Being built
Serverfarm Houston campuses expansion (Betka Road, Hockley and Cutten Road)
Serverfarm bought two old HP data center sites in the Houston area and is adding a big new building at each. The two sites total 250 acres and more than 500 megawatts.
Where things stand: Two new buildings filed, each set to run July 2025 to July 2026.
๐ Latest update (July 2025): Construction of two new buildings (565,000 and 438,000 sq ft, $137 million each) was set to begin.
What we know
- ๐ Where4801 Betka Road, Hockley (next to HOU1 at 28401 Betka Road) and 15555 Cutten Road, Houston, unknown, Harris County
- ๐ข CompanyServerfarm
- ๐๏ธ Owned byManulife
- ๐ณ Size250 acres
- โก Power it needs500 megawatts (about as much as 400,000 homes)
โ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- Which sites are inside Houston city limits? ๐ I'll find out
- Who are the tenants? ๐ I'll find out
- How much water do they use? ๐ I'll find out
What happened so far
- July 2025Construction of two new buildings (565,000 and 438,000 sq ft, $137 million each) was set to begin.
๐ฐ๏ธ See it from above
An aerial photo of the area.
Photos: USGS The National Map.
Where this comes from
- Serverfarm files to build two more data centers in Houston, Texas ยท DatacenterDynamics ยท 2025