated Mitchell County - ❓ When will Cipher hand over the first part of Barber Lake under the new delivery schedule?
About Cipher Barber Lake AI data center for Fluidstack and Google (near Colorado City) in Unincorporated Mitchell County
Hardeman County
- ❓ Who is behind 19000-200 Holdings, LLC, and who will use the data center?
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City - ❓ How many buildings are planned? The filing calls this 'Building 5'.
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City - ❓ How many acres is the site, and is it inside Quanah city limits?
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City - ❓ How many megawatts will it use, and where will the power come from?
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City - ❓ How much water will it use, and from where?
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City - ❓ Has Hardeman County or the City of Quanah been asked for a tax break?
About 'Clocktower' data center building (Four Corners Rd, Quanah) in Quanah City
Brazoria County
- ❓ Where exactly is the site?
About CleanSpark AI data center site (Brazoria County) - ❓ Has the land deal closed?
About CleanSpark AI data center site (Brazoria County) - ❓ How much water will it use?
About CleanSpark AI data center site (Brazoria County) - ❓ Will the CleanSpark site near Damon use gas turbines for power?
About CleanSpark AI data center site (Brazoria County) - ❓ Has the state air permit for the gas turbines been filed or approved?
About Old Ocean data center campus (Nightpeak Energy, near Sweeny) in Unincorporated Brazoria County - ❓ How much water will it use?
About Old Ocean data center campus (Nightpeak Energy, near Sweeny) in Unincorporated Brazoria County - ❓ Who will use the data centers?
About Old Ocean data center campus (Nightpeak Energy, near Sweeny) in Unincorporated Brazoria County
Caldwell County
- ❓ Which companies will build data centers on the park, and when?
About Tract Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ How much water will the data centers use, and from where?
About Tract Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ Is any part of the land inside Uhland's city limits or its ETJ?
About Tract Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ Will new high-voltage power lines be built?
About Tract Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026?
About Tract Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ What are the terms of the county tax break?
About Edged Austin data center campus (Maxwell) in Unincorporated Caldwell County - ❓ How much power will it use, and from where?
About Edged Austin data center campus (Maxwell) in Unincorporated Caldwell County - ❓ How much water will it use?
About Edged Austin data center campus (Maxwell) in Unincorporated Caldwell County - ❓ Will Edged build its own gas power plant at the Caldwell County campus, and how big would it be?
About Edged Austin data center campus (Maxwell) in Unincorporated Caldwell County - ❓ Was the land released from Uhland's control?
About PowerHouse data center in Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ How much power and water will it use?
About PowerHouse data center in Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ Who is the tenant?
About PowerHouse data center in Caldwell Valley Technology Park (near Uhland) in Unincorporated Caldwell County - ❓ How much power and water will it use?
About Prime Data Centers AUS01 and AUS02 (Bob White Road, near Lockhart) in Unincorporated Caldwell County - ❓ Did Caldwell County give a tax break?
About Prime Data Centers AUS01 and AUS02 (Bob White Road, near Lockhart) in Unincorporated Caldwell County - ❓ Is the site inside Lockhart city limits?
About Prime Data Centers AUS01 and AUS02 (Bob White Road, near Lockhart) in Unincorporated Caldwell County
Milam County
- ❓ How many acres and buildings?
About OpenAI Stargate data center (Milam County, near Burlington) in Unincorporated Milam County - ❓ How much water will it use and from where?
About OpenAI Stargate data center (Milam County, near Burlington) in Unincorporated Milam County - ❓ Did Milam County give a tax break?
About OpenAI Stargate data center (Milam County, near Burlington) in Unincorporated Milam County - ❓ Will new high-voltage power lines be built?
About OpenAI Stargate data center (Milam County, near Burlington) in Unincorporated Milam County - ❓ Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026?
About OpenAI Stargate data center (Milam County, near Burlington) in Unincorporated Milam County - ❓ When will AI conversion start?
About Bitdeer Rockdale site (bitcoin mine, planned AI expansion) in Unincorporated Milam County - ❓ Is the site inside Rockdale city limits?
About Bitdeer Rockdale site (bitcoin mine, planned AI expansion) in Unincorporated Milam County - ❓ How much water will it use?
About Bitdeer Rockdale site (bitcoin mine, planned AI expansion) in Unincorporated Milam County - ❓ Is the site inside Rockdale city limits or in unincorporated Milam County?
About Riot Platforms Rockdale site (bitcoin mine turning into AI data center) in Unincorporated Milam County - ❓ How much water will the AI data center use?
About Riot Platforms Rockdale site (bitcoin mine turning into AI data center) in Unincorporated Milam County - ❓ Will noise change as it converts?
About Riot Platforms Rockdale site (bitcoin mine turning into AI data center) in Unincorporated Milam County - ❓ How many megawatts did the unnamed AI company lease at Rockdale, and when will it move in?
About Riot Platforms Rockdale site (bitcoin mine turning into AI data center) in Unincorporated Milam County
Taylor County
- ❓ How much water does the campus use each day, and from which supplier?
About Stargate AI data center campus (Lancium Clean Campus, Abilene) in Abilene City - ❓ How many gas turbines and diesel generators run on site, and how much do they emit?
About Stargate AI data center campus (Lancium Clean Campus, Abilene) in Abilene City - 📄 Did any city official sign an agreement to keep the plans private (NDA)?
About Stargate AI data center campus (Lancium Clean Campus, Abilene) in Abilene City - ❓ Are the new Buildings 9 and 10 at 5502 Spinks Road part of Crusoe's Microsoft expansion or more buildings for the first campus?
About Stargate AI data center campus (Lancium Clean Campus, Abilene) in Abilene City - ❓ Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026?
About Stargate AI data center campus (Lancium Clean Campus, Abilene) in Abilene City - ❓ Exactly where is the site, and is it in a city or the county?
About PowerPlay AI and Sharon AI gas-powered data center (near Abilene) in Unincorporated Taylor County - ❓ What air permit will the gas plant need?
About PowerPlay AI and Sharon AI gas-powered data center (near Abilene) in Unincorporated Taylor County - ❓ How much water will it use?
About PowerPlay AI and Sharon AI gas-powered data center (near Abilene) in Unincorporated Taylor County - ❓ What fuel will the 900-megawatt on-site power plant burn, and what air permit does it need?
About Crusoe 900 MW AI campus for Microsoft (Abilene) in Abilene City - ❓ How much water will it use?
About Crusoe 900 MW AI campus for Microsoft (Abilene) in Abilene City - ❓ Will the city give this expansion a tax break too?
About Crusoe 900 MW AI campus for Microsoft (Abilene) in Abilene City
Ward County
- ❓ Is the AI data center running yet?
About Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow) in Unincorporated Ward County - ❓ How much water does it use?
About Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow) in Unincorporated Ward County - ❓ Did Ward County give a tax break?
About Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow) in Unincorporated Ward County - ❓ Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026?
About Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow) in Unincorporated Ward County - ❓ Is new building work starting at the site (the state stormwater permits mention a grading package)?
About Ionic Digital Cedarvale AI data center for Nscale and Microsoft (near Barstow) in Unincorporated Ward County
Ellis County
- ❓ How many buildings run on the campus today, and how much power does the campus use?
About Compass Datacenters DFW III campus (Austin Blvd, Red Oak) in Red Oak City - ❓ How much water does the campus use?
About Compass Datacenters DFW III campus (Austin Blvd, Red Oak) in Red Oak City - ❓ Who are the tenants?
About Compass Datacenters DFW III campus (Austin Blvd, Red Oak) in Red Oak City - ❓ How many diesel backup generators are on site?
About Compass Datacenters DFW III campus (Austin Blvd, Red Oak) in Red Oak City - ❓ When will the large buildings be built?
About Lincoln Rackhouse data center campus (Red Oak, 131 acres) in Red Oak City - ❓ How much water will it use?
About Lincoln Rackhouse data center campus (Red Oak, 131 acres) in Red Oak City - ❓ Did Red Oak give a tax break?
About Lincoln Rackhouse data center campus (Red Oak, 131 acres) in Red Oak City - ❓ How much power will the campus use?
About Compass Datacenters 830-acre campus (Red Oak) in Red Oak City - ❓ How many buildings and when will building start?
About Compass Datacenters 830-acre campus (Red Oak) in Red Oak City - ❓ Will it get a city or county tax break?
About Compass Datacenters 830-acre campus (Red Oak) in Red Oak City - ❓ Where exactly is the land?
About Compass Datacenters 830-acre campus (Red Oak) in Red Oak City - ❓ How much power and water does the full campus use?
About Google Midlothian data center campus (Railport Parkway) - building 5 in Midlothian City - ❓ Are more buildings planned?
About Google Midlothian data center campus (Railport Parkway) - building 5 in Midlothian City - ❓ Will Google use the extra 165 acres it bought in Ellis County for more data centers?
About Google Midlothian data center campus (Railport Parkway) - building 5 in Midlothian City - ❓ Is the land inside Grand Prairie city limits or just outside?
About Provident / PowerHouse hyperscale campus (Grand Prairie, Ellis County) in Grand Prairie City - ❓ Has building started?
About Provident / PowerHouse hyperscale campus (Grand Prairie, Ellis County) in Grand Prairie City - ❓ Who will use it?
About Provident / PowerHouse hyperscale campus (Grand Prairie, Ellis County) in Grand Prairie City - ❓ How much water will it use?
About Provident / PowerHouse hyperscale campus (Grand Prairie, Ellis County) in Grand Prairie City - ❓ How much power will the full campus use?
About DataBank Red Oak campus (Stainback Road) in Red Oak City - ❓ How much water will it use?
About DataBank Red Oak campus (Stainback Road) in Red Oak City - ❓ Did it get tax breaks?
About DataBank Red Oak campus (Stainback Road) in Red Oak City - ❓ Is it running now?
About Google data center (156 N. Austin Blvd., Red Oak) in Red Oak City - ❓ How much power and water does it use?
