Send us a tip
Being builtBig (AI-size): 1,200 megawatts

OpenAI Stargate data center (Milam County, near Burlington)

Also called: Stargate Milam County

SB Energy is building a 1.2-gigawatt AI data center for OpenAI's 'Stargate' project in rural Milam County, near Burlington. SB Energy, a SoftBank company, mostly builds solar and battery projects.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

🗓️ No meeting or deadline known yet.

Zoning here is usually decided by the Milam County Commissioners Court (for land outside city and town limits).

Where things stand: Being built Construction was under way near Burlington by May 2026.

❓ 5 open questions about it: see below.

Last checked Oct 26, 2026.

🕒 Latest update (Oct 22, 2026): By Oct. 22, the state had suspended at least 17 data center permits issued after the governor's pause. Reports did not list which sites were suspended.

What we know

  • 📍 WhereCounty Road 134 near Burlington, Unincorporated Milam County, Milam County
  • 🏢 CompanySB Energy
  • 🏛️ Owned bySoftBank
  • 👤 Built forOpenAI
  • ⚡ Power it needs1,200 megawatts (about as much as 960,000 homes)
  • 🔌 Where the power comes fromSB Energy will supply the power setup; the company mainly builds solar farms and batteries.

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • How many acres and buildings? 🙋 I'll find out ·
  • How much water will it use and from where? 🙋 I'll find out ·
  • Did Milam County give a tax break? 🙋 I'll find out ·
  • Will new high-voltage power lines be built? 🙋 I'll find out ·
  • Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 7, 2026: We checked the site location: approximate location found.

    What happened so far

    • May 4, 2026
      Photo showed construction under way near Burlington.
    • Oct 2, 2026
      TCEQ issued a construction stormwater permit for 'Milam Data Center Building 1' at US-77 and FM 134 near Burlington. This allows land clearing and grading.
    • Oct 22, 2026
      By Oct. 22, the state had suspended at least 17 data center permits issued after the governor's pause. Reports did not list which sites were suspended.
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas · DatacenterDynamics
    2. SB Energy to Build OpenAI Stargate Data Center in Texas · SB Energy
    3. Texas county pauses data center construction in rural areas for a year · San Antonio Current (Texas Tribune) · May 13, 2026
    4. Texas StratMap address point: 2895 COUNTY ROAD 134 (Milam County) · Texas Geographic Information Office (TxGIO) · Oct 7, 2026
    5. Stargate Milam County · Data Center Map · Oct 7, 2026
    6. Summary: Data Center Permits Issued by TCEQ After 9/21/2026 · Public Citizen (summary of TCEQ records) · Oct 19, 2026
    7. Texas Suspends Data Center Permits Following Watchdog Report · Industry Insider Texas (GovTech) · Oct 23, 2026

    See something wrong? Tell us and we'll fix it.