USA › Pennsylvania

Data centers in Pennsylvania

120 projects we know about, across 42 counties. Pick your county below, or type your ZIP on the home page.

Built & runningBeing builtApproved, not built yetProposedStopped or cancelled

All projects

Newest activity first. Click one to see the details.

Proposed

Hunlock Creek power plant data center idea (Castleton Commodities, Hunlock Township)

Hunlock Township, Luzerne County

🕒 Sept 2026: News roundup reported that Shell Energy North America is buying the 169 MW Hunlock Creek…

Reported in the news, not confirmed yet

Proposed

Terawatt data center proposal at former Appvion paper mill

Taylor, Blair County

🕒 Oct 5, 2026: Next township meeting was set for 6 p.m.

Reported in the news, not confirmed yet

Being built

PAX-1 data center campus (Middlesex Township)

Middlesex Township, Cumberland County

700 acres

🕒 Oct 5, 2026: After a new court filing by the residents' group Stop PAX-1, a Cumberland County judge r…

Approved, not built yet

Amazon (AWS) Kline Township campus

Kline Township, Schuylkill County

346 acres · for Amazon

🕒 Sept 30, 2026: At a special meeting, township supervisors voted unanimously to approve Amazon's data ce…

Proposed

Wyalusing Energy Center / Klondike data center (Bradford County)

Wyalusing Township, Bradford County

🕒 Oct 9, 2025: DEP issued the air permit (plan approval 08-00060A) for the power plant.

Proposed

Wildcat Ridge data center campus (Archbald)

Archbald, Lackawanna County

574 acres

🕒 Sept 10, 2026: Council refused to step aside (recusal) and closed the hearing record after 9 hearings.

Proposed

Project Gravity (Archbald)

Archbald, Lackawanna County

186 acres · for A future hyperscale tenant (not named)

🕒 Sept 22, 2026: Corscale (owner since Dec. 2025) said final land development plans would be submitted so…

Proposed

Project Green Mountain (Archbald)

Archbald, Lackawanna County

271 acres

🕒 Sept 30, 2026: Hearings set to resume.

Proposed

Project Boson (Archbald)

Archbald, Lackawanna County

86 acres

🕒 Dec 2025: Plan merged into one building of about 620,000 square feet ('Project Boson').

Proposed

Project Scott (Archbald I LLC, 18 buildings)

Archbald, Lackawanna County

400 acres

🕒 Sept 18, 2026: The Times-Tribune listed Project Scott as denied by Archbald Council and in court agains…

Proposed

Project North (Archbald I LLC, 4 buildings near the Jermyn line)

Archbald, Lackawanna County

66 acres

🕒 Sept 18, 2026: The Times-Tribune listed 'Project North' (4 buildings, 66 acres) as applied under Archba…

Proposed

Breaker Street data center campus (Jessup)

Jessup, Lackawanna County

131 acres

🕒 Sept 25, 2026: News reports said Breaker Street Associates LLC, tied to Catalyst Commercial Development…

Approved, not built yet

Sunnyside Road data center (Jessup)

Jessup, Lackawanna County

🕒 Sept 25, 2026: News reports said the Sunnyside Road project is 'tied up in litigation' after Council's …

Proposed

DBT-Data Lackawanna One (Jessup)

Jessup, Lackawanna County

39 acres

🕒 Sept 4, 2026: Application filed for a 200,000-square-foot, one-story data center.

Reported in the news, not confirmed yet

Status unclear

DBT-Data Lackawanna Two, Three and Four sites (Archbald/Jessup)

Archbald, Lackawanna County

355 acres

🕒 Sept 2026: Reported that DBT holds memorandums with SLIBCO for three more sites.

Reported in the news, not confirmed yet

Approved, not built yet

Project Gold (Clifton Township, Gouldsboro)

Clifton Township, Lackawanna County

1,000 acres

🕒 Aug 20, 2026: Judge ruled the township's old data center zoning law void; the settlement stays in effe…

Proposed

Dickson City Development data center (Bell Mountain)

Dickson City, Lackawanna County

🕒 Sept 18, 2026: The Times-Tribune listed the Bell Mountain project (4 buildings) as denied by the zoning…

Proposed

Scranton Materials data center campus (Ransom Township)

Ransom Township, Lackawanna County

251 acres

🕒 Sept 3, 2026: News reports said the developer's second lawsuit (asking a judge to rule on the zoning) …

Stopped or cancelled

Mudiita data center campus idea (Ransom Township)

Ransom Township, Lackawanna County

530 acres

🕒 July 27, 2026: Owner said he does not plan a data center there right now; websites advertising an all-e…

