Proposed
CloudHQ SAT data center campus (Texas Research Park)
Also called: CloudHQ SAT1-SAT5
CloudHQ, a data center company from Washington, D.C., bought about 123 acres at the Texas Research Park west of San Antonio in 2023. It plans five data center buildings with up to 600 megawatts in all, with its own power substations on site.
Where things stand: Land bought in 2023; company plans 5 buildings, the first around 2027.
๐ Latest update (May 2023): University of Texas System sold about 123.4 acres at Texas Research Park to CloudHQ; site plans showed four or five data centers.
What we know
- ๐ WhereTexas Research Park, west of Loop 1604 (outside San Antonio city limits), Unincorporated Bexar County, Bexar County
- ๐ข CompanyCloudHQ
- ๐ณ Size123 acres
- โก Power it needs600 megawatts (about as much as 480,000 homes)
- ๐ Where the power comes fromGrid power (CPS Energy area) through planned on-site substations.
โ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- When will construction of the first building start? ๐ I'll find out
- Who is the tenant? ๐ I'll find out
- How much water will the campus use, and from which supplier? ๐ I'll find out
- How many diesel generators are planned? ๐ I'll find out
What happened so far
- May 2023University of Texas System sold about 123.4 acres at Texas Research Park to CloudHQ; site plans showed four or five data centers.
๐ฐ๏ธ See it from above
An aerial photo of the area.
Photos: USGS The National Map.
Where this comes from
- Denver data center company buys 89 acres on far West Side ยท San Antonio Report ยท Aug 31, 2023
- CloudHQ SAT Campus ยท CloudHQ (company) ยท 2026
- Texas data centers map and list ยท Cleanview (tracker) ยท Oct 2026
See something wrong? Tell us and we'll fix it.