About Google data center (156 N. Austin Blvd., Red Oak) in Red Oak City
Hood County
- ❓ How much water will it really use? The water district was told 150,000 gallons a day, but the developer later said under 50,000 for three sites.
About Sailfish 'Comanche Circle' data center campus (near Tolar) in Unincorporated Hood County - ❓ Who will run the data center?
About Sailfish 'Comanche Circle' data center campus (near Tolar) in Unincorporated Hood County - ❓ What air permit will the on-site gas plant need?
About Sailfish 'Comanche Circle' data center campus (near Tolar) in Unincorporated Hood County - ❓ Will Sailfish sue Hood County, and what happens to the project's on-site permits now?
About Sailfish 'Comanche Circle' data center campus (near Tolar) in Unincorporated Hood County - ❓ What are Sailfish's related 'Project Lion' and 'Project Panther', and where are they?
About Sailfish 'Comanche Circle' data center campus (near Tolar) in Unincorporated Hood County - ❓ Will the appeal succeed?
About 'Project Red' and 'Project Yellow' data centers (Hood County) in Unincorporated Hood County - ❓ Which power plants are the sites next to, and how much power would they use?
About 'Project Red' and 'Project Yellow' data centers (Hood County) in Unincorporated Hood County - ❓ Who will run the data centers?
About 'Project Red' and 'Project Yellow' data centers (Hood County) in Unincorporated Hood County - ❓ Who is the data center tenant?
About Bilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury) in Granbury City - ❓ How much water will the campus use, and from where?
About Bilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury) in Granbury City - ❓ How did the lawsuit over the annexation turn out?
About Bilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury) in Granbury City - ❓ Will a recall election be held?
About Bilateral Energy 'Project Patriot' power plant and data center campus (Knox Ranch, Granbury) in Granbury City - ❓ Is Project Spectrum still moving forward, or was it withdrawn?
About Amazon 'Project Spectrum' data center campus (Coates Road, near Comanche Peak) in Unincorporated Hood County - ❓ How much water will it use?
About Amazon 'Project Spectrum' data center campus (Coates Road, near Comanche Peak) in Unincorporated Hood County - ❓ Will it get power directly from the Comanche Peak nuclear plant?
About Amazon 'Project Spectrum' data center campus (Coates Road, near Comanche Peak) in Unincorporated Hood County - ❓ What happened in Pacifico's lawsuit against Hood County?
About 'Fort Spunky' data center (Pacifico Energy, Hood County) in Unincorporated Hood County - ❓ Has the developer found another water source?
About 'Fort Spunky' data center (Pacifico Energy, Hood County) in Unincorporated Hood County - ❓ Is the Fort Spunky site about 560 acres or 862 acres? News reports give different numbers.
About 'Fort Spunky' data center (Pacifico Energy, Hood County) in Unincorporated Hood County - ❓ Are there plans to turn it into an AI data center?
About MARA (Marathon) bitcoin mining data center (Granbury area) in Unincorporated Hood County
Hill County
- ❓ How much water will it use each day in total?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ Who is the tenant?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ Has the state air permit for the gas plant been approved?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ How loud will the gas turbines and diesel generators be for neighbors?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ Will TCEQ hold a public hearing on the Nexus gas plant air permit, and when?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ Is the Nexus air permit paused under the governor's order?
About Nexus Apex DFW campus (near Hubbard) in Unincorporated Hill County - ❓ Where exactly is the site?
About Project Aquila (RCM Hill, unincorporated Hill County) in Unincorporated Hill County - ❓ What will the federal court decide?
About Project Aquila (RCM Hill, unincorporated Hill County) in Unincorporated Hill County - ❓ Who is the end user?
About Project Aquila (RCM Hill, unincorporated Hill County) in Unincorporated Hill County - ❓ How much water and power will it use?
About Project Aquila (RCM Hill, unincorporated Hill County) in Unincorporated Hill County - ❓ Did the Hillsboro EDC approve the land sale?
About Provident data center on Hillsboro EDC land in Hillsboro City - ❓ How much power and water would it use?
About Provident data center on Hillsboro EDC land in Hillsboro City
Dallas County
- ❓ Has construction started?
About Yondr data center campus (Lancaster) in Lancaster City - ❓ Did Lancaster give a tax break?
About Yondr data center campus (Lancaster) in Lancaster City - ❓ How much water will it use?
About Yondr data center campus (Lancaster) in Lancaster City - ❓ Are any buildings finished?
About PowerHouse Irving data center campus (111 Customer Way) in Irving City - ❓ Who is the tenant?
About PowerHouse Irving data center campus (111 Customer Way) in Irving City - ❓ How much water does it use?
About PowerHouse Irving data center campus (111 Customer Way) in Irving City - ❓ How much power will they use?
About Prime Data Centers Garland campus (4221 N. Garland Ave.) in Garland City - ❓ How much water?
About Prime Data Centers Garland campus (4221 N. Garland Ave.) in Garland City - ❓ How much power will it use?
About STACK Infrastructure DFW02 campus (Lancaster) in Lancaster City - ❓ When will each building open?
About STACK Infrastructure DFW02 campus (Lancaster) in Lancaster City - ❓ Did it get a tax break?
About STACK Infrastructure DFW02 campus (Lancaster) in Lancaster City - ❓ How much water will it use?
About Crow Holdings / CleanArc data center campus (Stemmons Corridor, Dallas) in Dallas City - ❓ Who will use it?
About Crow Holdings / CleanArc data center campus (Stemmons Corridor, Dallas) in Dallas City - ❓ Will the Crow Holdings data center be built on vacant land or on the Dallas Market Center site? A later trade report says new zoning papers point to the market hall site.
About Crow Holdings / CleanArc data center campus (Stemmons Corridor, Dallas) in Dallas City - ❓ Who will build and use the data centers?
About Project Orange and Project Labrador data center campuses (Lancaster) in Lancaster City - ❓ How much power will the two campuses use?
About Project Orange and Project Labrador data center campuses (Lancaster) in Lancaster City - ❓ How much water?
About Project Orange and Project Labrador data center campuses (Lancaster) in Lancaster City - ❓ Is the site in Wilmer or Lancaster city limits?
About QTS DFW2 campus (303 Mason Road) - ❓ How much power will the campus use?
About QTS DFW2 campus (303 Mason Road) - ❓ How much water?
About QTS DFW2 campus (303 Mason Road) - ❓ How much power will the full campus use?
About Digital Realty Garland campus expansion (Ferris Road / W. Campbell Road) in Garland City - ❓ How much water?
About Digital Realty Garland campus expansion (Ferris Road / W. Campbell Road) in Garland City - ❓ Where in Irving are the buildings?
About Microsoft data centers (four buildings, Irving) in Irving City - ❓ How much power and water will they use?
About Microsoft data centers (four buildings, Irving) in Irving City - ❓ How much power and water will they use?
About QTS Irving campus expansion (three buildings) in Irving City - ❓ When will they open?
About QTS Irving campus expansion (three buildings) in Irving City - ❓ Has building started?
About KDC data center on University of Dallas land (Irving) in Irving City - ❓ How much power will the KDC campus use?
About KDC data center on University of Dallas land (Irving) in Irving City
McLennan County
- ❓ Is the site inside Riesel city limits?
About Cipher Digital data center campus (near Riesel, Sandy Creek coal plant) in Unincorporated McLennan County - ❓ When is the town hall?
About Cipher Digital data center campus (near Riesel, Sandy Creek coal plant) in Unincorporated McLennan County - ❓ How much water will it use?
About Cipher Digital data center campus (near Riesel, Sandy Creek coal plant) in Unincorporated McLennan County - ❓ How many buildings, and when will building start?
About Galaxy Project Merlin data center (McGregor industrial park) in McGregor City - ❓ Will there be a tax break?
About Galaxy Project Merlin data center (McGregor industrial park) in McGregor City - ❓ Did Waco agree to release the land from its ETJ?
About Infrakey data district (west of Elm Mott) in Lacy-Lakeview City - ❓ Has an air permit for the gas plant been filed?
About Infrakey data district (west of Elm Mott) in Lacy-Lakeview City - ❓ Where will 15-16 million gallons a day of water come from?
About Infrakey data district (west of Elm Mott) in Lacy-Lakeview City
Williamson County
- ❓ What air permit will the gas power plant need from TCEQ?
About 'Project Mustang' data center campus (east of Taylor) in Unincorporated Williamson County - ❓ How much water will it use, and from where?
About 'Project Mustang' data center campus (east of Taylor) in Unincorporated Williamson County - ❓ How many megawatts will it use?
About 'Project Mustang' data center campus (east of Taylor) in Unincorporated Williamson County - ❓ Has the land been formally annexed into Taylor, and what zoning will it get?
About 'Project Mustang' data center campus (east of Taylor) in Unincorporated Williamson County - ❓ How big will the on-site power plant be, and what fuel will it use?
About 'Project Mustang' data center campus (east of Taylor) in Unincorporated Williamson County - ❓ On what date did Hutto City Council approve the rezoning?
About Skybox 'Project Sequel' data center campus (Hutto Megasite) in Hutto City - ❓ How many megawatts will the campus use, and will it build its own power plant?
About Skybox 'Project Sequel' data center campus (Hutto Megasite) in Hutto City - ❓ Has Skybox bought the land from the Hutto Economic Development Corp.?
About Skybox 'Project Sequel' data center campus (Hutto Megasite) in Hutto City - ❓ How much water will it use?
About Skybox 'Project Sequel' data center campus (Hutto Megasite) in Hutto City - ❓ Will the developer try again on this or another site?
About Zydeco 'Project Hutto' data center (Ed Schmidt Blvd, Hutto) in Hutto City - ❓ How much water will it use?
About KDC 'Project Comal' data center campus (Taylor) in Taylor City - ❓ Did Taylor give a tax break?
About KDC 'Project Comal' data center campus (Taylor) in Taylor City - ❓ Who is the tenant?
About KDC 'Project Comal' data center campus (Taylor) in Taylor City - ❓ Is the land inside Hutto or Taylor city limits, their ETJ, or the county?