Proposed

Popca LLC data center campus (Newton Township)

Newton Township, Lackawanna County

76 acres

🕒 Sept 18, 2026: The Times-Tribune listed the Newton project (2 buildings, 76 acres) as denied by the tow…

Stopped or cancelled

Blakely data center campus

Blakely, Lackawanna County

209 acres

🕒 Sept 12, 2025: Developers withdrew the zoning change request after the borough declined another public …

Status unclear

Triboro data center site (Olyphant)

Olyphant, Lackawanna County

🕒 April 14, 2026: Borough Council declared its zoning invalid for leaving out data centers, giving itself …

Status unclear

PNK Group data centers (Valley View Business Park, Archbald)

Archbald, Lackawanna County

89 acres

🕒 July 2026: PNK began a mail and online campaign about two data centers.

Reported in the news, not confirmed yet

Built & running

Amazon (AWS) Salem Township campus next to Susquehanna nuclear plant

Salem Township, Luzerne County

1,600 acres · for Amazon

🕒 Aug 5, 2026: SRBC staff inspected the campus and found no water-rule violations.

Built & running

Nautilus Cryptomine (bitcoin mining at Susquehanna nuclear plant)

Salem Township, Luzerne County

for Bitcoin mining

🕒 Oct 2024: TeraWulf sold its 25% share of the Nautilus mine to a Talen Energy company for about $92…

Approved, not built yet

QTS data center campus (Salem 2), Salem Township

Salem Township, Luzerne County

1,700 acres

🕒 Aug 22, 2026: Developers said construction is planned to begin in late 2026.

Proposed

Salem 3 data center campus (4-3 Glennbrook Group)

Salem Township, Luzerne County

4,466 acres

🕒 Sept 24, 2026: After a judge ordered a re-hearing, the Planning Commission recommended it again (third …

Proposed

Project Hazelnut (NorthPoint, Hazle Township)

Hazle Township, Luzerne County

1,280 acres · for Amazon Web Services (reported)

🕒 Sept 2026: NorthPoint sent letters to about 4,500 households about the $10,000 offer. Many resident…

Status unclear

Sugarloaf Township data center (Tomhicken Road)

Sugarloaf Township, Luzerne County

185 acres

🕒 Sept 18, 2026: The Times-Tribune listed the LBT Sugarloaf project (6 buildings, 185 acres) as seeking a…

Reported in the news, not confirmed yet

Stopped or cancelled

West Hazleton data center site (behind Valmont Shopping Plaza)

West Hazleton, Luzerne County

🕒 Dec 2025: Reported as withdrawn.

Reported in the news, not confirmed yet

Proposed

Hollenback Township landowner rezoning for data centers

Hollenback Township, Luzerne County

460 acres

🕒 Sept 18, 2026: The Times-Tribune listed the Hollenback request (11 data centers on 460 acres) with the …

Reported in the news, not confirmed yet

Proposed

Brewster Land Company data center challenge (Dorrance Township)

Dorrance Township, Luzerne County

155 acres

🕒 Sept 18, 2026: The Times-Tribune listed the Brewster site (6 buildings, 155 acres) as in a zoning dispu…

Reported in the news, not confirmed yet

Approved, not built yet

Fit Energy fuel cell power and data center project (Newport Township)

Newport Township, Luzerne County

1,386 acres

🕒 Oct 6, 2026: Fit Energy announced a fuel cell power and data center project on former mining land, wi…

Being built

Nebius 'AI factory' at Highridge Industrial Park (Butler Township, Schuylkill)

Butler Township, Schuylkill County

600 acres · for Nebius (AI computing capacity not yet sold)

🕒 Sept 2026: Supervisors voted 2-1 to add land to the data center district for Phase 3, and lowered t…

Proposed

KRNL data center (New Castle Township, near Frackville)

New Castle Township, Schuylkill County

🕒 May 5, 2026: Supervisors voted 2-0 to add a Highway Industrial zone where data centers are a conditio…

Reported in the news, not confirmed yet

Stopped or cancelled

Talen Energy data center rezoning (Anthony Township, Montour County)

Anthony Township, Montour County

🕒 Feb 10, 2026: County commissioners unanimously denied Talen's rezoning, saying it gave few details on …

Proposed

PNK Group data center (Gregg Township, Union County)

Gregg Township, Union County

for No tenant yet; likely AI

🕒 Sept 14, 2026: Third session of the supervisors' public hearing on PNK P2 LLC's zoning amendment and co…

Proposed

FIT Energy data center (Natalie, Mount Carmel Township)

Mount Carmel Township, Northumberland County

Reported in the news, not confirmed yet

Status unclear

Muncy data center (Muncy Township)

