Data centers in Virginia

108 projects we know about, across 41 counties. Pick your county below, or type your ZIP on the home page.

Built & runningBeing builtApproved, not built yetProposedStopped or cancelled

All projects

Newest activity first. Click one to see the details.

Proposed

Amazon Bridgefield Tech Center (former GW Virginia campus, Ashburn)

Loudoun County, Loudoun County

122 acres Β· for Amazon Web Services

πŸ•’ July 28, 2026: Amazon filed a first plan for four data center buildings (805,092 square feet).

Proposed

B.F. Saul data centers on Shaw Road (Sterling)

Loudoun County, Loudoun County

37.24 acres

πŸ•’ Sept 2026: Loudoun Planning Commission voted against the rezoning.

Proposed

Cochran Tech data center (Cochran Mill Road, near Leesburg)

Loudoun County, Loudoun County

πŸ•’ May 5, 2026: Board voted 6-1-1 to reconsider and send the plan back to the Planning Commission.

Proposed

Prologis Concorde Industrial Park data center conversion (Sterling)

Loudoun County, Loudoun County

17 acres

πŸ•’ Feb 11, 2026: Board of Supervisors held its review of the rezoning.

Approved, not built yet

Cross Mill Center data center (near Leesburg Executive Airport)

Loudoun County, Loudoun County

22 acres

πŸ•’ July 15, 2025: Board of Supervisors approved the rezoning 5-4.

Approved, not built yet

Greenlin Park data center campus (Dulles Greenway, south of Leesburg)

Loudoun County, Loudoun County

83 acres

πŸ•’ Feb 19, 2025: Board of Supervisors approved the rezoning.

Proposed

Leesburg Gateway data center plan (Peterson Companies)

Leesburg, Loudoun County

107 acres

πŸ•’ Jan 26, 2026: Town Council cancelled its public hearing at the developer's request.

Proposed

Quantum Park data centers (Ashburn)

Loudoun County, Loudoun County

40 acres

πŸ•’ April 15, 2026: Supervisors moved the plan to a May 19 vote; several said they would vote no.

Approved, not built yet

Belmont Innovation Campus (Belmont Ridge Road)

Loudoun County, Loudoun County

112 acres

πŸ•’ April 10, 2024: Board approved a 1.3 million-square-foot version, 6-3.

Proposed

Active Infrastructure campus on Evergreen Mills Road

Loudoun County, Loudoun County

325 acres

πŸ•’ July 23, 2026: Planning Commission held a hearing and voted against the rezoning.

Stopped or cancelled

Oaklawn data center (Land Bay A, Leesburg)

Leesburg, Loudoun County

26.4 acres

πŸ•’ July 2025: Developer sued the town over the denial.

Proposed

STACK Infrastructure 144 MW Loudoun campus

Loudoun County, Loudoun County

πŸ•’ Feb 11, 2025: STACK announced the 144 MW campus.

Reported in the news, not confirmed yet

Being built

EdgeCore AS01 and AS02 data centers (Sterling)

Loudoun County, Loudoun County

πŸ•’ April 2026: EdgeCore secured $1.5 billion in loans to build AS01 and AS02.

Reported in the news, not confirmed yet

Stopped or cancelled

Prince William Digital Gateway (Pageland Lane)

Prince William County, Prince William County

2,100 acres

πŸ•’ April 30, 2026: QTS appealed to the Virginia Supreme Court.

Stopped or cancelled

Dulles South Innovation Center (Sanders Lane)

Prince William County, Prince William County

2,000 acres

πŸ•’ July 7, 2026: Board of County Supervisors voted 8-0 to deny the comprehensive plan change.

Approved, not built yet

Devlin Technology Park (Bristow)

Prince William County, Prince William County

270 acres Β· for Amazon Web Services

πŸ•’ Nov 2025: Amazon Data Services bought most of the site for about $700 million.

Approved, not built yet

Data center on Prince William Parkway near Hornbaker Road

Prince William County, Prince William County

40 acres

πŸ•’ March 3, 2026: Board of County Supervisors approved the project 4-3.

Proposed

Project Industry data center (Wellington Road, Brentsville District)

Prince William County, Prince William County

42 acres

πŸ•’ Sept 1, 2026: Board of County Supervisors deferred its vote.

Proposed

Yondr and Cerberus 72 MW campus (Manassas area)

Prince William County, Prince William County

40 acres

πŸ•’ Aug 3, 2026: Yondr and Cerberus announced they bought the 40-acre site.

Reported in the news, not confirmed yet

Approved, not built yet

LHR Gainesville data center campus (Linton Hall Road, Bristow)

Prince William County, Prince William County

196 acres

πŸ•’ Oct 2025: Army Corps of Engineers took public comments on a wetlands permit.

Reported in the news, not confirmed yet

Being built

NTT Grove at Gainesville campus (I-66 and U.S. 29)

Prince William County, Prince William County

πŸ•’ July 2024: First building was rising along I-66.