About Iron Mountain 'Taylor Meadows' data center campus (FM 3349, near Hutto and Taylor) in Unincorporated Williamson County - ❓ Will there be an on-site gas power plant?
About Iron Mountain 'Taylor Meadows' data center campus (FM 3349, near Hutto and Taylor) in Unincorporated Williamson County - ❓ How much water will it use?
About Iron Mountain 'Taylor Meadows' data center campus (FM 3349, near Hutto and Taylor) in Unincorporated Williamson County - ❓ Did Round Rock City Council approve the rezoning?
About Skybox data center (Old Settlers Blvd and Kiphen Road, Round Rock) in Round Rock City - ❓ How many megawatts will it use?
About Skybox data center (Old Settlers Blvd and Kiphen Road, Round Rock) in Round Rock City - ❓ Who is the end user?
About Mesone data center (County Road 305, Jarrell) in Jarrell City - ❓ How much water will it use?
About Mesone data center (County Road 305, Jarrell) in Jarrell City - ❓ What permit does the gas generation need?
About Mesone data center (County Road 305, Jarrell) in Jarrell City - ❓ Is the site 52 acres or 87 acres? Reports differ.
About Blueprint data center campus (MLK Jr. Drive, Taylor) in Taylor City - ❓ What tax break did Taylor give, and on what terms?
About Blueprint data center campus (MLK Jr. Drive, Taylor) in Taylor City - ❓ How much water will it use?
About Blueprint data center campus (MLK Jr. Drive, Taylor) in Taylor City - ❓ How much power and water does the campus use in total?
About Sabey Data Centers Austin campus (Round Rock) in Round Rock City - ❓ Has construction started?
About Colovore 'Project Raptor' data center (Hutto) in Hutto City - ❓ How much power will it use?
About Colovore 'Project Raptor' data center (Hutto) in Hutto City - ❓ Has Amazon filed building plans for the data center?
About Amazon data center site (County Road 172, Round Rock) in Round Rock City - ❓ How many buildings are running or being built now?
About Skybox PowerCampus Austin (Hutto) in Hutto City - ❓ How much water does the campus use?
About Skybox PowerCampus Austin (Hutto) in Hutto City - ❓ Who are the tenants?
About Skybox PowerCampus Austin (Hutto) in Hutto City - ❓ How much water will they use?
About Switch 'The Rock' data center campus (Round Rock) in Round Rock City - ❓ Is Switch still planning 125 megawatts in Round Rock, or has the plan grown?
About Switch 'The Rock' data center campus (Round Rock) in Round Rock City
Tarrant County
- ❓ How many buildings in total?
About CyrusOne DFW7 campus (Asphalt Drive, Fort Worth) in Fort Worth City - ❓ How much water will it use?
About CyrusOne DFW7 campus (Asphalt Drive, Fort Worth) in Fort Worth City - 📄 Will the Town Council approve the development agreement?
About Circle T data center (Westlake, near Keller) in Westlake Town - ❓ How much water will it use?
About Circle T data center (Westlake, near Keller) in Westlake Town - ❓ What did the judge decide at the Oct. 23, 2026 hearing on whether the neighbors can keep their lawsuit going?
About Circle T data center (Westlake, near Keller) in Westlake Town - ❓ How much power will it use?
About Black Mountain data center campus (southeast Fort Worth) in Fort Worth City - ❓ Who is the tenant? One newspaper called it an Amazon data center.
About Black Mountain data center campus (southeast Fort Worth) in Fort Worth City - ❓ How much city water will it use each day?
About Black Mountain data center campus (southeast Fort Worth) in Fort Worth City - ❓ Will there be on-site gas power or diesel generators?
About Black Mountain data center campus (southeast Fort Worth) in Fort Worth City - ❓ When will the city vote on it?
About Provident data center (old Santander site, Rufe Snow Drive) in North Richland Hills City - ❓ How much power and water would it use?
About Provident data center (old Santander site, Rufe Snow Drive) in North Richland Hills City - ❓ Has the City Council voted on the tax break since March 2026?
About Edged data center (Veale Ranch, west Fort Worth) in Fort Worth City - ❓ How much power will it use?
About Edged data center (Veale Ranch, west Fort Worth) in Fort Worth City - ❓ Who is the tenant?
About Edged data center (Veale Ranch, west Fort Worth) in Fort Worth City - ❓ How much power will the whole campus use when done?
About QTS Fort Worth campus expansion (FTW1, 14100 Park Vista Blvd.) in Fort Worth City - ❓ How much water does it use?
About QTS Fort Worth campus expansion (FTW1, 14100 Park Vista Blvd.) in Fort Worth City - ❓ How much power will it use?
About Aligned DFW-03 data center (3801 Britton Road, Mansfield) in Mansfield City - ❓ Is it running yet?
About Aligned DFW-03 data center (3801 Britton Road, Mansfield) in Mansfield City - ❓ How much water does it use?
About Aligned DFW-03 data center (3801 Britton Road, Mansfield) in Mansfield City - ❓ Is the first building running?
About Prime Data Centers DFW04 campus (Aledo Road and Chapin School Road) in Fort Worth City - ❓ How much water will it use?
About Prime Data Centers DFW04 campus (Aledo Road and Chapin School Road) in Fort Worth City - ❓ Was the first building finished in early 2026, as the state filing planned?
About Prime Data Centers DFW04 campus (Aledo Road and Chapin School Road) in Fort Worth City
Bastrop County
- ❓ When will plans be filed?
About EdgeConneX Cedar Creek campus 3 (6543 FM 535) in Unincorporated Bastrop County - ❓ How much power and water would it use?
About EdgeConneX Cedar Creek campus 3 (6543 FM 535) in Unincorporated Bastrop County - ❓ Has the state air permit (TCEQ) for the gas plant been approved?
About Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road) in Unincorporated Bastrop County - ❓ Will the project still be built here, or at the company's other possible site in Ohio?
About Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road) in Unincorporated Bastrop County - ❓ How much water will the plant and data center use?
About Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road) in Unincorporated Bastrop County - ❓ Is the 'Project Longhorn - Building One' state filing on Earl Callahan Road part of this campus? The filing names no company.
About Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road) in Unincorporated Bastrop County - ❓ News reports say the data center developer is in talks with Anthropic. Who will actually use the data center?
About Pacifico Cedar Creek gas plant and data center campus (Earl Callahan Road) in Unincorporated Bastrop County - ❓ How much power and water will it use?
About EdgeConneX Cedar Creek campus 2 (6682 and 6402 FM 535) in Unincorporated Bastrop County - ❓ Will Bastrop County give a tax break?
About EdgeConneX Cedar Creek campus 2 (6682 and 6402 FM 535) in Unincorporated Bastrop County - ❓ Who is the tenant?
About EdgeConneX Cedar Creek campus 2 (6682 and 6402 FM 535) in Unincorporated Bastrop County - ❓ How much power does it use?
About EdgeConneX Cedar Creek campus 1 (FM 535 and Wolf Lane) in Unincorporated Bastrop County - ❓ How much water does it use each day?
About EdgeConneX Cedar Creek campus 1 (FM 535 and Wolf Lane) in Unincorporated Bastrop County - ❓ How many diesel backup generators are on site?
About EdgeConneX Cedar Creek campus 1 (FM 535 and Wolf Lane) in Unincorporated Bastrop County
Harris County
- ❓ How much water does it use?
About TRG Datacenters HOU2 (2626 Spring Cypress Road, Spring) in Unincorporated Harris County - ❓ Will the city require a special use permit, and when is the vote?
About Raeden AI data center (old glass bottle plant, Jacinto City) in Jacinto City City - ❓ Who is the tenant?
About Raeden AI data center (old glass bottle plant, Jacinto City) in Jacinto City City - ❓ What noise limits will apply?
About Raeden AI data center (old glass bottle plant, Jacinto City) in Jacinto City City - ❓ Which sites are inside Houston city limits?
About Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road) - ❓ Who are the tenants?
About Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road) - ❓ How much water do they use?
About Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road) - ❓ Are the two new buildings finished and running?
About Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road)
Collin County
- ❓ How much power will it use?
About Aligned DFW-04 data center for Lambda (401 N. Star Road, Plano) in Plano City - ❓ How much water?
About Aligned DFW-04 data center for Lambda (401 N. Star Road, Plano) in Plano City - ❓ Did Plano give a tax break?
About Aligned DFW-04 data center for Lambda (401 N. Star Road, Plano) in Plano City - ❓ Is the site inside a city's limits?
About BT Aycock data center (CR 561, east of Princeton) - ❓ How big will it be and how much power?
About BT Aycock data center (CR 561, east of Princeton) - ❓ Who is the owner behind the company?
About BT Aycock data center (CR 561, east of Princeton)
Willacy County
- ❓ How loud is the site for neighbors?
About Soluna 'Project Kati' bitcoin and AI data center (Willacy County) in Unincorporated Willacy County - ❓ How much water does it use?
About Soluna 'Project Kati' bitcoin and AI data center (Willacy County) in Unincorporated Willacy County - ❓ Has construction of Kati 2 started?
About Soluna 'Project Kati' bitcoin and AI data center (Willacy County) in Unincorporated Willacy County
Bexar County
- ❓ Which data center company will build here?
About Tract 'Applewhite Technology Park' (south San Antonio) in San Antonio City - ❓ Is all the land inside San Antonio city limits?
About Tract 'Applewhite Technology Park' (south San Antonio) in San Antonio City - ❓ Will the environmental groups file their Clean Air Act lawsuit, and what happens to the air permits?
About Vantage TX1 data center campus, TX11 and TX12 (Texas Research Park) in Unincorporated Bexar County - ❓ Who are the tenants?
About Vantage TX1 data center campus, TX11 and TX12 (Texas Research Park) in Unincorporated Bexar County - ❓ How much water will the campus use?
About Vantage TX1 data center campus, TX11 and TX12 (Texas Research Park) in Unincorporated Bexar County - ❓ Were any tax breaks given?