Muncy Township, Lycoming County

🕒 Sept 26, 2026: Reports on the 'Danko Data Center' application say the plans include water storage tanks…

Proposed

Alpha Compute data center campus (Tioga County)

unknown, Tioga County

350 acres

🕒 Aug 11, 2026: Alpha Compute announced a binding term sheet to buy land and gas rights for $55 million …

Stopped or cancelled

Linde Corporation 20-building data center campus (Clinton Township, Wayne County)

Clinton Township, Wayne County

682 acres

🕒 Sept 9, 2026: The planning commission recommended a no, and supervisors then voted to deny the plan. T…

Proposed

Pennsylvania Glacial Till data center overlay (Tobyhanna Township)

Tobyhanna Township, Monroe County

520 acres

🕒 April 16, 2026: Zoning Hearing Board continued a hearing on residents' challenge that the overlay is ill…

Reported in the news, not confirmed yet

Proposed

Smithfield Gateway data center (Route 209, Monroe County)

Smithfield Township, Monroe County

🕒 Feb 2026: Smithfield Township Planning Commission discussed the 'Smithfield Gateway' sketch plan f…

Proposed

Keel Infrastructure Panther Creek / Carbon Node East data center (Nesquehoning)

Nesquehoning, Carbon County

🕒 Aug 21, 2026: Keel said the closed-loop cooling system would need about 700,000 gallons to fill at the…

Proposed

DTA Alliance data center campus (Lower Towamensing Township)

Lower Towamensing Township, Carbon County

700 acres

🕒 Sept 10, 2026: About 20 people attended a planning commission meeting raising water, noise and property…

Proposed

Penn Forest Township data center (Route 903 and Maury Road)

Penn Forest Township, Carbon County

750 acres

🕒 Aug 2026: The zoning board threw out a separate challenge to the data center ordinance because no …

Proposed

Project Atlas (Edged, South Whitehall Township)

South Whitehall Township, Lehigh County

410 acres

🕒 July 9, 2026: New three-building plan (about 1.5 million sq ft, 725 MW) presented; township engineer d…

Proposed

Quantm Group data center (2401 W. Emaus Ave., Allentown)

Allentown, Lehigh County

14 acres

🕒 Sept 2026: The Lehigh County Authority, which runs Allentown's public water, said a data center wil…

Proposed

J.G. Petrucci data center (1024 N. Bradford St., Allentown)

Allentown, Lehigh County

🕒 Sept 23, 2026: Regional planners said the plan is missing cooling, water, power and noise details.

Stopped or cancelled

Air Products Cetronia Road data center (Upper Macungie Township)

Upper Macungie Township, Lehigh County

194 acres

🕒 Aug 11, 2026: Air Products dropped the project.

Approved, not built yet

Prologis Lehigh Valley East 16 warehouse-to-data-center (Allen Township)

Allen Township, Northampton County

🕒 April 21, 2026: The Lehigh Valley Planning Commission said it could not fully review the plan and asked …

Proposed

Industrial Drive data center (2184 Industrial Drive, Bethlehem)

Bethlehem, Northampton County

7 acres

🕒 Sept 2026: Bethlehem planning commission review; regional planners offered conditional support.

Reported in the news, not confirmed yet

Proposed

Lower Mount Bethel hyperscale data center (near Martins Creek power plant)

Lower Mount Bethel Township, Northampton County

284 acres

🕒 Sept 14, 2026: Supervisors to acknowledge the rezoning petition and vote on data center rules.

Proposed

Slate Belt Holdings data center campus (Upper Mount Bethel Township)

Upper Mount Bethel Township, Northampton County

754 acres

🕒 Aug 24, 2026: Supervisors voted 3-2 not to drop talks on a non-binding deal (memorandum of understandi…

Being built

Amazon (AWS) Falls Township campus (Keystone Trade Center)

Falls Township, Bucks County

for Amazon

🕒 July 14, 2026: At a town hall, the head of the Morrisville Municipal Authority said the campus could us…

Proposed

215 Cathill Road data center (West Rockhill Township)

West Rockhill Township, Bucks County

🕒 April 15, 2026: Nearly 200 residents opposed data centers as supervisors approved a zoning amendment to …

Reported in the news, not confirmed yet

Proposed

Project Laurel (MCD 7 LLC, Limerick Township)

Limerick Township, Montgomery County

192 acres · for Not named (developer cites NDAs)

🕒 April 2026: Township planners asked for new will-serve letters from Pennsylvania American Water to s…

Proposed

MLP Ventures data centers (Upper Merion Township)

Upper Merion Township, Montgomery County

🕒 Sept 10, 2026: Supervisors voted to send the township lawyer to oppose the developer's variance request…