Reported in the news, not confirmed yet

Stopped or cancelled

STACK Bristow Campus (Linton Hall and Nokesville roads)

Prince William County, Prince William County

58 acres

πŸ•’ Sept 9, 2025: Board of County Supervisors denied the Bristow Campus 4-2.

Being built

Microsoft data center on Hansen Farm Road

Prince William County, Prince William County

for Microsoft

πŸ•’ May 2024: Construction began.

Reported in the news, not confirmed yet

Being built

Microsoft data center on Jacksonville Avenue

Prince William County, Prince William County

for Microsoft

πŸ•’ Jan 2024: Site preparation began.

Reported in the news, not confirmed yet

Proposed

Amazon Mattameade data center campus (I-95 and Mudd Tavern Road)

Caroline County, Caroline County

1,143 acres Β· for Amazon Web Services

πŸ•’ Feb 2025: Amazon sent a joint wetlands permit application to the U.S. Army Corps of Engineers.

Reported in the news, not confirmed yet

Proposed

Ladysmith Data Hub (18577 Green Road)

Caroline County, Caroline County

140.3 acres

πŸ•’ July 24, 2025: Planning Commission voted 4-2 to recommend denial of the special exception permit.

Reported in the news, not confirmed yet

Being built

CleanArc VA1 data center campus (former Virginia Bazaar site)

Caroline County, Caroline County

πŸ•’ Nov 20, 2025: Groundbreaking with Gov. Glenn Youngkin.

Proposed

STACK / Silver Companies campus, Celebrate Virginia South

Fredericksburg, Fredericksburg city

250 acres

πŸ•’ Feb 25, 2025: City Council advanced the Technology Overlay District on first reading.

Reported in the news, not confirmed yet

Stopped or cancelled

1500 Gateway data center (Plank Road / Cowan Boulevard)

Fredericksburg, Fredericksburg city

84 acres

πŸ•’ Aug 25, 2026: City Council denied the rezoning and height permit 7-0.

Reported in the news, not confirmed yet

Approved, not built yet

King George Technology Center (Green Energy Ventures)

King George County, King George County

300 acres

πŸ•’ Feb 17, 2026: Board of Supervisors approved the rezoning 3-2 and a height permit.

Reported in the news, not confirmed yet

Approved, not built yet

Dahlgren West data center campus (Oasis Digital Properties)

King George County, King George County

485 acres

πŸ•’ Aug 2025: Board of Supervisors approved the campus unanimously.

Reported in the news, not confirmed yet

Proposed

AWS Crossroads Technology Campus (Lee Hill District)

Spotsylvania County, Spotsylvania County

555 acres Β· for Amazon Web Services

πŸ•’ Sept 16, 2026: Planning Commission voted 4-2 to recommend approval.

Reported in the news, not confirmed yet

Approved, not built yet

Hunters Ridge South data center campus (Cosner Drive)

Spotsylvania County, Spotsylvania County

πŸ•’ Aug 26, 2025: Board of Supervisors approved the rezoning 5-2.

Reported in the news, not confirmed yet

Being built

PowerHouse 95 data center campus

Spotsylvania County, Spotsylvania County

145 acres

πŸ•’ Jan 2025: PowerHouse completed the purchase of 145 acres.

Reported in the news, not confirmed yet

Proposed

Amazon's four Spotsylvania rezonings (about 2,000 acres)

Spotsylvania County, Spotsylvania County

2,000 acres Β· for Amazon Web Services

πŸ•’ June 2023: Amazon filed rezoning applications for nearly 2,000 acres.

Reported in the news, not confirmed yet

Being built

STACK Stafford Technology Campus (U.S. 1 at I-95)

Stafford County, Stafford County

500 acres

πŸ•’ May 2026: First building topped out.

Proposed

Vantage VA4 data center campus

Stafford County, Stafford County

82 acres

πŸ•’ Nov 6, 2025: Vantage announced the VA4 campus.

Reported in the news, not confirmed yet

Proposed

Cranes Corner data center (U.S. 1 near Centreport Parkway)

Stafford County, Stafford County

46 acres

πŸ•’ Aug 2025: Planning Commission voted unanimously to recommend approval.

Reported in the news, not confirmed yet

Being built

Amazon Potomac Church Tech Center

Stafford County, Stafford County

for Amazon Web Services

πŸ•’ Aug 18, 2026: Board of Supervisors approved a proffer change 4-2.

Reported in the news, not confirmed yet

Being built

Google Project Peanut (2700 Bermuda Hundred Road)

Chesterfield County, Chesterfield County

for Google

πŸ•’ 2026: Construction started.

Reported in the news, not confirmed yet

Approved, not built yet

Google Project Skye (4201 Moseley Road, near Magnolia Green)

Chesterfield County, Chesterfield County

850 acres Β· for Google

πŸ•’ 2025: County zoning approval, before Google was publicly named.

Reported in the news, not confirmed yet

Approved, not built yet

Google Project Loch (750 Watkins Centre Parkway)

Chesterfield County, Chesterfield County

350 acres Β· for Google

πŸ•’ 2025: County zoning approval.

