Being builtBig (AI-size): 1,500 megawatts

Core Scientific Pecos AI data center expansion

Also called: Cottonwood

Core Scientific runs a 300-megawatt bitcoin mine near Pecos and is turning it into a much bigger AI data center campus. It plans to reach 1.5 gigawatts, partly with its own power plant.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

🗓️ No meeting or deadline known yet.

Zoning here is usually decided by the Reeves County Commissioners Court (for land outside city and town limits).

Where things stand: Being built A 300-megawatt bitcoin mine is being turned into an AI data center campus. First new data hall footings were done by April 2026; first AI space due early 2027.

❓ 3 open questions about it: see below.

Last checked Oct 7, 2026.

🕒 Latest update (April 27, 2026): Core Scientific said it will grow its Pecos campus to 1.5 gigawatts for AI, with first space in early 2027.

What we know

  • 📍 WhereCore Scientific's existing campus outside the city of Pecos, Unincorporated Reeves County, Reeves County
  • 🏢 CompanyCore Scientific, Inc.
  • 👤 Built forunknown (site offered for lease)
  • 🌳 Size200 acres
  • ⚡ Power it needs1,500 megawatts (about as much as 1,200,000 homes)
  • 🔌 Where the power comes from300 megawatts more from the utility, plus power made on site

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • What kind of on-site power plant will be built, and does it need an air permit? 🙋 I'll find out ·
  • Who will lease the AI space? 🙋 I'll find out ·
  • How much water will the expanded campus use? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 7, 2026: We checked the site location: approximate location found.

    What happened so far

    • April 27, 2026
      Core Scientific said it will grow its Pecos campus to 1.5 gigawatts for AI, with first space in early 2027.
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus · Core Scientific · April 27, 2026
    2. Core Scientific expands its Pecos campus for AI data centers · W.Media · April 2026