Send us a tip
Being builtBig (AI-size): 780 megawatts

Amazon (AWS) data center campus near Boling

Also called: Project Eagle

Amazon is building a $10 billion data center campus on nearly 3,000 acres near Boling in Wharton County. Plans show 13 buildings that together could use about 780 megawatts. Neighbors worry about their wells, generator pollution and power bills.

👥 Reported, not confirmed yetSourceLast checked: Oct 2026

What happens next?

🗓️ No meeting or deadline known yet.

Zoning here is usually decided by the Wharton County Commissioners Court (for land outside city and town limits).

Where things stand: Being built Construction under way; groundwater permits approved Sept. 8, 2026.

❓ 5 open questions about it: see below.

Last checked Oct 8, 2026.

🕒 Latest update (Sept 8, 2026): Coastal Bend Groundwater Conservation District approved permits for three more wells.

What we know

  • 📍 WhereEaglewood Road, Boling (state filings), Unincorporated Wharton County, Wharton County
  • 🏢 CompanyAmazon Data Services
  • 🏛️ Owned byAmazon
  • 👤 Built forAmazon Web Services
  • 🌳 Size3,000 acres
  • ⚡ Power it needs780 megawatts (about as much as 624,000 homes)
  • 🔌 Where the power comes fromCenterPoint serves the site. Amazon says 13 buildings could use about 60 MW each (about 780 MW). Backup generators planned.
  • 💧 WaterGroundwater wells for offices, construction and fire safety (Coastal Bend Groundwater Conservation District). About 500 acre-feet a year of surface water may be sought from the LCRA later.
  • ❄️ CoolingAir cooling at first; may use surface water on the hottest days later.
  • 💵 Cost$10 billion
  • 👷 Jobs promised300

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • How much power will it use in total? Amazon has not confirmed. 🙋 I'll find out ·
  • Will Amazon apply for surface water from the LCRA, and how much? 🙋 I'll find out ·
  • How many diesel backup generators will there be? 🙋 I'll find out ·
  • Did Wharton County give a tax break? 🙋 I'll find out ·
  • Where exactly is the site? A parcel number, address or agenda link helps. 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 7, 2026: We checked the site location: approximate location found.
    • Oct 8, 2026: We checked the site location: the old pin was on the center of Boling, so we removed it. State filings give Eaglewood Road, which no map has yet.

    What happened so far

    • May 2026
      Groundwater district approved permits for two wells.
    • July 30, 2026
      Judge recommended approval of more well permits, saying they would not hurt neighbors' wells.
    • Sept 8, 2026
      Coastal Bend Groundwater Conservation District approved permits for three more wells.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. Amazon data center in Wharton County clears water hurdle · Houston Chronicle · Oct 2, 2026
    2. TDLR TABS TABS2026023825: PROJECT EAGLE - BUILDING A (Amazon Data Services), 244 Eaglewood Rd, Boling · Texas Department of Licensing and Regulation · Oct 7, 2026
    3. AWS files for $12bn data center campus outside Houston, Texas · DatacenterDynamics · Oct 7, 2026
    4. OpenStreetMap search: FM 1301 at FM 442 · OpenStreetMap contributors · Oct 7, 2026

    See something wrong? Tell us and we'll fix it.