Reported in the news, not confirmed yet

Being built

Digital Drive campus (Chirisa and PowerHouse, Meadowville)

Chesterfield County, Chesterfield County

104 acres

πŸ•’ Sept 26, 2024: PowerHouse and Chirisa announced the land purchase.

Reported in the news, not confirmed yet

Stopped or cancelled

Tract data center park on Branders Bridge Road

Chesterfield County, Chesterfield County

700 acres

πŸ•’ July 1, 2025: Tract withdrew its rezoning application.

Reported in the news, not confirmed yet

Approved, not built yet

QTS RIC4 and RIC5 expansions (White Oak / Varina)

Henrico County, Henrico County

1,100 acres

πŸ•’ 2026: QTS applied to the Virginia DEQ to permit 370 more diesel generators.

Reported in the news, not confirmed yet

Stopped or cancelled

Centra Logistics data centers off Darbytown Road (Varina)

Henrico County, Henrico County

πŸ•’ Feb 26, 2026: Board of Zoning Appeals denied Centra's vested-rights appeal.

Reported in the news, not confirmed yet

Proposed

DC Blox data center at the former Azalea Flea Market site

Henrico County, Henrico County

5 acres

πŸ•’ Jan 16, 2025: DC Blox bought the property.

Reported in the news, not confirmed yet

Proposed

Iron Mountain data center campus (White Oak Technology Park)

Henrico County, Henrico County

πŸ•’ Feb 2025: Iron Mountain announced the Henrico campus.

Reported in the news, not confirmed yet

Stopped or cancelled

Tract Mountain Road Technology Park

Hanover County, Hanover County

430 acres

πŸ•’ May 27, 2026: Board of Supervisors denied the rezoning 4-3.

Reported in the news, not confirmed yet

Stopped or cancelled

HHHunt Hunting Hawk Technology Park (near Wyndham)

Hanover County, Hanover County

410 acres

πŸ•’ Jan 28, 2026: HHHunt withdrew its applications.

Status unclear

Iron Horse data center park (near Ashland)

Hanover County, Hanover County

πŸ•’ Dec 2024: Hanover and Ashland planning commissions split on the proposal.

Reported in the news, not confirmed yet

Stopped or cancelled

LS Power data center campus on Old Ridge Road (Doswell)

Hanover County, Hanover County

πŸ•’ June 2026: Application withdrawn.

Reported in the news, not confirmed yet

Proposed

Tract Tuckahoe Tech Park (west of West Creek)

Goochland County, Goochland County

900 acres

πŸ•’ Aug 5, 2026: Tract filed its conditional use permit application.

Reported in the news, not confirmed yet

Approved, not built yet

Powhatan Technology Park (Province Group, Page Road)

Powhatan County, Powhatan County

181 acres

πŸ•’ Oct 27, 2025: Board of Supervisors approved the 60-acre addition 5-0.

Reported in the news, not confirmed yet

Status unclear

Amazon data center on Blackwell Road (Warrenton)

Warrenton, Fauquier County

42 acres Β· for Amazon Web Services

πŸ•’ July 30, 2026: Judge denied a residents' group's request to join Amazon's appeal.

Approved, not built yet

Remington Technology Park (Lucky Hill Road)

Fauquier County, Fauquier County

234 acres

πŸ•’ March 2018: County rezoned 234 acres for up to six data centers.

Reported in the news, not confirmed yet

Stopped or cancelled

Gigaland data center (Remington)

Fauquier County, Fauquier County

πŸ•’ Aug 17, 2026: Developer withdrew again before the September hearing.

Reported in the news, not confirmed yet

Stopped or cancelled

Convergent Technology Park (south of Remington)

Fauquier County, Fauquier County

100 acres

πŸ•’ Aug 27, 2026: Developer withdrew the rezoning.

Being built

EdgeCore Culpeper campus (Culpeper Technology Zone)

Culpeper County, Culpeper County

120 acres

πŸ•’ July 2024: EdgeCore bought 120 acres in the Culpeper Technology Zone.

Reported in the news, not confirmed yet

Status unclear

Brandy Station data center campus

Culpeper County, Culpeper County

πŸ•’ June 12, 2024: Planning Commission unanimously recommended denial.

Reported in the news, not confirmed yet

Proposed

EdgeCore Shannon Hill data center campus

Louisa County, Louisa County

697 acres

πŸ•’ June 25, 2025: EdgeCore announced the land purchase and $17 billion plan.

Reported in the news, not confirmed yet

Stopped or cancelled

Amazon third Louisa campus near the Northeast Creek Reservoir

Louisa County, Louisa County

for Amazon Web Services

πŸ•’ Jan 2026: Amazon bought about 1,920 acres for about $72 million.

Reported in the news, not confirmed yet

Approved, not built yet

Wilderness Crossing (Route 3 near Wilderness Battlefield)

Orange County, Orange County

732 acres Β· for Amazon (reported)

πŸ•’ Sept 16, 2025: Circuit judge allowed four of seven claims to proceed.