About Vantage TX1 data center campus, TX11 and TX12 (Texas Research Park) in Unincorporated Bexar County - ❓ How much power and water will it use?
About Amazon 'Lavender Hill' data center (State Highway 211) in Unincorporated Bexar County - ❓ Is the site inside San Antonio city limits?
About Amazon 'Lavender Hill' data center (State Highway 211) in Unincorporated Bexar County - ❓ How much power and water will it use?
About Amazon 'Bitter Blue' data center (Donop Road, San Antonio) in San Antonio City - ❓ Will a new substation or power line be needed?
About Amazon 'Bitter Blue' data center (Donop Road, San Antonio) in San Antonio City - ❓ Who is the tenant?
About COPT Potranco data center shell building (San Antonio) in San Antonio City - ❓ How much power will it use?
About COPT Potranco data center shell building (San Antonio) in San Antonio City - ❓ Will this site become a data center, and when?
About Black Mountain Power site (State Highway 16 and Lone Star Pass, south San Antonio) in San Antonio City - ❓ Will it have its own power plant?
About Black Mountain Power site (State Highway 16 and Lone Star Pass, south San Antonio) in San Antonio City - ❓ Is TX21 running yet?
About Vantage data center site, TX21 and TX22 (Westover Hills, San Antonio) in San Antonio City - ❓ How many megawatts will the site use?
About Vantage data center site, TX21 and TX22 (Westover Hills, San Antonio) in San Antonio City - ❓ Will it use on-site gas power like TX12?
About Vantage data center site, TX21 and TX22 (Westover Hills, San Antonio) in San Antonio City - ❓ How many buildings are running now?
About Stream Data Centers San Antonio III campus (West Military Drive) in San Antonio City - ❓ Who is the tenant?
About Stream Data Centers San Antonio III campus (West Military Drive) in San Antonio City - ❓ How much water does it use?
About Stream Data Centers San Antonio III campus (West Military Drive) in San Antonio City - ❓ How much power and water do the Westover Hills buildings use?
About Microsoft data centers SAT14, SAT15, SAT16 (Westover Hills, San Antonio) in San Antonio City - ❓ How many diesel backup generators are on site?
About Microsoft data centers SAT14, SAT15, SAT16 (Westover Hills, San Antonio) in San Antonio City - ❓ Has QTS filed building plans?
About QTS San Antonio III data center site (Omicron subdivision) in Unincorporated Bexar County - ❓ How much power will it use?
About QTS San Antonio III data center site (Omicron subdivision) in Unincorporated Bexar County - ❓ When will construction of the first building start?
About CloudHQ SAT data center campus (Texas Research Park) in Unincorporated Bexar County - ❓ Who is the tenant?
About CloudHQ SAT data center campus (Texas Research Park) in Unincorporated Bexar County - ❓ How much water will the campus use, and from which supplier?
About CloudHQ SAT data center campus (Texas Research Park) in Unincorporated Bexar County - ❓ How many diesel generators are planned?
About CloudHQ SAT data center campus (Texas Research Park) in Unincorporated Bexar County
Kaufman County
- ❓ Is the site inside a city or in unincorporated Kaufman County?
About Prometheus Hyperscale campus (between Talty and Post Oak Bend City) - ❓ Has an air permit for the gas engines been filed?
About Prometheus Hyperscale campus (between Talty and Post Oak Bend City) - ❓ How much water will it use?
About Prometheus Hyperscale campus (between Talty and Post Oak Bend City)
Newton County
- ❓ Where is the site?
About East Texas Energy Campus data center (Clean Holding Company, Newton County) - ❓ How will it be powered, and how much water will it use?
About East Texas Energy Campus data center (Clean Holding Company, Newton County) - ❓ Has the county signed the letter or any tax deal?
About East Texas Energy Campus data center (Clean Holding Company, Newton County)
Kent County
- ❓ Where exactly is the site, and how many acres is it?
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City - ❓ How many megawatts will it use, and where will the power come from?
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City - ❓ Who will use the data centers?
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City - ❓ Will Kent County give a tax break?
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City - ❓ How much water will it use, and from where?
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City - ❓ Are Spur DC Owner 1 and 2 LLC, the owners on the state filings, part of Crusoe? The filings do not name Crusoe.
About Crusoe 'Project Hyper' spur campus (Jayton) in Jayton City
Scurry County
- ❓ Where is the site, and how big will it be?
About SB Energy proposed data center (Scurry County) in Unincorporated Scurry County - 📄 What does the proposed county development agreement say, and when will commissioners vote?
About SB Energy proposed data center (Scurry County) in Unincorporated Scurry County - ❓ Where will power and water come from?
About SB Energy proposed data center (Scurry County) in Unincorporated Scurry County - ❓ Is the site inside Snyder city limits?
About Energy Vault AI campus with Crusoe modular data centers (Snyder) in Unincorporated Scurry County - ❓ Where will its power come from?
About Energy Vault AI campus with Crusoe modular data centers (Snyder) in Unincorporated Scurry County - ❓ Will it grow toward 500 megawatts?
About Energy Vault AI campus with Crusoe modular data centers (Snyder) in Unincorporated Scurry County
Nueces County
- ❓ Which company will use the data center?
About Hut 8 'Beacon Point' AI data center campus (between Robstown and Calallen) in Corpus Christi City - ❓ What kind of backup generators will be on site, and how many?
About Hut 8 'Beacon Point' AI data center campus (between Robstown and Calallen) in Corpus Christi City - ❓ How loud will the site be for nearby homes?
About Hut 8 'Beacon Point' AI data center campus (between Robstown and Calallen) in Corpus Christi City - ❓ How much water will it use during the county's drought restrictions, beyond the first fill?
About Hut 8 'Beacon Point' AI data center campus (between Robstown and Calallen) in Corpus Christi City - 📄 Where exactly are the site's boundaries?
About Hut 8 'Beacon Point' AI data center campus (between Robstown and Calallen) in Corpus Christi City - ❓ Exactly where are the two sites, and are they inside Corpus Christi city limits?
About Peak Mining bitcoin data centers (Corpus Christi area) in Unincorporated Nueces County - ❓ Who owns and runs them now?
About Peak Mining bitcoin data centers (Corpus Christi area) in Unincorporated Nueces County - ❓ Are they running?
About Peak Mining bitcoin data centers (Corpus Christi area) in Unincorporated Nueces County
Denton County
- ❓ Is the site in the Denton County or Tarrant County part of Fort Worth?
About Colovore Alliance AI data center (AllianceTexas) in Fort Worth City - ❓ How much water will it use?
About Colovore Alliance AI data center (AllianceTexas) in Fort Worth City - ❓ Reports differ on whether the site is in the Denton County or Collin County part of Prosper.
About Project Tomahawk data center (Prosper, withdrawn) in Prosper Town - ❓ How much water will it use?
About QumulusAI modular data center (Denton) in Denton City - ❓ How long does the tax break last?
About QumulusAI modular data center (Denton) in Denton City - ❓ How much water will it use each day?
About Core Scientific / CoreWeave AI data center (Jim Christal Road, Denton) in Denton City - ❓ Will the city's gas power plant run more to serve it?
About Core Scientific / CoreWeave AI data center (Jim Christal Road, Denton) in Denton City
Hunt County
- ❓ How much water will it use?
About BT Gateway AI data center (Giga Energy, near Royse City) in Unincorporated Hunt County - ❓ How much power (megawatts) will it use?
About BT Gateway AI data center (Giga Energy, near Royse City) in Unincorporated Hunt County - ❓ Has construction started?
About BT Gateway AI data center (Giga Energy, near Royse City) in Unincorporated Hunt County - ❓ Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026?
About BT Gateway AI data center (Giga Energy, near Royse City) in Unincorporated Hunt County - ❓ How much water will it use?
About Core Scientific / Telios AI data center campus (Wieland, Hunt County) in Unincorporated Hunt County - ❓ Will Hunt County give a tax break?
About Core Scientific / Telios AI data center campus (Wieland, Hunt County) in Unincorporated Hunt County - ❓ Who is the tenant?
About Core Scientific / Telios AI data center campus (Wieland, Hunt County) in Unincorporated Hunt County
Potter County
- ❓ Exactly where in Potter County is the land?
About Zone Frontier data center campus (Potter County) in Unincorporated Potter County - ❓ How much water will it use?
About Zone Frontier data center campus (Potter County) in Unincorporated Potter County - ❓ Will it ask Potter County for a tax break?
About Zone Frontier data center campus (Potter County) in Unincorporated Potter County
Reeves County
- ❓ Exactly where is the site, and is it inside Pecos city limits?
About Microsoft Pecos AI data center with Chevron's Project Kilby gas plant in Unincorporated Reeves County - ❓ Has Chevron made its final decision to build the power plant?
About Microsoft Pecos AI data center with Chevron's Project Kilby gas plant in Unincorporated Reeves County - ❓ Did Reeves County or Pecos give tax breaks?
About Microsoft Pecos AI data center with Chevron's Project Kilby gas plant in Unincorporated Reeves County - ❓ How many permanent jobs will there be?
About Microsoft Pecos AI data center with Chevron's Project Kilby gas plant in Unincorporated Reeves County - ❓ Where exactly is the site?
About Prometheus Hyperscale Pecos campus in Unincorporated Reeves County - ❓ Has it applied for a state air permit for its gas engines?
About Prometheus Hyperscale Pecos campus in Unincorporated Reeves County - ❓ Will it ask Reeves County for a tax break?
About Prometheus Hyperscale Pecos campus in Unincorporated Reeves County - ❓ What kind of on-site power plant will be built, and does it need an air permit?
About Core Scientific Pecos AI data center expansion in Unincorporated Reeves County - ❓ Who will lease the AI space?
About Core Scientific Pecos AI data center expansion in Unincorporated Reeves County - ❓ How much water will the expanded campus use?
About Core Scientific Pecos AI data center expansion in Unincorporated Reeves County - ❓ Who would use the data centers?
