Being builtBig (AI-size): 220 megawatts
STACK Infrastructure DFW02 campus (Lancaster)
Also called: STACK Dallas South
STACK is building six data center buildings (about 36 MW each, 220 MW in all) on about 102 acres off East Belt Line Road near Lancaster Airport. A trade listing says it is under construction.
What happens next?
🗓️ No meeting or deadline known yet.
Zoning here is usually decided by the City Council of Lancaster City.
Where things stand: Being built Listed as under construction, planned for 2027.
❓ 3 open questions about it: see below.
Last checked Oct 6, 2026.
What we know
- 📍 WhereE. Belt Line Road, Lancaster, Dallas County
- 🏢 CompanySTACK Infrastructure
- 🏛️ Owned byIPI Partners
- 🌳 Size102 acres
- ⚡ Power it needs220 megawatts (about as much as 176,000 homes)
- 🔌 Where the power comes fromOwn Oncor substation.
❓ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- How much power will it use? 🙋 I'll find out ·
- When will each building open? 🙋 I'll find out ·
- Did it get a tax break? 🙋 I'll find out ·
🛰️ See it from above
Drag the slider to compare the land before and now.
20182025
We only know the town, so this shows the town center, not the exact site. Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.
Where this comes from
- Stack: DFW02 Campus · Baxtel
- Stack plans 220MW data center campus in Dallas, Texas · DatacenterDynamics
See something wrong? Tell us and we'll fix it.