Reported in the news, not confirmed yet

Proposed

Plaza 500 data center (Edsall Road, Bren Mar)

Fairfax County, Fairfax County

34 acres

πŸ•’ Feb 16, 2026: Local homeowner association leaders asked the county to swap the site for affordable hou…

Reported in the news, not confirmed yet

Proposed

Starwood data center on county police training land (3721 Stonecroft Blvd, Chantilly)

Fairfax County, Fairfax County

41.7 acres

πŸ•’ March 17, 2026: Board of Supervisors voted 9-0 to approve the land sale.

Proposed

Starwood Word of Grace data center (Renaissance Tech Park, Herndon area)

Fairfax County, Fairfax County

8 acres

πŸ•’ Dec 2025: Starwood filed site plans and an initial air permit.

Reported in the news, not confirmed yet

Proposed

Serverfarm data center at 7980-7990 Quantum Drive (Tysons)

Fairfax County, Fairfax County

πŸ•’ March 11, 2026: Serverfarm's attorney filed a statement supporting its special exception request.

Reported in the news, not confirmed yet

Proposed

Virginia Technology Park (Clear Brook)

Frederick County, Frederick County

220 acres

πŸ•’ June 2026: Planning Commission unanimously recommended denial.

Proposed

Providence Digital Capital data center (1095 Oranda Road, near Strasburg)

Shenandoah County, Shenandoah County

103 acres

πŸ•’ Sept 21, 2026: Developer presented the plan to over 100 people at a community meeting.

Reported in the news, not confirmed yet

Proposed

Rushmark data center plan (Rockland Road)

Warren County, Warren County

πŸ•’ July 8, 2026: Planning Commission recommended denial of the code change.

Reported in the news, not confirmed yet

Proposed

Old Dominion Capital Partners data center (Madison Heights)

Amherst County, Amherst County

93 acres

πŸ•’ Aug 18, 2026: Developer filed its application; supervisors changed data center zoning rules the same d…

Reported in the news, not confirmed yet

Being built

Google data center campus (Botetourt Center at Greenfield)

Botetourt County, Botetourt County

312 acres Β· for Google

πŸ•’ March 26, 2026: Google formally announced the campus.

Proposed

Potomac Creek Campus data center (Eskimo Hill Road)

Stafford County, Stafford County

99.3 acres

πŸ•’ July 7, 2026: Board of Supervisors deferred the rezoning 4-3 pending an archaeology report.

Proposed

Accokeek Center data center (U.S. 1 near Eskimo Hill Road)

Stafford County, Stafford County

121 acres

πŸ•’ April 22, 2026: Planning Commission held a public hearing.

Reported in the news, not confirmed yet

Proposed

Project Tallmadge (Takanock, Strasburg Industrial Park)

Strasburg, Shenandoah County

80 acres

πŸ•’ Aug 2026: Revised site plan cut computing load to 120 MW.

Stopped or cancelled

Quantico Ridge data center plan (Dumfries Road, near Prince William Forest Park)

Prince William County, Prince William County

160 acres

πŸ•’ May 2026: Comprehensive plan amendment request withdrawn.

Reported in the news, not confirmed yet

Proposed

Gardner Property data centers (former Hillwood campground, Gainesville)

Prince William County, Prince William County

πŸ•’ Aug 13, 2026: Developer held a community meeting.

Status unclear

Winchester Gateway data center campus (Kernstown)

Frederick County, Frederick County

72 acres

πŸ•’ Sept 2, 2026: Planning Commission unanimously recommended denial of the permit.

Reported in the news, not confirmed yet

Approved, not built yet

STACK Infrastructure data center campus at Berry Hill megasite

Pittsylvania County, Pittsylvania County

3,000 acres

πŸ•’ July 21, 2026: Pittsylvania County supervisors passed a resolution supporting the data center campus.

Approved, not built yet

Anchorstone data center campus in Ringgold (Route 58 East)

Pittsylvania County, Pittsylvania County

946 acres

πŸ•’ July 16, 2024: Pittsylvania County supervisors voted unanimously to rezone 946 acres for heavy industry…

Stopped or cancelled

Balico gas power plant and data center campus near Chatham

Pittsylvania County, Pittsylvania County

2,233 acres

πŸ•’ April 14, 2025: Balico withdrew its second, smaller request (750 acres, up to 12 data centers) before a …

Proposed

TAC Data Centers gigawatt campus in eastern Wythe County

Wythe County, Wythe County

1,000 acres

πŸ•’ June 4, 2026: TAC Data Centers announced plans for a 1,000-megawatt campus of 9 to 11 buildings.

Reported in the news, not confirmed yet

Being built

Solis Arx data center campus at Progress Park

Wythe County, Wythe County

99 acres

πŸ•’ Dec 16, 2025: Solis Arx named Cadence as its general contractor.

