Send us a tip
Built & runningBig (AI-size): 1,200 megawatts

Stargate AI data center campus (Lancium Clean Campus, Abilene)

Also called: Stargate Abilene, Lancium Clean Campus, Crusoe Abilene

Crusoe built 8 large AI data center buildings on the Lancium campus on the north side of Abilene for Oracle, which runs them for OpenAI's 'Stargate' project. The campus is planned for about 1.2 gigawatts of power. The first buildings started running in 2025, and the city gave the project a large property tax break.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

Where things stand: Built & running First buildings are running for Oracle and OpenAI; the last of 8 buildings were still being finished in 2026.

❓ 5 open questions about it: see below.

📣 Report noise, water or power bill changes

Last checked Oct 26, 2026.

🕒 Latest update (Oct 22, 2026): By Oct. 22, the state had suspended at least 17 data center permits issued after the pause. Reports did not list which sites were suspended.

What we know

  • 📍 Where5502 Spinks Road, Abilene (Lancium Clean Campus), Abilene, Taylor County
  • 🏢 CompanyCrusoe (on land owned by Lancium)
  • 👤 Built forOracle for OpenAI
  • 🌳 Size800 acres
  • ⚡ Power it needs1,200 megawatts (about as much as 960,000 homes)
  • 🔌 Where the power comes fromConnected to the power grid through on-site substations; also has on-site natural gas turbines, batteries and solar, and nearby wind power.
  • ❄️ CoolingClosed-loop, direct-to-chip liquid cooling with air-cooled chillers; company says no water is evaporated in normal use
  • 💸 Tax breaksAbilene City Council approved an 85% break on taxes for new buildings and equipment for 10 years per site (with a second 10-year break possible per site).
  • 👷 Jobs promised100

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • How much water does the campus use each day, and from which supplier? 🙋 I'll find out ·
  • How many gas turbines and diesel generators run on site, and how much do they emit? 🙋 I'll find out ·
  • Did any city official sign an agreement to keep the plans private (NDA)? 🙋 I'll find out ·
  • Are the new Buildings 9 and 10 at 5502 Spinks Road part of Crusoe's Microsoft expansion or more buildings for the first campus? 🙋 I'll find out ·
  • Was this site's state stormwater permit one of the at least 17 data center permits the state (TCEQ) suspended in October 2026? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 8, 2026: We checked the site location: exact site found in state records or maps.

    What happened so far

    • May 2024
      Land clearing began on the site.
    • Nov 22, 2024
      Crusoe and Lancium announced a $3.4 billion, 998,000-square-foot first phase near Spinks Road.
    • Feb 2025
      Abilene City Council approved property tax breaks for the Lancium campus sites.
    • March 2025
      Crusoe said the campus will grow to 8 buildings and about 1.2 gigawatts.
    • Aug 28, 2025
      City Council held a public hearing on amended tax break deals covering eight building sites.
    • Sept 2025
      First building began operating.
    • May 2026
      Buildings 3 and 4 began operating.
    • Sept 23, 2026
      TCEQ issued a construction stormwater permit for 'Abilene Data Center Buildings 9 & 10' at 5502 Spinks Road, two days after the governor's pause on data center permits.
    • Oct 22, 2026
      By Oct. 22, the state had suspended at least 17 data center permits issued after the pause. Reports did not list which sites were suspended.

    Local votes and rules

    🤝 Agreement with the company

    Abilene City Council approved an 85% property tax break for the Stargate data center campus built by Crusoe on land owned by Lancium, with Oracle as the main tenant. To qualify, Crusoe must spend at least $2.4 billion of a planned $3.5 billion and create 357 full-time jobs paying at least $57,600.

    Feb 2025
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. OpenAI Stargate Abilene (data center directory) · Epoch AI · July 28, 2026
    2. Crusoe expands AI data center campus in Abilene to 1.2 gigawatts · Crusoe (company) · March 2025
    3. City Council agenda: amended Lancium tax abatement agreements · City of Abilene · Aug 2025
    4. New development at Lancium expected to bring major investment, jobs to Abilene · Abilene Reporter-News (via AOL) · Nov 22, 2024
    5. Roundtable: The opportunities & challenges of Abilene's new AI data campus · Abilene Reporter-News (via Yahoo News) · Feb 2025
    6. Texas data centers map and list · Cleanview (tracker) · Oct 2026
    7. Epoch AI Frontier Data Centers dataset (CC BY 4.0) · Epoch AI · Oct 8, 2026
    8. StratMap address point 5502 SPINKS RD, Taylor County · Texas Geographic Information Office (StratMap address points) · Oct 8, 2026
    9. Summary: Data Center Permits Issued by TCEQ After 9/21/2026 · Public Citizen (summary of TCEQ records) · Oct 19, 2026
    10. Texas continued permitting data centers after Abbott's pause, report finds · Inside Climate News via KUT · Oct 20, 2026
    11. Texas Suspends Data Center Permits Following Watchdog Report · Industry Insider Texas (GovTech) · Oct 23, 2026

    See something wrong? Tell us and we'll fix it.