Being built

Crusoe 900 MW AI campus for Microsoft (Abilene)

Also called: Abilene Building 9, Abilene DC9

Crusoe is building a second AI campus next to the Stargate site in Abilene, this time for Microsoft. It will have two very large buildings and its own 900-megawatt power plant on site. Crusoe says this brings the whole Abilene site to about 2.1 gigawatts.

โœ” ConfirmedSourceLast checked: Oct 6, 2026

Where things stand: Site clearing started in 2026; first building expected online around mid-2027.

๐Ÿ•’ Latest update (March 27, 2026): Crusoe announced a 900-megawatt expansion in Abilene for Microsoft, with its own on-site power plant.

What we know

  • ๐Ÿ“ WhereSouth side of the existing Lancium/Stargate site, north Abilene, Abilene, Taylor County
  • ๐Ÿข CompanyCrusoe
  • ๐Ÿ‘ค Built forMicrosoft
  • โšก Power it needs900 megawatts (about as much as 720,000 homes)
  • ๐Ÿ”Œ Where the power comes fromA new 900-megawatt power plant built on site (fuel not stated by the company; news reports guess natural gas).

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • March 27, 2026
    Crusoe announced a 900-megawatt expansion in Abilene for Microsoft, with its own on-site power plant.

Local votes and rules

๐Ÿค Agreement with the company

Abilene City Council approved an 85% property tax break for the Stargate data center campus built by Crusoe on land owned by Lancium, with Oracle as the main tenant. To qualify, Crusoe must spend at least $2.4 billion of a planned $3.5 billion and create 357 full-time jobs paying at least $57,600.

Feb 2025
๐Ÿ›ฐ๏ธ See it from above

Drag the slider to compare the land before and now.

RecentRecent
Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure ยท Crusoe (company) ยท March 27, 2026
  2. Microsoft takes up residence next to OpenAI, Oracle at Crusoe's 900 MW Texas datacenter expansion ยท The Register ยท March 27, 2026
  3. Texas data centers map and list ยท Cleanview (tracker) ยท Oct 2026

See something wrong? Tell us and we'll fix it.