Proposed

Haven Oak Technology Park (Tract)

Dinwiddie County, Dinwiddie County

1,000 acres

πŸ•’ Sept 22, 2026: Tract held a public meeting. It said it dropped buildings over the battlefield and switc…

Built & running

Microsoft data center campuses in Mecklenburg County

Mecklenburg County, Mecklenburg County

for Microsoft

πŸ•’ June 2024: Microsoft agreed to pay a $41,766.90 fine to the state for destroying 2.33 acres of wetl…

Proposed

Microsoft AVC22 campus expansion at Lakeside Commerce Park

Mecklenburg County, Mecklenburg County

490 acres Β· for Microsoft

πŸ•’ June 2026: Microsoft filed plans for a 490-acre campus with three buildings and a substation next t…

Reported in the news, not confirmed yet

Status unclear

Microsoft six-building campus off Butler Farm Road

Mecklenburg County, Mecklenburg County

369 acres Β· for Microsoft

πŸ•’ April 2023: Microsoft applied to the U.S. Army Corps of Engineers for a six-building campus that wou…

Reported in the news, not confirmed yet

Status unclear

Microsoft Hillcrest campus on Tunstall Road

Mecklenburg County, Mecklenburg County

132 acres Β· for Microsoft

πŸ•’ 2021: Microsoft asked for a zoning change for the site.

Reported in the news, not confirmed yet

Being built

TECfusions Clarksville data center and expansion

Mecklenburg County, Mecklenburg County

73 acres

πŸ•’ Feb 24, 2025: TECfusions said it bought and rezoned 73 acres to add 300 megawatts for AI computing.

Reported in the news, not confirmed yet

Stopped or cancelled

Data center near Etheridge (Centerville Turnpike)

Chesapeake, Chesapeake city

23 acres

πŸ•’ July 21, 2026: City Council paused new data center applications for up to eight months.

Being built

Globalinx data center campus at Corporate Landing (expansion)

Virginia Beach, Virginia Beach city

21.5 acres

πŸ•’ Aug 18, 2026: Virginia Beach City Council passed a 12-month pause on new data center permits.

Proposed

Globalinx backup data center in Portsmouth

Portsmouth, Portsmouth city

πŸ•’ July 2025: Globalinx told the Portsmouth Broadband Authority it plans a data center in the city.

Reported in the news, not confirmed yet

Proposed

Wise Innovation Hub data center complex with gas power plant

Wise County, Wise County

400 acres

πŸ•’ Feb 25, 2026: Plans for nine data center buildings (about 2 million square feet) were made public.

Proposed

Oasis Digital data center campus at former Moss No. 3 mine

Russell County, Russell County

236 acres

πŸ•’ Sept 15, 2026: Plans for three or four data centers on the old mine site were made public.

Reported in the news, not confirmed yet

Proposed

Project Lightning data center at Wildwood Commerce Park

Carroll County, Carroll County

πŸ•’ Sept 29, 2026: Grayson County confirmed an $11 billion data center is planned at Wildwood Commerce Park…

Reported in the news, not confirmed yet

Stopped or cancelled

Project Flash (Crusoe) at Summit View Business Park

Franklin County, Franklin County

150 acres

πŸ•’ Aug 16, 2026: A county supervisor said Project Flash is not proceeding.

Status unclear

Mesh Capital data center on Cabin Field Road

Campbell County, Campbell County

57 acres

πŸ•’ Nov 3, 2025: News reported the developer filed three scaled-back site plans that do not need a board …

Reported in the news, not confirmed yet

Proposed

Mount Athos Road data center site

Campbell County, Campbell County

135 acres

πŸ•’ Feb 2024: A concept plan for a data center on the Mount Athos Road property was submitted.

Reported in the news, not confirmed yet

Status unclear

Surry Green Energy Center (data centers next to Surry nuclear plant)

Surry County, Surry County

641 acres

πŸ•’ Aug 2023: Green Energy Partners teamed up with IP3 on the small nuclear reactor plan.

Reported in the news, not confirmed yet

Approved, not built yet

AVAIO Digital data center campus at Appomattox Center for Business and Commerce

Appomattox County, Appomattox County

452 acres

πŸ•’ March 23, 2026: AVAIO told the county authority it plans the first building and part of a substation in …

Proposed

AVAIO Digital campus at Heartland Innovative Technology Park (Project Pegasus)

Prince Edward County, Prince Edward County

280 acres

πŸ•’ Jan 28, 2025: AVAIO Digital and the Prince Edward County IDA announced a five-building data center cam…

Reported in the news, not confirmed yet

Proposed

Possible data center at New River Valley Commerce Park

Pulaski County, Pulaski County

πŸ•’ Feb 3, 2026: Officials said a developer is under contract to prepare the park for data centers; no en…

Approved, not built yet

NuVu Real Estate data center campus on County Drive

Petersburg, Petersburg city

75 acres

πŸ•’ Feb 2026: Petersburg approved the site plan, the city's first for a data center.

Proposed

Menlo Digital data center campus on Jamestown Drive

Petersburg, Petersburg city

74 acres

πŸ•’ July 21, 2026: City documents showed Menlo grew its plan from two to four buildings (1.2 million square…

Reported in the news, not confirmed yet

Approved, not built yet

Wagner Road data center

Petersburg, Petersburg city

73 acres

πŸ•’ April 2026: Petersburg approved the site plan for three data center buildings.