About PowerBridge Alpha Digital Campus (LandBridge land near Waha) in Unincorporated Reeves County - ❓ How much water would the campus use?
About PowerBridge Alpha Digital Campus (LandBridge land near Waha) in Unincorporated Reeves County - ❓ Has PowerBridge applied for state air permits?
About PowerBridge Alpha Digital Campus (LandBridge land near Waha) in Unincorporated Reeves County
Armstrong County
- ❓ What tax break did Armstrong County give, and for how long?
About Crusoe Goodnight data center campus for Google (near Claude) in Unincorporated Armstrong County - ❓ How much air pollution will the gas turbines and diesel generators release?
About Crusoe Goodnight data center campus for Google (near Claude) in Unincorporated Armstrong County - ❓ How many permanent jobs will the campus have?
About Crusoe Goodnight data center campus for Google (near Claude) in Unincorporated Armstrong County
Bowie County
- ❓ Who is the buyer and end user?
About Datahub Developers AI data center (East Texas Logistics Center, I-30) - ❓ How big will it be?
About Datahub Developers AI data center (East Texas Logistics Center, I-30) - ❓ Is the site inside Hooks city limits?
About Datahub Developers AI data center (East Texas Logistics Center, I-30) - ❓ Which company would build a data center here?
About Project Big Pine (TexAmericas Center) - ❓ What kind of on-site power plant would be used?
About Project Big Pine (TexAmericas Center) - ❓ How much water would it use?
About Project Big Pine (TexAmericas Center)
Hopkins County
- ❓ What will the court decide about the deed ban on power generation?
About CyrusOne data center on old Thermo mine land (near Sulphur Springs) in Unincorporated Hopkins County - ❓ How many buildings and how much power?
About CyrusOne data center on old Thermo mine land (near Sulphur Springs) in Unincorporated Hopkins County - ❓ What deal does the City of Sulphur Springs have on this land?
About CyrusOne data center on old Thermo mine land (near Sulphur Springs) in Unincorporated Hopkins County
Shackelford County
- ❓ Where will the power come from, and will new power lines or a gas plant be built?
About Vantage 'Frontier' AI data center campus (Shackelford County) in Unincorporated Shackelford County - ❓ How much water will it use, and from where?
About Vantage 'Frontier' AI data center campus (Shackelford County) in Unincorporated Shackelford County - ❓ Did Shackelford County give a tax break?
About Vantage 'Frontier' AI data center campus (Shackelford County) in Unincorporated Shackelford County - ❓ How many diesel backup generators will there be?
About Vantage 'Frontier' AI data center campus (Shackelford County) in Unincorporated Shackelford County - ❓ When will TCEQ set the public comment deadline for the VoltaGrid power plant air permit?
About Vantage 'Frontier' AI data center campus (Shackelford County) in Unincorporated Shackelford County - ❓ How big will it be and how much power and water will it use?
About Bolt Data and Energy 'Project North' (west of Albany) in Unincorporated Shackelford County - ❓ What fuel will its on-site power plant burn?
About Bolt Data and Energy 'Project North' (west of Albany) in Unincorporated Shackelford County - ❓ Will the county give a tax break?
About Bolt Data and Energy 'Project North' (west of Albany) in Unincorporated Shackelford County
Bell County
- ❓ How many megawatts will each building use, and who is the tenant?
About Rowan 'Project Temple' data center campus, incl. Lasso building (Temple) in Temple City - ❓ How many diesel backup generators are planned?
About Rowan 'Project Temple' data center campus, incl. Lasso building (Temple) in Temple City - ❓ Will new high-voltage power lines be built?
About Rowan 'Project Temple' data center campus, incl. Lasso building (Temple) in Temple City - ❓ How much water does the Temple data center withdraw each year? (Meta says it will publish this in fall 2026.)
About Meta AI data center (Temple) in Temple City - ❓ Is a third building planned?
About Meta AI data center (Temple) in Temple City - ❓ How many megawatts will Stampede and Ranger use?
About Rowan 'Project Stampede' and 'Project Ranger' data centers (Temple) in Temple City - ❓ Who is the tenant?
About Rowan 'Project Stampede' and 'Project Ranger' data centers (Temple) in Temple City - ❓ What tax breaks were given for Stampede and Ranger?
About Rowan 'Project Stampede' and 'Project Ranger' data centers (Temple) in Temple City - ❓ Is Project Ranger under construction yet?
About Rowan 'Project Stampede' and 'Project Ranger' data centers (Temple) in Temple City
Childress County
- ❓ Has construction started?
About Crusoe and Lancium 1-gigawatt AI campus (Childress) in Unincorporated Childress County - ❓ Who is the tech company that will use it?
About Crusoe and Lancium 1-gigawatt AI campus (Childress) in Unincorporated Childress County - ❓ Did Childress County give a tax break?
About Crusoe and Lancium 1-gigawatt AI campus (Childress) in Unincorporated Childress County - ❓ Will new power lines be needed?
About Crusoe and Lancium 1-gigawatt AI campus (Childress) in Unincorporated Childress County - ❓ Are the 'Project Hyper - Childress' state filings (Childress DC1 and DC3 LLC) the same campus Crusoe and Lancium announced? The filings do not name Crusoe.
About Crusoe and Lancium 1-gigawatt AI campus (Childress) in Unincorporated Childress County - ❓ How much water do the new AI halls use?
About IREN Childress campus (bitcoin mine becoming AI data center for Microsoft) in Unincorporated Childress County - ❓ Did Childress County give a tax break?
About IREN Childress campus (bitcoin mine becoming AI data center for Microsoft) in Unincorporated Childress County - ❓ Is the site inside Childress city limits?
About IREN Childress campus (bitcoin mine becoming AI data center for Microsoft) in Unincorporated Childress County
Cameron County
- ❓ When will FluidStack hold its open house?
About FluidStack data center (outside Harlingen) in Unincorporated Cameron County - ❓ Did Cameron County give a tax break?
About FluidStack data center (outside Harlingen) in Unincorporated Cameron County - ❓ How many megawatts will the FluidStack campus use?
About FluidStack data center (outside Harlingen) in Unincorporated Cameron County - ❓ How much water will it use?
About FluidStack data center (outside Harlingen) in Unincorporated Cameron County - ❓ Is the site really in Cameron County, near Rio Hondo?
About Soluna 'Project Ellen' crypto and AI data center (South Texas wind farm) in Unincorporated Cameron County - ❓ Has a final power deal been signed?
About Soluna 'Project Ellen' crypto and AI data center (South Texas wind farm) in Unincorporated Cameron County - ❓ Exactly where is the site?
About Soluna 'Project Hedy' crypto and AI data center (Cameron County) in Unincorporated Cameron County - ❓ Has construction started?
About Soluna 'Project Hedy' crypto and AI data center (Cameron County) in Unincorporated Cameron County
Wharton County
- ❓ How much power will it use in total? Amazon has not confirmed.
About Amazon (AWS) data center campus near Boling in Unincorporated Wharton County - ❓ Will Amazon apply for surface water from the LCRA, and how much?
About Amazon (AWS) data center campus near Boling in Unincorporated Wharton County - ❓ How many diesel backup generators will there be?
About Amazon (AWS) data center campus near Boling in Unincorporated Wharton County - ❓ Did Wharton County give a tax break?
About Amazon (AWS) data center campus near Boling in Unincorporated Wharton County - 📄 Where exactly is the site? A parcel number, address or agenda link helps.
About Amazon (AWS) data center campus near Boling in Unincorporated Wharton County
Travis County
- ❓ Is this a data center or an R&D center? The company and its filings say different things.
About Cosmos Technology Campus (former 3M site, Four Points, Austin) in Austin City - ❓ How much water will it use?
About Cosmos Technology Campus (former 3M site, Four Points, Austin) in Austin City - ❓ How much power do Cortex 1 and 2 use?
About Tesla Cortex AI data centers (Giga Texas) in Unincorporated Travis County - ❓ How much water do they use?
About Tesla Cortex AI data centers (Giga Texas) in Unincorporated Travis County - ❓ How many on-site batteries or generators back them up?
About Tesla Cortex AI data centers (Giga Texas) in Unincorporated Travis County - ❓ Was the new building approved and built?
About Switch data center expansion (Smith School Road, Austin) in Austin City - ❓ How much power will it add?
About Switch data center expansion (Smith School Road, Austin) in Austin City - ❓ Is the second building finished?
About Skybox Austin data center campus (Pflugerville) in Pflugerville City - ❓ How much power does the campus use in total?
About Skybox Austin data center campus (Pflugerville) in Pflugerville City
Ector County
- ❓ Where exactly is the site?
About Sangha Renewables Project Genesis data center (solar-powered) in Unincorporated Ector County - ❓ Is any part of it running now, and for what (AI or bitcoin mining)?
About Sangha Renewables Project Genesis data center (solar-powered) in Unincorporated Ector County - ❓ How much water will it use?
About Sangha Renewables Project Genesis data center (solar-powered) in Unincorporated Ector County - ❓ Has TCEQ received an air permit request for the planned gas plant?
About Texas Critical Data Centers AI campus (near Penwell) in Unincorporated Ector County - ❓ How much water will the campus use, and from where?
About Texas Critical Data Centers AI campus (near Penwell) in Unincorporated Ector County - ❓ Did Ector County give a tax break?
About Texas Critical Data Centers AI campus (near Penwell) in Unincorporated Ector County - ❓ Has main construction started?
About Texas Critical Data Centers AI campus (near Penwell) in Unincorporated Ector County
Smith County
- ❓ Did the developer appeal to the City Council?
About Vulcan Core bitcoin mine / data center (W. Erwin St., Tyler) in Tyler City - ❓ Is Barrio Resources still fighting the Tyler permit decision in court?
About Vulcan Core bitcoin mine / data center (W. Erwin St., Tyler) in Tyler City
Deaf Smith County
- ❓ How many megawatts will the data center use?