Proposed

Data center at former steel mill, 900 Conshohocken Road (Plymouth Township)

Plymouth Township, Montgomery County

🕒 Aug 6, 2026: Zoning Hearing Board hearing at Colonial Middle School ended without a decision; more se…

Proposed

Undisclosed data center (Hanover Land Development site, Upper Hanover Township)

Upper Hanover Township, Montgomery County

Reported in the news, not confirmed yet

Being built

Sentinel / Green Fig data center at Foote Mineral Superfund site (East Whiteland)

East Whiteland Township, Chester County

100 acres

🕒 Aug 26, 2026: Second stop-work order until Aqua confirms enough water.

Proposed

Pennhurst data center (East Vincent Township)

East Vincent Township, Chester County

125 acres

🕒 June 26, 2026: Penn Hurst Holdings DE LLC appealed the denial to the Chester County Court of Common Ple…

Stopped or cancelled

'Boutique' data center (North Coventry Township)

North Coventry Township, Chester County

17 acres

🕒 Feb 23, 2026: Supervisors voted 3-2 to reject the sketch plan.

Reported in the news, not confirmed yet

Status unclear

Project Trainer (Ridge Road, Trainer Borough)

Trainer, Delaware County

24 acres

🕒 Aug 2026: Lawyer requested a preliminary zoning determination for a 'proposed data center'.

Reported in the news, not confirmed yet

Proposed

Titus Station AI data center campus (Cumru Township)

Cumru Township, Berks County

🕒 May 15, 2026: Developers announced plans; township had just passed a data center ordinance.

Stopped or cancelled

Constellation Energy data center (East Coventry Township, near Limerick nuclear plant)

East Coventry Township, Chester County

🕒 Feb 17, 2026: Constellation withdrew its application (BOS-25-002) for data center zoning changes; the …

Being built

Lancaster AI Hub / CoreWeave data center (Greenfield Road, Lancaster)

Lancaster, Lancaster County

144 acres · for CoreWeave (sole tenant)

🕒 Sept 2026: A judge canceled a zoning hearing on the second Greenfield Road data center.

Stopped or cancelled

McGinness Innovation Park bid (Columbia Borough)

Columbia, Lancaster County

🕒 July 14, 2026: Borough Council voted 4-3 for a zoning ordinance that blocks data centers on the McGinne…

Stopped or cancelled

South Annville Township data center (Mount Pleasant Road)

South Annville Township, Lebanon County

100 acres

🕒 May 13, 2026: Project scrapped after grassroots opposition.

Proposed

Corscale Highlands West data center (Dauphin Highlands golf course, Swatara Township / Steelton)

Swatara Township, Dauphin County

228 acres

🕒 Sept 2026: Corscale filed a 73-page lot consolidation and final land development plan: three 409,50…

Proposed

HCI DP Land Acquisition data center (South Hanover Township quarry)

South Hanover Township, Dauphin County

250 acres

🕒 June 23, 2026: Crowd packed township building after supervisors announced the two applications.

Proposed

PA Data Center Partners / PowerHouse data center (Monroe Township, Cumberland)

Monroe Township, Cumberland County

Reported in the news, not confirmed yet

Proposed

Airport Road data center zoning request (Southampton Township, Cumberland County)

Southampton Township, Cumberland County

🕒 Feb 3, 2026: Supervisors postponed the public hearing on the Airport Road request and gave the landow…

Stopped or cancelled

Farm data center offer (Silver Spring Township)

Silver Spring Township, Cumberland County

Reported in the news, not confirmed yet

Proposed

MRP Industrial data center campus (Perry County)

Watts Township, Perry County

288 acres

🕒 Aug 2026: Watts Township supervisors adopted data center rules. MRP Industrial took legal action o…

Status unclear

PA Data Center Partners project (Loop Road, Granville Township)

Granville Township, Mifflin County

🕒 July 20, 2026: Supervisors rejected the application over a missing traffic study certification and warn…

Proposed

Fairview Crossroads data center (Fairview Township, York County)

Fairview Township, York County

🕒 July 28, 2025: Supervisors unanimously revised zoning to allow data centers with setback and noise rules.

Proposed

Windsor Township data center (Elysian Partners)

Windsor Township, York County

🕒 Aug 2025: A Florida real estate company urged the township to allow data centers.