Reported in the news, not confirmed yet

Approved, not built yet

Collier's Yard data center campus (Warrenton Group)

Petersburg, Petersburg city

175 acres

πŸ•’ Feb 2026: Zoning was changed to make the site bigger for wetland work.

Proposed

Data center at former Hopewell ethanol plant

Hopewell, Hopewell city

πŸ•’ Feb 2026: NS Development Partners bought the former ethanol plant site.

Reported in the news, not confirmed yet

Stopped or cancelled

Roxbury Technology Park (Diode Ventures)

Charles City County, Charles City County

515 acres

πŸ•’ Aug 18, 2025: Diode Ventures withdrew the project.

The rules in Virginia

What the state says about data centers, in plain words.

πŸ“œ State laws

New law: big data centers must study noise before local approval (HB 153) Β· April 13, 2026
Starting July 1, 2026, before a county, city or town approves a rezoning, special exception or special use permit for a new 'high energy use facility' (one expected to need 100 megawatts or more of power), the applicant must submit a study of the facility's noise on homes and schools within 500 feet of the property line. The locality may also ask for a study of effects on ground and surface water, farmland, parks, registered historic sites and forests. The power company must also tell the locality which substations will serve the site and what power line voltage it needs. The law does not take away any local zoning power. Expansions of an already-approved site that add less than 100 megawatts are exempt. Source

New law: cleaner backup generators for new data center air permits (HB 507) Β· April 8, 2026
For any data center air permit application sent to the Department of Environmental Quality (DEQ) on or after July 1, 2026, DEQ may not issue the permit unless each diesel backup generator meets an emission limit at least as clean as a 'Tier 4 equivalent' generator (one with filters and catalysts that cut smog-forming gases, carbon monoxide and soot). DEQ can still set stricter limits. Source

New law: regulators must make sure data centers are not subsidized by other customers (HB 1393 / SB 253) Β· May 14, 2026
In Dominion Energy's rate reviews, the State Corporation Commission (SCC) must take all reasonable steps to make sure costs for customers using 25 megawatts or more at a steady high rate (mostly data centers) are not paid by other customers, and that other customers' rates are not hurt by them. Factories and warehouses (not data storage) with at least 200 workers could choose by July 1, 2026, to stay on their old rate. The same law raises Dominion's required help for low-income, elderly and disabled customers to $156 million to $204 million from July 2026 to July 2038. The Governor proposed changes; the bills became law May 14, 2026. Source

New law: data centers asked to cut power use when the grid is strained (HB 284 / SB 371) Β· April 8, 2026
By January 15, 2027, Dominion Energy and Appalachian Power must each ask the SCC to approve a voluntary 'demand flexibility' program for customers using 25 megawatts or more (mostly data centers). These customers would lower or shift their power use at peak times. The SCC must decide by November 30, 2027. The cost of payments to these customers may not be passed to other customers. Source

New law: water utilities must report how much water they sell to data centers (HB 496 / SB 553) Β· April 13, 2026
Starting January 1, 2027, big water users that supply water to others (like public water systems) must report, every reporting period, the total water they gave each month to data centers that have a DEQ air permit, with drinking water and reused (reclaimed) water reported separately. Source

New law: electric co-ops can let big customers pay to build their own substations (HB 1191) Β· March 31, 2026
An electric cooperative may agree with a member using at least 20 megawatts to build a substation for that member only, at the member's sole cost. The SCC must keep these costs out of other members' rates. Source

Bills held over to 2027: more data center rules Β· March 14, 2026
46 data center bills from 2026 were carried over to the 2027 session (starts January 2027). These include SB 339 (an SCC case to check if big power users are being subsidized), SB 336 (study limiting older 'Tier 2' diesel generators at data centers) and HB 1502 (a study of pollution from backup generators). The Governor said she will also ask lawmakers in 2027 to ban secret deals (NDAs) by local governments and to require local approval for any data center using more than 25 megawatts. Source

2025: data center siting bills vetoed (HB 1601 / SB 1449) Β· May 2, 2025
In 2025 lawmakers passed bills to require site studies (noise, water, farmland, historic sites) for big data centers. Then-Governor Glenn Youngkin vetoed them on May 2, 2025. A version passed again in 2026 as HB 153 and was signed. Source

Executive Order 22: Data Center Accountability Framework Β· Sept 18, 2026
On September 18, 2026, Governor Abigail Spanberger signed Executive Order 22. It bans state agencies and state employees from signing secret deals (NDAs) about data center projects (local governments are not covered). It stops state discretionary programs, like the Virginia Business Ready Sites Program, from helping new data centers expecting 25 megawatts or more. It tells DEQ to speed up noise and water rules and review the combined effects of backup generators (180 days), asks for a toolkit to help localities negotiate with data centers (120 days), and asks Virginia Energy for siting guidance on reused land and historic and scenic areas (240 days). It does not stop data centers or change local zoning power. Source