About Google Project Roman data center (near Hereford) in Unincorporated Deaf Smith County - ❓ How much water will it pump from the Santa Rosa Aquifer each day?
About Google Project Roman data center (near Hereford) in Unincorporated Deaf Smith County - ❓ Did the county and hospital district approve tax breaks, and on what terms?
About Google Project Roman data center (near Hereford) in Unincorporated Deaf Smith County - ❓ Will there be a contested hearing on the gas plant air permit?
About Google Project Roman data center (near Hereford) in Unincorporated Deaf Smith County
Angelina County
- ❓ How much power will it use? One report says 2.1 gigawatts.
About AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin) in Unincorporated Angelina County - ❓ Has Oncor agreed to supply power?
About AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin) in Unincorporated Angelina County - ❓ Will the county approve a tax break, and with what rules (noise, buffers, cleanup bond)?
About AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin) in Unincorporated Angelina County - ❓ How much water will it use each day?
About AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin) in Unincorporated Angelina County - 📄 Did any official sign an agreement to keep the plans private (NDA)?
About AmpZ Champion AI data center (old Southland Paper Mill, near Lufkin) in Unincorporated Angelina County - ❓ How big will it be (power use, buildings)?
About HyperDataGrid data center (old Northern Chip Mill, Hwy 103 West) in Unincorporated Angelina County - ❓ Who is the end user?
About HyperDataGrid data center (old Northern Chip Mill, Hwy 103 West) in Unincorporated Angelina County - ❓ Did it get a tax break?
About HyperDataGrid data center (old Northern Chip Mill, Hwy 103 West) in Unincorporated Angelina County - ❓ How much water will it use?
About HyperDataGrid data center (old Northern Chip Mill, Hwy 103 West) in Unincorporated Angelina County - ❓ Has the purchase closed?
About 1606 Corp. AI data center at a Lufkin power plant in Lufkin City - ❓ Will the plant restart, and what fuel will it burn?
About 1606 Corp. AI data center at a Lufkin power plant in Lufkin City - ❓ Is the site inside Lufkin city limits?
About 1606 Corp. AI data center at a Lufkin power plant in Lufkin City
Henderson County
- ❓ Will the developer look at land just outside Athens city limits?
About Data Factory data center (Athens) in Athens City - ❓ The landowners are still looking to sell or use the land. Could another data center developer come in?
About Diode Ventures data center near Cedar Creek Reservoir (canceled)
Carson County
- ❓ Where exactly is the site?
About InfraTech Capital $2.7 billion data center campus (Carson County, near Amarillo) in Unincorporated Carson County - ❓ How much power and water will it need, and from where?
About InfraTech Capital $2.7 billion data center campus (Carson County, near Amarillo) in Unincorporated Carson County - ❓ Who is the tenant?
About InfraTech Capital $2.7 billion data center campus (Carson County, near Amarillo) in Unincorporated Carson County - ❓ How much water will the campus use each day once data centers run?
About Fermi America Project Matador (HyperGrid) energy and data center campus in Unincorporated Carson County - ❓ Has Carson County or any other local body given a tax break?
About Fermi America Project Matador (HyperGrid) energy and data center campus in Unincorporated Carson County - ❓ How much air pollution will the gas plants release, and where can residents see the air permits?
About Fermi America Project Matador (HyperGrid) energy and data center campus in Unincorporated Carson County - ❓ When will the first data center building actually open?
About Fermi America Project Matador (HyperGrid) energy and data center campus in Unincorporated Carson County - ❓ How many gallons a day did Amarillo agree to sell Fermi, and when did the council vote?
About Fermi America Project Matador (HyperGrid) energy and data center campus in Unincorporated Carson County
Brazos County
- ❓ When will construction start?
About RELLIS data and research center (Texas A&M RELLIS Campus) in Bryan City - ❓ How much power and water will it use?
About RELLIS data and research center (Texas A&M RELLIS Campus) in Bryan City - ❓ Who will use it?
About RELLIS data and research center (Texas A&M RELLIS Campus) in Bryan City - ❓ Is the developer looking at another site nearby?
About Project Aggie AI data center (Midtown Business Park, College Station) in College Station City
Tom Green County
- ❓ How many megawatts will the campus use?
About Beacon Data Centers Dove Creek campus (Westline site) in Unincorporated Tom Green County - ❓ How much water will it use, and from what wells?
About Beacon Data Centers Dove Creek campus (Westline site) in Unincorporated Tom Green County - ❓ When will TCEQ open public comment on the air permit?
About Beacon Data Centers Dove Creek campus (Westline site) in Unincorporated Tom Green County - ❓ Who will use the data center?
About Beacon Data Centers Dove Creek campus (Westline site) in Unincorporated Tom Green County - ❓ Has the land sale been finalized?
About Skybox / Emergent data center on city land (San Angelo City Farm) in San Angelo City - 📄 What will the 380 incentive agreement include, and when will council vote?
About Skybox / Emergent data center on city land (San Angelo City Farm) in San Angelo City - ❓ Who will use the data center?
About Skybox / Emergent data center on city land (San Angelo City Farm) in San Angelo City - 📄 What confidentiality terms are in the city's agreements?
About Skybox / Emergent data center on city land (San Angelo City Farm) in San Angelo City - ❓ Who will use the data center?
About Cipher Colchis data center site (northeast of San Angelo) in Unincorporated Tom Green County - ❓ How much water will it use, and from where?
About Cipher Colchis data center site (northeast of San Angelo) in Unincorporated Tom Green County - ❓ Will Tom Green County be asked for a tax break?
About Cipher Colchis data center site (northeast of San Angelo) in Unincorporated Tom Green County
Floyd County
- ❓ Did Floyd County approve the tax break, and what are the terms?
About Amazon Horizon Junction data center campus (Floydada) in Unincorporated Floyd County - ❓ How much water and power will the campus use?
About Amazon Horizon Junction data center campus (Floydada) in Unincorporated Floyd County - ❓ Will Amazon build a gas power plant on site?
About Amazon Horizon Junction data center campus (Floydada) in Unincorporated Floyd County - ❓ Where exactly is the site, and is it the same as the 'Horizon Junction' buildings Amazon registered with the state?
About Amazon Horizon Junction data center campus (Floydada) in Unincorporated Floyd County
Andrews County
- ❓ Where exactly is the site, and is it inside Andrews city limits?
About Cipher Stingray AI data center for Amazon (Andrews) in Unincorporated Andrews County - ❓ How much water will it use?
About Cipher Stingray AI data center for Amazon (Andrews) in Unincorporated Andrews County - ❓ Did Andrews County give a tax break?
About Cipher Stingray AI data center for Amazon (Andrews) in Unincorporated Andrews County
Pecos County
- ❓ Did Pecos County give Amazon or Pacifico a tax break?
About GW Ranch off-grid power and Amazon data center campus (north of Fort Stockton) in Unincorporated Pecos County - ❓ How much groundwater will the campus and power plant use?
About GW Ranch off-grid power and Amazon data center campus (north of Fort Stockton) in Unincorporated Pecos County - ❓ How many permanent jobs will there be?
About GW Ranch off-grid power and Amazon data center campus (north of Fort Stockton) in Unincorporated Pecos County - ❓ Is Poolside still building, and has it found a new tenant or funding?
About Poolside Project Horizon AI campus (near Fort Stockton) in Unincorporated Pecos County - ❓ Did Pecos County give a tax break?
About Poolside Project Horizon AI campus (near Fort Stockton) in Unincorporated Pecos County - ❓ How much groundwater will it use?
About Poolside Project Horizon AI campus (near Fort Stockton) in Unincorporated Pecos County
Young County
- ❓ Will Young County approve the tax break, and when will it vote?
About Stream / Headwaters 'Project Saltworks' data center campus (Graham) in Graham City - ❓ Has the developer asked to be annexed into the City of Graham?
About Stream / Headwaters 'Project Saltworks' data center campus (Graham) in Graham City - ❓ How many megawatts will it use?
About Stream / Headwaters 'Project Saltworks' data center campus (Graham) in Graham City - ❓ How much water will it use? The developer asked for about 34,000 gallons of drinking water a day plus treated wastewater.
About Stream / Headwaters 'Project Saltworks' data center campus (Graham) in Graham City - ❓ Who will use the data center?
About Stream / Headwaters 'Project Saltworks' data center campus (Graham) in Graham City
Winkler County
- ❓ How much water does the site use?
About Cipher Black Pearl AI data center for Amazon (near Wink) in Unincorporated Winkler County - ❓ Did Winkler County give a tax break?
About Cipher Black Pearl AI data center for Amazon (near Wink) in Unincorporated Winkler County - ❓ Does the site have backup diesel generators, and how many?
About Cipher Black Pearl AI data center for Amazon (near Wink) in Unincorporated Winkler County
Lubbock County
- ❓ Has Lubbock Power & Light approved the power hookup?
About Corva Project Infrared data center (Northeast Lubbock) in Lubbock City - ❓ Will the city's new data center rules apply to this project?
About Corva Project Infrared data center (Northeast Lubbock) in Lubbock City - ❓ Has Texas Solar Works filed a new plan with the city?
About Texas Solar Works hyperscale data center plan (Northeast Lubbock) in Lubbock City - ❓ Who was the planned end user?
About Texas Solar Works hyperscale data center plan (Northeast Lubbock) in Lubbock City
El Paso County
- ❓ Has the state utility commission (PUC) approved the McCloud gas plant, and who will pay for it after 5 years?
About Meta El Paso data center campus in El Paso City - ❓ How many years does the city tax break last? Reports say 15, 25 or 35 years.
About Meta El Paso data center campus in El Paso City - ❓ How much water will the campus actually use each day once it runs?
About Meta El Paso data center campus in El Paso City - ❓ Did El Paso County also give a tax break, and how much?
About Meta El Paso data center campus in El Paso City - ❓ Has the Army signed a final lease with Carlyle?
About Fort Bliss Army data center (Carlyle) in El Paso City - ❓ Where will the power come from, and will new gas plants be built?