Proposed

Rexroth Farms data center (Conewago Township, York County)

Conewago Township, York County

541 acres

🕒 June 2, 2026: Supervisors voted 3-0 to advertise a workshop on data centers; many residents spoke agai…

Stopped or cancelled

Royal Manchester Golf Links data center rezoning (East Manchester Township)

East Manchester Township, York County

Proposed

Briarwood golf course data center (West Manchester Township)

West Manchester Township, York County

🕒 Oct 2025: West Manchester Township supervisors approved the zoning change the data center needs, w…

Proposed

York 2 Energy Center data center (Peach Bottom Township)

Peach Bottom Township, York County

🕒 Jan 7, 2026: Constellation Energy finished buying Calpine. The Justice Department required it to sell…

Proposed

Corscale Highlands East data center (Highland Street, Swatara Township)

Swatara Township, Dauphin County

157 acres · for unknown (developer says a tenant is in mind, no signed deal)

🕒 Sept 8, 2026: Corscale showed its 121-page land development plan for two buildings on Highland Street …

Proposed

Publicker site data center (1301 Main St., Linfield, Limerick Township)

Limerick Township, Montgomery County

191.46 acres

🕒 Sept 2026: Township agreed to the developer's request to delay hearings. The extension runs to Jan.…

Proposed

NorthPoint data center on Tresckow Mountain (Banks and Packer townships)

Banks Township, Carbon County

1,200 acres

🕒 Sept 30, 2025: NorthPoint met the public in Tresckow. About 150 people came; many said they do not want…

Being built

TierPoint TekPark data center expansion (Breinigsville, Upper Macungie Township)

Upper Macungie Township, Lehigh County

137 acres · for TierPoint customers (colocation)

🕒 Aug 2026: DEP asked for public comment on a stormwater permit for PPL's new Breinigsville-Tek Park…

Proposed

Pocono Manor data center (Pocono Manor Investors, Tobyhanna Township)

Tobyhanna Township, Monroe County

🕒 Dec 11, 2025: Tobyhanna Township supervisors voted on a data center ordinance for Pocono Manor.

Proposed

Lancaster AI Hub West (1375 Harrisburg Pike, Lancaster)

Lancaster, Lancaster County

for unknown (CoreWeave is the tenant at the Greenfield Road site)

🕒 Sept 2026: A resident group, Lancaster Residents Against Glut and Exhaust (RAGE), appealed the plan…

Stopped or cancelled

Data Centric LLC data center at Great Stream Commons (canceled)

Gregg Township, Union County

37 acres

🕒 Aug 2025: Union County got an official notice that the company pulled out of the deal.

Reported in the news, not confirmed yet

Status unclear

Plains Township data center site (KSR)

Plains Township, Luzerne County

🕒 Sept 22, 2026: Packed hearing on a 592-acre Energy and Technology Overlay District. Land purchases in t…

Reported in the news, not confirmed yet

Proposed

Salem 4 data center site (Moores 109 LLC, Salem Township)

Salem Township, Luzerne County

185 acres

Reported in the news, not confirmed yet

Status unclear

Londonderry Township data center (Dauphin County)

Londonderry Township, Dauphin County

🕒 Aug 4, 2025: Public hearing on a data center overlay ordinance. The township said no data center appl…

Reported in the news, not confirmed yet

Proposed

Nescopeck / Valley View Wood data center (Nescopeck Township)

Nescopeck Township, Luzerne County

Reported in the news, not confirmed yet

Proposed

Wilkes-Barre data center site (Avison Young)

Wilkes-Barre, Luzerne County

Reported in the news, not confirmed yet

Proposed

Outrigger data center (Mifflin Township, Columbia County)

Mifflin Township, Columbia County

Reported in the news, not confirmed yet

Built & running

Mawson / Big Digital Energy bitcoin mine and AI site (Midland)

Midland, Beaver County

for Bitcoin mining and hosting customers; an unnamed AI customer

Reported in the news, not confirmed yet

Proposed

West Finley Township data center proposal (Next Generation Land Company)

West Finley Township, Washington County

147 acres

🕒 March 12, 2026: Residents protested in Washington, Pa., as county commissioners met privately with data …

Reported in the news, not confirmed yet

Being built

Homer City Energy Campus (gas power plant + Amazon data center campus)

Center, Indiana County

3,200 acres · for Amazon Web Services (AWS says it is in talks; no final deal announced)

🕒 Aug 28, 2026: Amazon filed a master plan with the county for 39 two-story data center buildings on abo…

Approved, not built yet

Springdale Dynamo data center (former Cheswick power plant)

Springdale, Allegheny County

50 acres

🕒 June 10, 2026: Developer showed new designs: generators moved to the ground, lower building, closed-loo…

Being built

Project Phoenix data center campus (former Bruce Mansfield power plant)

Shippingport, Beaver County

660 acres

🕒 Sept 21, 2026: Shippingport leaders approved phase 2 of Aligned's land development plan while neighbors…