πŸ’‘ Who pays for the power

Dominion's new rate class for big power users (GS-5), starts 2027 Β· Nov 26, 2025
On November 26, 2025, the SCC created a new rate class, called GS-5, for Dominion Energy customers that need 25 megawatts or more. It starts January 1, 2027. These customers must sign 14-year contracts and pay for at least 85% of the power line (transmission and distribution) capacity and 60% of the power plant (generation) capacity they sign up for, even if they use less. The SCC said this is to help protect other customers from the costs of building for data centers. Source

Dominion home bills going up in 2026 and 2027 Β· Nov 26, 2025
In the same November 26, 2025 decision, the SCC approved a base rate increase for a typical Dominion home customer of $11.24 a month in 2026 and $2.36 more a month in 2027 ($13.60 total, about 9%). Dominion had asked for $19.57. Source

Appalachian Power: 14-year contracts for big new customers Β· June 2026
In June 2026 the SCC set new rules for large new customers of Appalachian Power in Virginia: 14-year contracts and minimum charges. It did not create a separate customer class like Dominion's. Appalachian Power has signed 540 megawatts of data center demand in Virginia since 2024 and is talking with 36 more large customers wanting about 25,000 megawatts, more than three times its recent peak demand of 7,200 megawatts. Source

State study: data centers could raise home power bills Β· Dec 9, 2024
A December 2024 study by JLARC (the General Assembly's watchdog) estimated that for a typical Dominion home using 1,000 kilowatt-hours a month, power plant and power line costs tied to data center growth could add about $33 a month by 2040 if growth is not limited, or about $14 a month if growth is half as fast. It said rate rules were not designed to protect other customers from the very large cost increases driven by data centers. Source

πŸ’΅ Tax breaks

Sales tax break on data center equipment (still in place) Β· June 29, 2026
Data centers do not pay Virginia sales tax on computer equipment and software, including chillers and backup generators, if the site invests at least $150 million and creates at least 50 jobs paying at least 1.5 times the local average wage (10 jobs in a 'distressed' locality), under a deal with the Virginia Economic Development Partnership. The break runs through June 30, 2035. JLARC found it was worth $928 million to the industry in fiscal year 2024; other estimates put it at about $1.6 billion a year now. In 2026 the Senate wanted to end it, but the final budget kept it. Source

New tax on data center electricity (July 2026 to June 2028) Β· July 1, 2026
The 2026-2028 state budget (law since June 29, 2026) adds a tax of 1.1 cents per kilowatt-hour on electricity used by data centers, starting July 1, 2026. The owner, operator or tenant of the data center pays it. Total collections are capped at $600 million a year; any extra is refunded. It ends after June 30, 2028 unless lawmakers renew it. Source

🀐 Secret deals and public records

Secret deals (NDAs) are common for local data center deals Β· Sept 18, 2026
No Virginia law stops counties, cities or towns from signing secret deals (NDAs) with data center developers. A University of Mary Washington researcher found NDAs in at least 25 of 31 Virginia data center projects studied. Executive Order 22 (September 2026) bans NDAs only for state agencies; the Governor plans to ask lawmakers in 2027 to ban them for local governments. Source

How to get public records (Virginia FOIA) Β· 2026
Under the Virginia Freedom of Information Act, public records are open to citizens of Virginia and to newspapers, magazines, radio and TV with an audience in Virginia. People who live outside Virginia do not have a legal right to records (some offices answer anyway). Your request must describe the records clearly; you do not have to mention the law. The office must answer within 5 working days: give the records, say it is withholding some (and cite the law), or take 7 more working days if it explains why. It may charge reasonable costs and must give an estimate if you ask. Source

Why some data center records are held back Β· 2026
Virginia FOIA lets public bodies withhold business information given to them under a promise of confidentiality for economic development, and papers about businesses considering locating in Virginia when bargaining is involved and release would hurt the public body's finances. Localities often use this for early data center talks. Source

State agencies may no longer sign data center NDAs Β· Sept 18, 2026
Since September 18, 2026, state executive branch agencies, boards and employees may not sign or require NDAs for data center projects (Executive Order 22). Source

πŸ’§ Water

Who approves the water a data center uses Β· Dec 9, 2024
Most Virginia data centers buy water from a local water utility (often a county or city authority), so the local utility and its board decide whether to serve them. The Department of Environmental Quality (DEQ) regulates large water withdrawals from rivers and groundwater and requires permits for large withdrawals. Water is tighter in Groundwater Management Areas (eastern Virginia). JLARC found most data centers in 2023 used about as much water as a large office building or less, but use is growing. Source

New: monthly water sales to data centers must be reported (from 2027) Β· April 13, 2026
From January 1, 2027, water utilities must report to DEQ how much drinking water and reused water they provide each month to data centers with an air permit (HB 496 / SB 553). Executive Order 22 also told DEQ to speed up water rules for data centers. Source