About Fort Bliss Army data center (Carlyle) in El Paso City - ❓ How will the Army make the site 'water neutral'?
About Fort Bliss Army data center (Carlyle) in El Paso City - 🗓️ When will the Army hold public meetings on the environmental review?
About Fort Bliss Army data center (Carlyle) in El Paso City - ❓ Will the data center pay any local property taxes?
About Fort Bliss Army data center (Carlyle) in El Paso City
Leon County
- ❓ Where exactly is the site and how many acres?
About Crusoe data center (Kahla Project, Leon County) in Unincorporated Leon County - ❓ Will Crusoe reapply for the tax break, and when is the vote?
About Crusoe data center (Kahla Project, Leon County) in Unincorporated Leon County - ❓ How will it get power and water?
About Crusoe data center (Kahla Project, Leon County) in Unincorporated Leon County
Matagorda County
- ❓ Is the site inside a city's limits?
About MARA computing campus (former HIF fuels site, Matagorda County) in Unincorporated Matagorda County - ❓ Will it include bitcoin mining, and how loud will it be?
About MARA computing campus (former HIF fuels site, Matagorda County) in Unincorporated Matagorda County - ❓ How much water will it use?
About MARA computing campus (former HIF fuels site, Matagorda County) in Unincorporated Matagorda County - ❓ Will Matagorda County give a tax break?
About MARA computing campus (former HIF fuels site, Matagorda County) in Unincorporated Matagorda County - ❓ What changed in MARA's Texas site deal in late September 2026, when it reportedly posted a $100 million deposit and reworked the deal?
About MARA computing campus (former HIF fuels site, Matagorda County) in Unincorporated Matagorda County
Dickens County
- ❓ How much water does the campus use?
About Galaxy Helios AI data center campus for CoreWeave (near Afton) in Unincorporated Dickens County - ❓ Did Dickens County give a tax break?
About Galaxy Helios AI data center campus for CoreWeave (near Afton) in Unincorporated Dickens County - ❓ How many permanent jobs are there?
About Galaxy Helios AI data center campus for CoreWeave (near Afton) in Unincorporated Dickens County
Hale County
- ❓ Is the site in Hale County or Lubbock County, and inside Abernathy city limits?
About Fluidstack Abernathy AI data center (formerly TeraWulf joint venture) in Abernathy City - ❓ Where does its power come from?
About Fluidstack Abernathy AI data center (formerly TeraWulf joint venture) in Abernathy City - ❓ How much water will it use?
About Fluidstack Abernathy AI data center (formerly TeraWulf joint venture) in Abernathy City - ❓ Were any local tax breaks given?
About Fluidstack Abernathy AI data center (formerly TeraWulf joint venture) in Abernathy City - ❓ How much water will the campus use each day?
About Aligned Data Centers Project Caprock (near Abernathy) in Unincorporated Hale County - ❓ Did Hale County or Abernathy give tax breaks?
About Aligned Data Centers Project Caprock (near Abernathy) in Unincorporated Hale County - ❓ Who is the tenant?
About Aligned Data Centers Project Caprock (near Abernathy) in Unincorporated Hale County - ❓ Will Abernathy annex the site?
About Aligned Data Centers Project Caprock (near Abernathy) in Unincorporated Hale County
Medina County
- ❓ Did Medina County approve the CyrusOne tax break, and on what terms?
About CyrusOne data center SAT14A (U.S. 90 West, near Castroville) in Unincorporated Medina County - ❓ Who is the tenant?
About CyrusOne data center SAT14A (U.S. 90 West, near Castroville) in Unincorporated Medina County - ❓ How much power and water will it use?
About CyrusOne data center SAT14A (U.S. 90 West, near Castroville) in Unincorporated Medina County - ❓ Which data center company will build here?
About Tract 'Medina Technology Park' (U.S. 90 W and CR 4516, near Castroville) in Unincorporated Medina County - ❓ How much water will it use?
About Tract 'Medina Technology Park' (U.S. 90 W and CR 4516, near Castroville) in Unincorporated Medina County - ❓ How much water will the campus use, and from which supplier?
About Microsoft data center campus SAT80-SAT82 (FM 471 and Potranco Road, near Castroville) in Unincorporated Medina County - ❓ How many diesel backup generators are on site?
About Microsoft data center campus SAT80-SAT82 (FM 471 and Potranco Road, near Castroville) in Unincorporated Medina County - ❓ How much power will the campus draw, and will new power lines be built?
About Microsoft data center campus SAT80-SAT82 (FM 471 and Potranco Road, near Castroville) in Unincorporated Medina County - ❓ Has construction started?
About Rowan 'Project Cinco' data center campus (west of Lytle) in Unincorporated Medina County - ❓ Has Lytle annexed the land?
About Rowan 'Project Cinco' data center campus (west of Lytle) in Unincorporated Medina County - ❓ How much power and water will it use?
About Rowan 'Project Cinco' data center campus (west of Lytle) in Unincorporated Medina County - ❓ Who is the tenant?
About Rowan 'Project Cinco' data center campus (west of Lytle) in Unincorporated Medina County - ❓ How much water and power will this campus use?
About Microsoft data center campus SAT89-SAT91 (U.S. 90 West, near Castroville) in Unincorporated Medina County - ❓ Did Medina County give a tax break for this site?
About Microsoft data center campus SAT89-SAT91 (U.S. 90 West, near Castroville) in Unincorporated Medina County
Haskell County
- ❓ Who will use this data center?
About Crusoe data center project (Haskell County) in Unincorporated Haskell County - ❓ How much power and water will it use?
About Crusoe data center project (Haskell County) in Unincorporated Haskell County - ❓ Where exactly in Haskell County is the land?
About Crusoe data center project (Haskell County) in Unincorporated Haskell County - ❓ When will building start?
About Crusoe data center project (Haskell County) in Unincorporated Haskell County - ❓ Is the south ('Thelma') campus in Haskell County, or in Lueders / Jones County as one state filing says?
About Google data center campuses (Haskell County) in Unincorporated Haskell County - ❓ Exactly where are the two sites, and are any inside a town?
About Google data center campuses (Haskell County) in Unincorporated Haskell County - ❓ How much water will they use?
About Google data center campuses (Haskell County) in Unincorporated Haskell County - ❓ Did Haskell County give Google a tax break?
About Google data center campuses (Haskell County) in Unincorporated Haskell County - ❓ How many megawatts will each campus use?
About Google data center campuses (Haskell County) in Unincorporated Haskell County
Victoria County
- ❓ One report places the port campus in Calhoun County; which county is the site in?
About Crusoe AI campus at the Port of Victoria (Blue Energy power) in Unincorporated Victoria County - ❓ Where exactly will the gas and nuclear power plant be built?
About Crusoe AI campus at the Port of Victoria (Blue Energy power) in Unincorporated Victoria County - ❓ How much water will the data center and power plant use?
About Crusoe AI campus at the Port of Victoria (Blue Energy power) in Unincorporated Victoria County - ❓ Will Victoria County approve tax breaks?
About Crusoe AI campus at the Port of Victoria (Blue Energy power) in Unincorporated Victoria County
Gray County
- ❓ Did Gray County or Pampa give tax breaks?
About Google Meitner Energy Center data center (near Pampa) in Unincorporated Gray County - ❓ How much gas power will be built on site?
About Google Meitner Energy Center data center (near Pampa) in Unincorporated Gray County - ❓ How many permanent jobs will there be?
About Google Meitner Energy Center data center (near Pampa) in Unincorporated Gray County - ❓ Is this project still moving, and has any building started?
About Pampa Energy Center data center park (APR Energy / Duos) in Pampa City - ❓ Is it connected to Google's Meitner Energy Center near Pampa?
About Pampa Energy Center data center park (APR Energy / Duos) in Pampa City - ❓ Has TCEQ issued an air permit for the gas turbines?
About Pampa Energy Center data center park (APR Energy / Duos) in Pampa City - ❓ What tax breaks did Pampa or Gray County give?
About Pampa Energy Center data center park (APR Energy / Duos) in Pampa City
Guadalupe County
- ❓ Is the site inside Marion city limits, and does it need city approval?
About Legacy Investing data center (1000 Bolton Road, Marion) in Marion City - ❓ Where will the power come from?
About Legacy Investing data center (1000 Bolton Road, Marion) in Marion City - ❓ How much water will it use?
About Legacy Investing data center (1000 Bolton Road, Marion) in Marion City - ❓ How much water will the campus use, and from which supplier?
About CloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels) in Unincorporated Guadalupe County - ❓ What air permit does the on-site gas generation need?
About CloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels) in Unincorporated Guadalupe County - ❓ Did Hays County also give a tax break?
About CloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels) in Unincorporated Guadalupe County - ❓ Who are the tenants?
About CloudBurst 1.2 GW data center campus (between San Marcos and New Braunfels) in Unincorporated Guadalupe County
Liberty County
- ❓ Is this really a data center project, and how big is it?
About LAMP data center and power hub (BaRupOn, near Raywood) in Unincorporated Liberty County - ❓ Has the company paid the county fines and gotten permits?
About LAMP data center and power hub (BaRupOn, near Raywood) in Unincorporated Liberty County - ❓ What kind of on-site power plant would it build, and would it need an air permit?
About LAMP data center and power hub (BaRupOn, near Raywood) in Unincorporated Liberty County
Wichita County
- ❓ Who was the data center developer?
About Airport Drive data center rezoning (Wichita Falls) in Wichita Falls City - ❓ Will they try another site in Wichita Falls?
About Airport Drive data center rezoning (Wichita Falls) in Wichita Falls City - ❓ How much water will it buy from the city?
About Texas Data Center Campus (Wichita Falls Business Park) in Wichita Falls City - ❓ How many megawatts will it use?
About Texas Data Center Campus (Wichita Falls Business Park) in Wichita Falls City - ❓ What was the sale price, and was a tax break given?
About Texas Data Center Campus (Wichita Falls Business Park) in Wichita Falls City - ❓ Will the city sell water to the data center, and how much?