Built & running

TECfusions Keystone Connect (former Alcoa research campus)

Upper Burrell, Westmoreland County

1,395 acres

🕒 Oct 4, 2026: Draft ordinance would require 500-foot setbacks from property lines, 1,000 feet from res…

Proposed

Switch Big Beaver data center campus (former Pitt Race track)

Big Beaver, Beaver County

382 acres

🕒 Aug 24, 2026: Switch filed plans for three buildings of about 201,690 square feet each, with 270 megaw…

Proposed

Midland data center proposal (former J&L / steel mill land)

Midland, Beaver County

🕒 2026: Residents packed a Midland Borough Council meeting about a zoning change for a data cent…

Proposed

Aliquippa data center and gas plant proposal (former J&L Steel mill site)

Aliquippa, Beaver County

89 acres

🕒 2025: Developers said they hoped to start building on the old mill land later in 2025, with a …

Status unclear

CNX Zediker Station Road site (marketed for a data center)

South Strabane, Washington County

1,400 acres

🕒 June 10, 2026: Supervisors unanimously adopted data center and noise rules, including a 1,500-foot setb…

Approved, not built yet

Project Hummingbird (former Robena Mine)

Monongahela, Greene County

1,400 acres · for unknown (developer said it was talking with seven possible customers)

🕒 Dec 19, 2025: Greene County Planning Commission voted 8-1 to approve phase 1: grading 309 acres, two g…

Proposed

Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine)

Scrubgrass, Venango County

650 acres

🕒 Sept 22, 2026: Keel held community meetings at the Clintonville Fire Hall. It projected 591 jobs at ful…

Approved, not built yet

Keel Sharon AI data center (former Westinghouse plant, Clark Street)

Sharon, Mercer County

18 acres

🕒 June 29, 2026: Bitcoin mining at Sharon stopped; the company plans to turn the 110 megawatt site into a…

Proposed

Prime Data Centers campus at Starpointe Business Park

Hanover, Washington County

120 acres

🕒 Oct 1, 2026: Residents' lawyers said up to 12 old gas wells may be on or near the site; the developer…

Proposed

Glassworks Data Campus (former Owens-Illinois glass plant)

Clarion, Clarion County

185 acres

🕒 Jan 30, 2026: Concept plans made public: about 100 acres in phase 1 plus 85 more, up to 700 megawatts,…

Reported in the news, not confirmed yet

Approved, not built yet

Iron City Wells AI data center with gas generators

Karthaus, Clearfield County

🕒 Jan 30, 2026: DEP issued an air quality plan approval for 15 gas generators at an 'A.I. data center' (…

Proposed

Misty Hollow Energy and Data Campus

Forward, Butler County

274 acres

🕒 Oct 1, 2026: Planning commission heard 45 speakers, nearly all against, and tabled its recommendation…

Proposed

Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property')

Elizabeth, Allegheny County

549 acres

🕒 Oct 5, 2026: Public records showed plans for 11 to 28 two-story data center buildings (smallest optio…

Reported in the news, not confirmed yet

Proposed

Iron City No. 2 data center with gas generators

Beccaria, Clearfield County

🕒 July 18, 2026: DEP invited public comments (deadline August 17, 2026) on an air permit for 15 gas gener…

Proposed

Pine Creek Township data center proposal (Sulgar Road)

Pine Creek, Jefferson County

🕒 June 23, 2026: Residents raised concerns at the Jefferson County Commissioners meeting. The county has …

Reported in the news, not confirmed yet

Status unclear

Stonebridge data center campus at Powder Mill Works (former dynamite factory)

North Beaver, Lawrence County

🕒 Sept 10, 2026: North Beaver zoning hearing board denied the developer's appeal; Mahoning's board also d…

Proposed

Saadia Holdings 'mini data center' proposal

Union, Lawrence County

🕒 Sept 21, 2026: Saadia Holdings presented its plan for a 'mini data center' in Union Township.

Reported in the news, not confirmed yet

Proposed

EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park)

Allenport, Washington County

400 acres

🕒 Aug 14, 2026: Coal Center became the last of six towns (Stockdale, Roscoe, Dunlevy, Allenport, Elco, C…

Reported in the news, not confirmed yet

Proposed

Nadara data center site near Gans (Fay-Penn land)

Springhill, Fayette County

830 acres

🕒 Sept 19, 2026: Supervisors unanimously adopted data center and power generation ordinances.

Status unclear

Fort Cherry Development District gas power plant for data centers (Liberty Energy / Imperial Land / Range Resources)

Robinson, Washington County

🕒 April 8, 2025: Liberty Energy, Imperial Land Corporation and Range Resources announced plans for a gas …

The rules in Pennsylvania

What the state says about data centers, in plain words.

