Crusoe and Lancium 1-gigawatt AI campus (Childress)
Crusoe and Lancium, the team behind the Stargate site in Abilene, plan a 1-gigawatt AI campus on 270 acres at Childress. They say it will use the power grid plus batteries and create more than 100 permanent jobs.
What happens next?
🗓️ No meeting or deadline known yet.
Zoning here is usually decided by the Childress County Commissioners Court (for land outside city and town limits).
Where things stand: Proposed Announced July 15, 2026. Construction was set to begin in the third quarter of 2026.
❓ 5 open questions about it: see below.
Last checked Oct 19, 2026.
🕒 Latest update (Sept 11, 2026): State building-access filings (TDLR) were registered for 'Project Hyper - Childress' at 525 County Road 23: at least two single-story data center buildings of about 806,000 sq ft, each listed at $2.4 billion, owned by Childress DC1, LLC and Childress DC3, LLC. Trade press reports these are Crusoe's filings.
What we know
- 📍 Where270 acres owned by Lancium at Childress (exact site not confirmed in sources we opened), Unincorporated Childress County, Childress County
- 🏢 CompanyCrusoe (builds and runs) and Lancium (land and power)
- 👤 Built forAn unnamed large tech company ('hyperscaler')
- 🌳 Size270 acres
- ⚡ Power it needs1,000 megawatts (about as much as 800,000 homes)
- 🔌 Where the power comes fromTexas power grid, plus batteries on site
- ❄️ CoolingClosed-loop liquid cooling that does not evaporate water
- 👷 Jobs promised100
❓ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- Has construction started? 🙋 I'll find out ·
- Who is the tech company that will use it? 🙋 I'll find out ·
- Did Childress County give a tax break? 🙋 I'll find out ·
- Will new power lines be needed? 🙋 I'll find out ·
- Are the 'Project Hyper - Childress' state filings (Childress DC1 and DC3 LLC) the same campus Crusoe and Lancium announced? The filings do not name Crusoe. 🙋 I'll find out ·
🔎 What we checked
- Sept 11, 2026: We checked the state filings: a third building, 'Project Hyper - Childress, Childress Building 2' (TABS2027000830), is also registered at 525 B County Road 23, owned by Childress DC2 LLC: about 806,359 sq ft, $2.4 billion, planned Sept. 2026 to April 2028.
What happened so far
- July 15, 2026Crusoe and Lancium announced a 1-gigawatt AI data center campus on 270 acres in Childress for an unnamed big tech company.
- Sept 11, 2026State building-access filings (TDLR) were registered for 'Project Hyper - Childress' at 525 County Road 23: at least two single-story data center buildings of about 806,000 sq ft, each listed at $2.4 billion, owned by Childress DC1, LLC and Childress DC3, LLC. Trade press reports these are Crusoe's filings.
Drag the slider to compare the land before and now.
Where this comes from
- Crusoe and Lancium announce 1 gigawatt AI data center campus in Childress, Texas · Crusoe · July 15, 2026
- Crusoe, Lancium To Build 1GW AI Data Center in Texas · Bloomberg Tax · July 2026
- TABS2027000824 Project Hyper - Childress (Childress Building 1) · Texas Department of Licensing and Regulation · Sept 11, 2026
- TABS2027000835 Project Hyper - Childress · Texas Department of Licensing and Regulation · Sept 11, 2026
- Crusoe Plans $4.8bn Data Center Campus in Jayton, Texas · Baxtel · Oct 2, 2026
- TDLR TABS TABS2027000830: Project Hyper - Childress, Childress Building 2 (Childress DC2, LLC) · Texas Department of Licensing and Regulation · Sept 11, 2026
See something wrong? Tell us and we'll fix it.