About Calvano hyperscale data center (Northwest Freeway and City View Drive, Wichita Falls) in Wichita Falls City - ❓ When will building start?
About Calvano hyperscale data center (Northwest Freeway and City View Drive, Wichita Falls) in Wichita Falls City
Nolan County
- ❓ Is Sweetwater 1 in Nolan County or Fisher County?
About IREN Sweetwater 1 data center campus in Unincorporated Nolan County - ❓ How much water will it use?
About IREN Sweetwater 1 data center campus in Unincorporated Nolan County - ❓ Who will use the computing power here?
About IREN Sweetwater 1 data center campus in Unincorporated Nolan County - ❓ Were tax breaks given?
About IREN Sweetwater 1 data center campus in Unincorporated Nolan County - ❓ Where exactly is the site?
About Crusoe $7 billion data center (Nolan County, near Sweetwater) in Unincorporated Nolan County - ❓ What fuel will its power plant use, and has it applied for an air permit?
About Crusoe $7 billion data center (Nolan County, near Sweetwater) in Unincorporated Nolan County - ❓ How much water will it pump each day?
About Crusoe $7 billion data center (Nolan County, near Sweetwater) in Unincorporated Nolan County - ❓ Who will use the data center?
About Crusoe $7 billion data center (Nolan County, near Sweetwater) in Unincorporated Nolan County
Fisher County
- ❓ Where exactly is the site, and in which county?
About IREN Sweetwater 2 data center site in Unincorporated Fisher County - ❓ How much water will it use?
About IREN Sweetwater 2 data center site in Unincorporated Fisher County - ❓ Were tax breaks given?
About IREN Sweetwater 2 data center site in Unincorporated Fisher County
Briscoe County
- ❓ How much water will Dorothy 3 use?
About Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County) in Unincorporated Briscoe County - ❓ Who will use the AI campus?
About Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County) in Unincorporated Briscoe County - ❓ Did Briscoe County give a tax break?
About Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County) in Unincorporated Briscoe County - ❓ Did the Briscoe County Commissioners Court approve Reinvestment Zone #6 and tax breaks for Soluna on Nov. 9, 2026, and on what terms?
About Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County) in Unincorporated Briscoe County - ❓ The county notice describes a 403-acre zone about 5 miles south of Silverton along Highway 207 worth more than $8 billion. Is this the same land as Dorothy 3, or an addition to it?
About Soluna Project Dorothy 3 wind-powered AI campus (Briscoe County) in Unincorporated Briscoe County
Wilbarger County
- ❓ Is the site inside Vernon city limits or in the county?
About Google data center 'Project Rise' (Wilbarger County, near Vernon) in Unincorporated Wilbarger County - ❓ Did Wilbarger County or Vernon give a tax break?
About Google data center 'Project Rise' (Wilbarger County, near Vernon) in Unincorporated Wilbarger County - ❓ How many megawatts will it use?
About Google data center 'Project Rise' (Wilbarger County, near Vernon) in Unincorporated Wilbarger County
Grayson County
- ❓ How big would it be, and where exactly? Is it tied to the data center the county judge says is being built across the line in Fannin County?
About Black Mountain data center (near Bells) - ❓ Would it build its own power plant, and has an air permit been filed?
About Black Mountain data center (near Bells) - ❓ How much water would it use?
About Black Mountain data center (near Bells)
Fannin County
- ❓ Who is building it, and is it linked to Black Mountain's land deals near Bells?
About Data center on the Fannin-Grayson county line (near Savoy) - ❓ Is the Savoy gas power plant meant to power it?
About Data center on the Fannin-Grayson county line (near Savoy) - ❓ How big will it be and how much water will it use?
About Data center on the Fannin-Grayson county line (near Savoy)
Delta County
- ❓ Where is the site?
About Proposed Delta County data center - ❓ How much power and water would it use? Would it draw from Jim Chapman (Cooper) Lake?
About Proposed Delta County data center - ❓ Will there be a tax break request?
About Proposed Delta County data center
Hays County
- ❓ Will the developer refile after six months (about August 2026)?
About Highlander SM One data center (Francis Harris Lane, San Marcos) in San Marcos City - ❓ Will the developer try to build outside city control instead?
About Highlander SM One data center (Francis Harris Lane, San Marcos) in San Marcos City - 📄 Has a development agreement been signed or voted on?
About Sabey data center campus (Centerpoint Road, San Marcos) in San Marcos City - ❓ Is the land inside San Marcos city limits or its ETJ?
About Sabey data center campus (Centerpoint Road, San Marcos) in San Marcos City - ❓ How much power and water would it use?
About Sabey data center campus (Centerpoint Road, San Marcos) in San Marcos City
Wilson County
- ❓ How much water will it use? A resident group says up to 2 million gallons a day.
About Misae 'Mojo Ranch' AI data center and energy project (north of Stockdale) in Unincorporated Wilson County - ❓ What kind of power plant will be built, and what permits does it need?
About Misae 'Mojo Ranch' AI data center and energy project (north of Stockdale) in Unincorporated Wilson County - ❓ Is it in a city or the county?
About Misae 'Mojo Ranch' AI data center and energy project (north of Stockdale) in Unincorporated Wilson County - ❓ How much groundwater will the Misae project pump? The company website says up to 2 million gallons a day, but the local water district says no new permits were filed.
About Misae 'Mojo Ranch' AI data center and energy project (north of Stockdale) in Unincorporated Wilson County
Somervell County
- 📄 Was the development agreement and tax break finally approved?
About Amazon data center campus at Comanche Peak nuclear plant (Somervell County) in Unincorporated Somervell County - ❓ How much water will it use, and from the nuclear plant's lake?
About Amazon data center campus at Comanche Peak nuclear plant (Somervell County) in Unincorporated Somervell County - ❓ Will it take power directly from the nuclear plant?
About Amazon data center campus at Comanche Peak nuclear plant (Somervell County) in Unincorporated Somervell County
McCulloch County
- ❓ Exactly where is the site?
About Cipher 'Mikeska' data center site (McCulloch County) in Unincorporated McCulloch County - ❓ Will it be for bitcoin mining or AI?
About Cipher 'Mikeska' data center site (McCulloch County) in Unincorporated McCulloch County - ❓ Where will the power and water come from?
About Cipher 'Mikeska' data center site (McCulloch County) in Unincorporated McCulloch County
La Salle County
- ❓ Will it be used for bitcoin mining or AI?
About Cipher 'Reveille' data center site (Cotulla area) in Unincorporated La Salle County - ❓ Is it inside Cotulla city limits?
About Cipher 'Reveille' data center site (Cotulla area) in Unincorporated La Salle County
Jefferson County
- ❓ Who is the developer?
About Port Arthur AI data center (planned near Entergy Legend plant) in Port Arthur City - ❓ Where exactly will it be built?
About Port Arthur AI data center (planned near Entergy Legend plant) in Port Arthur City - ❓ How much water will it use?
About Port Arthur AI data center (planned near Entergy Legend plant) in Port Arthur City
Washington County
- ❓ Has building started?
About Viridien computing center (Longwood Drive, Brenham) in Brenham City - ❓ How much water will it use?
About Viridien computing center (Longwood Drive, Brenham) in Brenham City
Freestone County
- ❓ Is the site inside Fairfield city limits or unincorporated Freestone County?
About CyrusOne campus at Freestone Energy Center (near Fairfield) in Unincorporated Freestone County - ❓ How much water will it use?
About CyrusOne campus at Freestone Energy Center (near Fairfield) in Unincorporated Freestone County - ❓ Did Freestone County give a tax break?
About CyrusOne campus at Freestone Energy Center (near Fairfield) in Unincorporated Freestone County - ❓ Who is the tenant?
About CyrusOne campus at Freestone Energy Center (near Fairfield) in Unincorporated Freestone County
Howard County
- ❓ When will construction start?
About QTS Howard County data center campus (Big Spring area) in Unincorporated Howard County - ❓ How many megawatts will it use, and who supplies the power?
About QTS Howard County data center campus (Big Spring area) in Unincorporated Howard County - ❓ Did Howard County or Big Spring give a tax break?
About QTS Howard County data center campus (Big Spring area) in Unincorporated Howard County - ❓ Is the site inside Big Spring city limits?
About QTS Howard County data center campus (Big Spring area) in Unincorporated Howard County
Bosque County
- ❓ How much water will it use, and from Lake Whitney or elsewhere?
About CyrusOne data center at Calpine's Thad Hill Energy Center (Bosque County) in Unincorporated Bosque County - ❓ Did Bosque County give a tax break?
About CyrusOne data center at Calpine's Thad Hill Energy Center (Bosque County) in Unincorporated Bosque County - ❓ Who is the tenant?
About CyrusOne data center at Calpine's Thad Hill Energy Center (Bosque County) in Unincorporated Bosque County
Austin County
- ❓ Which town is the site near, and is it in city limits?
About CleanSpark AI data center campus (Austin County) - ❓ Will it make its own power with gas on site?
About CleanSpark AI data center campus (Austin County) - ❓ How much water will it use?
About CleanSpark AI data center campus (Austin County)
Midland County
- ❓ Where exactly is the site, and is it inside any city?
About FO Permian Partners off-grid data center site (Midland) in Unincorporated Midland County - ❓ What fuel will the power plant burn, and does it have an air permit?
About FO Permian Partners off-grid data center site (Midland) in Unincorporated Midland County - ❓ Has any tenant signed?
About FO Permian Partners off-grid data center site (Midland) in Unincorporated Midland County
Webb County
- ❓ Exactly where is the land, and has any construction started?
About Energy Abundance 'Data City' (near Laredo) in Unincorporated Webb County - ❓ How much water will it use in a dry region?
About Energy Abundance 'Data City' (near Laredo) in Unincorporated Webb County - ❓ Has Webb County given any tax break?
About Energy Abundance 'Data City' (near Laredo) in Unincorporated Webb County
🦺 Stay safe: only take photos from public roads. Never go onto private land.