📜 State laws

Governor's order on data centers (Executive Order 2026-05) · Aug 18, 2026
Signed August 18, 2026. It covers data centers that need more than 25 megawatts of power. The state environment agency (DEP) will not issue permits until the project has all its local zoning approvals. Developers can sign a legally binding deal with DEP to follow the governor's GRID rules: pay the full cost of new power and power lines, be open with neighbors, hire local workers, and protect water and air. Developers who do not sign wait longer and must first show any water permits. Data centers were removed from the state's 'Fast Track' permit program. State agencies under the governor may not sign secret deals (NDAs) about data centers. DEP must keep a public map of data center permits. The order does not cover towns, counties or school boards, and it is not a law passed by the legislature, so a future governor could change it. Source

GRID rules for data centers (governor's standards) · May 27, 2026
GRID stands for the Governor's Responsible Infrastructure Development rules. They were announced February 3, 2026, and spelled out May 27, 2026. A law firm summary says they ask developers to: get new power from nearby sources, with a rising share of clean, always-on power (10% in 2027, 14.5% in 2030, 32% in 2035); pay for power lines and hookups; say who will use the building and how much power and water it will use; hold extra public meetings; invest at least $250 million; create at least 200 construction jobs at prevailing wage and 50 permanent jobs; and negotiate community benefit agreements on traffic, noise, lighting and emergency plans. Source

New law: data centers must report energy and water use (SB 146, 2026 budget) · July 12, 2026
Passed with the state budget and signed July 12, 2026. Data centers with more than 10 megawatts of peak power must send DEP a yearly report on electricity, natural gas and water use, where the water comes from, and plans to save energy and water. The first reports are due July 1, 2027. A data center that does not report can be fined $10,000 a day. DEP will publish a yearly statewide summary. Reports also say the law lets the utility commission (PUC) ask for power-demand forecast data. This was the only data center law the legislature passed in 2026. Source

HB 1834: make data centers pay their own power costs (passed House) · March 24, 2026
Would have the PUC write rules so power companies cannot pass data center grid costs on to other customers, and would require data centers to buy a growing share of clean power (10% in 2027, 14.5% in 2030, 32% in 2035). The House passed it 104 to 95 in March 2026. It is waiting in the Senate. Source

HB 2650: turn the GRID rules into law (passed House) · June 24, 2026
Would put the governor's GRID rules into state law and make the data center sales tax break depend on following them, with yearly reports. The House passed it in June 2026 (reported vote 134 to 68). It is waiting in the Senate. Source

HB 2496: let towns pause data center applications for 180 days (passed House) · June 2026
Would let a town or township put a 6-month pause on new data center zoning applications while it writes rules. The House passed it 201 to 1. It cleared a Senate committee but has not had a full Senate vote. Source

SB 1345 / HB 2533: optional 18-month local pause (moratorium) · Sept 28, 2026
Would let towns pause both new and not-yet-approved data center applications for up to 18 months while they update zoning on power, water, noise and setbacks. SB 1345 passed two Senate committees (10 to 1, then 13 to 4) and was waiting for a final Senate vote in late September 2026. Some groups say it has too many exceptions for developers. HB 2533 is the House version. Source

SB 1359: 3-year statewide pause on big data centers (introduced) · June 2026
Would stop the siting and permitting of very large (hyperscale) data centers for three years. It was filed in June 2026 and has not had a vote. Source

HB 2359: no secret deals (NDAs) with local officials (passed House) · June 2026
Would stop data center companies from getting the sales tax break if they have a secret deal (NDA) with local officials. It would also require a 'community protection plan', public meetings, and yearly water and power reports. The House passed it 171 to 31. It is waiting in the Senate. Source

SB 1408: ban secret deals (NDAs) by state and local governments · Oct 5, 2026
Would ban any state or local government agency from signing a secret deal (NDA) about a data center. Later versions add local public hearings before approval, limits on companies controlled by certain foreign countries, and energy and water reports. It cleared the Senate Communications and Technology Committee and was re-reported with changes on October 5, 2026. No full Senate vote yet. Source

HB 2198 and HB 1667: end the data center sales tax break (not passed) · June 29, 2026
The House voted 197 to 5 for HB 2198 to repeal the data center sales tax break. The Senate voted 44 to 6 for a tax bill (HB 1667) with the same repeal, plus a ban on data centers getting Keystone Opportunity Zone property tax breaks. But the two chambers never agreed on one final bill, so the tax break is still in place. Source