🌫️ Air and generators

Air permits for backup generators (DEQ) Β· July 1, 2026
DEQ issues air permits for diesel backup generators at data centers. Northern Virginia data centers have over 4,000 diesel generators with more than 11 gigawatts of capacity. For applications from July 1, 2026, the law (HB 507) and new DEQ guidance require Tier 4-level emissions limits. DEQ's guidance says it no longer assumes these generators run only in emergencies, because they may run during grid alerts and demand programs. Draft permits are posted for public comment. Source

Review of generators and noise rules ordered Β· Sept 18, 2026
Executive Order 22 (September 18, 2026) told DEQ to review the combined effects of data center backup generators and to speed up noise rules, with work plans due within 180 days. Source

πŸ™‹ How to have your say

Who decides a data center near you Β· 2026
Virginia has no townships. Counties zone land outside towns through the county Board of Supervisors (after a planning commission review). Independent cities (like Manassas or Virginia Beach) zone their own land through City Council; cities are not part of any county. Incorporated towns (like Leesburg or Culpeper) zone inside town limits through Town Council. Many data centers are allowed 'by right' in industrial zones, which means no public vote is needed; others need a rezoning, special exception or special use permit, which needs a public hearing. The state SCC decides power plants and big power lines; DEQ decides air and water permits. Source

How zoning hearings work Β· 2026
Rezonings and special use permits need public hearings at the planning commission and the governing body. Notice must be published twice in a local newspaper: the first no more than 28 days before the hearing and the second at least 5 days before. Nearby owners also get written notice. Anyone can speak or send written comments. For data centers needing 100 megawatts or more, ask to see the required noise study and the power company's substation form (HB 153). Source

Appeal deadlines: 30 days Β· 2026
To challenge a zoning decision by the Board of Supervisors, City Council or Town Council, you must file in the circuit court within 30 days of the decision. This deadline is strict. To appeal a zoning administrator's ruling, you usually go first to the Board of Zoning Appeals; its decisions can be taken to circuit court within 30 days. Source

How to ask for records Β· 2026
Virginia residents can send a FOIA request by email or letter to the county, city or town FOIA officer. Ask for records like data center NDAs, emails with developers, and site studies. The office has 5 working days to respond. Only Virginia citizens and Virginia media have a legal right to records. Source

Comment at the State Corporation Commission Β· 2026
You can file a public comment on any open SCC case (for example Dominion's rate reviews or demand flexibility programs) online on the SCC's 'Submit Public Comments' page. Search cases by number on SCC Docket Search. Source

Comment on air and water permits Β· 2026
DEQ posts draft air and water permits for public comment, usually 30 days. You can ask for a public hearing during the comment period. Watch DEQ's public notices and the Virginia Regulatory Town Hall for meetings. Source

🧾 Help with your bills

Fuel Assistance: help with heating bills Β· 2026
The Energy Assistance Program helps pay heating bills once a year. Apply from the second Tuesday in October to the second Friday in November, online at CommonHelp, by phone at 855-635-4370, or at your local Department of Social Services. Notices go out in late December. Source

Crisis Assistance: heating emergencies Β· 2026
Helps with a heating emergency: no heat, a cut-off notice or unsafe equipment. Equipment help November 1 to March 15; fuel and utility bills January to March 15. Source

Cooling Assistance: summer bills and air conditioners Β· June 15, 2026
Helps pay electric bills for cooling, or buy or fix air conditioning. Applications June 15 to August 17 each year (2026: June 15 to August 17). Source

PIPP: power bill capped at a share of your income Β· June 1, 2026
For Dominion Energy and Appalachian Power customers. Your monthly electric payment is 10% of income if you heat with electricity, or 6% if you heat another way. If you pay on time in full, 1/12 of your old past-due balance is forgiven each month. Apply at CommonHelp or your local Department of Social Services. Source

πŸ“ž Who to contact

State Corporation Commission (SCC) Β· Oct 7, 2026
Sets electric rates and rules for Dominion Energy, Appalachian Power and co-ops, including data center rate classes. Approves power plants and big power lines. Takes public comments on cases. Source

Department of Environmental Quality (DEQ) Β· Oct 7, 2026
Issues air permits for data center backup generators and permits for large water withdrawals; will collect monthly data center water reports from 2027. Source

Joint Legislative Audit and Review Commission (JLARC) Β· Oct 7, 2026
The General Assembly's watchdog. Wrote the 2024 study of data center costs and effects. Source

Virginia Economic Development Partnership (VEDP) Β· Oct 7, 2026
Signs the agreements data centers need to get the sales tax break. Source

Virginia Energy (Department of Energy) Β· Oct 7, 2026
State energy agency. Under Executive Order 22 it writes siting guidance for data centers. Source

Department of Social Services (DSS) Β· Oct 7, 2026
Runs energy bill help (Fuel, Crisis, Cooling Assistance) and PIPP. Apply at commonhelp.virginia.gov or 855-635-4370. Source

Virginia FOIA Council Β· Oct 7, 2026
Free state office that answers questions about public records and open meetings law. Source

Virginia General Assembly (LIS) Β· Oct 7, 2026
Bill tracking for state laws on data centers. Find your legislators and follow 2027 bills. Source

Counties

Bold counties have at least one data center project.