Other House data center bills (2026) · Oct 1, 2026
HB 2150 (energy and water reports) became part of the budget law. HB 2151 (a state model zoning ordinance for towns) and HB 2246 (DEP permits and reports for data center water use) passed the House and wait in the Senate. On October 1, 2026, the House Energy Committee passed HB 2775 (developers must apply and pay for a power hookup before asking for zoning) and HB 2828 (data centers pay grid upgrade costs and cut power first in emergencies). HB 2674 would stop data centers from becoming 'public utilities', which could let them take land by eminent domain. Source

Governor's 'Lightning Plan' energy bills (2025) · March 11, 2025
In 2025 the governor proposed a set of energy bills called the 'Lightning Plan'. One (HB 502, introduced April 2025) would create a state board, the RESET Board, to speed up permits for new power plants and power lines. We did not find proof that these bills became law. Source

💡 Who pays for the power

PUC 'model rules' for power hookups to data centers · May 13, 2026
The Pennsylvania Public Utility Commission (PUC) voted 5 to 0 on April 30, 2026, and released its final order May 12-13, 2026 (case M-2025-3054271). It covers customers over 50 megawatts, or 100 megawatts for a group of nearby buildings. The idea: if an upgrade would not be needed 'but for' the data center, the data center pays for it. A law firm summary lists: pay at least 80% of the power it signed up for each month; a contract of at least 5 years after a 3-5 year ramp-up; money held as a deposit to cover grid costs; an exit fee if it leaves early; and $250,000 to $1,000,000 a year toward help programs for low-income customers. These are guidelines, not binding rules. Each power company must still file its own rules with the PUC. Source

PUC public hearing on data centers (April 2025) · April 2025
In late April 2025, the PUC held a special hearing with all commissioners (an 'en banc' hearing) on how to hook up data centers and other very large power users, and how they should pay. Groups with a stake in the issue gave testimony. This hearing led to the PUC's 2026 model rules. Source

PPL rate increase and new data center customer class (2026) · June 4, 2026
On June 4, 2026, the PUC voted 5 to 0 to approve a settled PPL rate increase starting July 1, 2026. One report says a typical home bill rises about $7 a month, from $177.01 to $184.49 (another report says about $6.48). PPL had asked for more. The deal creates a new rate class for customers using 50 megawatts or more (like data centers) that must pay the costs of serving them, with contracts of at least 10 years. Starting in 2027, these large customers will pay $11 million a year toward help for low-income customers. PPL cannot file another base rate case for two years. Source

PECO asks for a rate increase partly to serve data centers (pending) · March 30, 2026
On March 30, 2026, PECO asked the PUC for $429 million more a year for its electric system and $81 million for gas, starting in 2027. PECO says a typical home electric bill would rise $20.08 a month (12.5%). PECO said upgrades are needed in part for growing AI data centers. The PUC has not decided. You can comment on this case at the PUC. Source

Why supply prices jumped: the regional power auction (PJM) · July 14, 2026
PJM runs the power grid for Pennsylvania and 12 other states. Each year it holds an auction to pay power plants to be ready for peak days. The price went from about $29 per megawatt-day (2024-25) to $269.92 (2025-26), then hit a price cap: $329.17 (2026-27), $333.44 (2027-28) and $325 (2028-29). The cap came from a deal PJM made with the governors of its states, approved by federal regulators. The last two auctions still came up short of the power PJM says it needs (6,831 megawatts short for 2028-29). PJM's independent market monitor says data centers caused $29.4 billion, or 46%, of auction costs over the last four auctions. These costs show up in the 'supply' or 'generation' part of your bill. Source

Supply price changes on June 1, 2025 · June 1, 2025
On June 1, 2025, the 'price to compare' (the supply price if you have not picked a supplier) went up about 12.6% for PECO, about 16% for PPL (to 12.49 cents per kilowatt-hour), and about 8% for Met-Ed. Duquesne Light's went up over 15%, from 8.45 to 9.71 cents, or about $9 a month for a typical home. These jumps followed the record 2025-26 PJM auction price. Source

Supply price changes on June 1, 2026 · June 1, 2026
On June 1, 2026, the price to compare changed again (cents per kilowatt-hour, for homes): Met-Ed 12.97 to about 13.95 (+7.6%); Penelec 11.75 to about 13.14 (+11.9%); Penn Power 12.61 to about 13.48 (+6.9%); West Penn Power 10.95 to about 12.08 (+10.3%); PPL 12.95 to 13.15 (+1.5%); Duquesne Light to 14.14 (+2.8%). PECO said its price to compare rose to 11.76 cents and a typical home bill rose $4.94 a month (3.1%). These numbers come from news and price-comparison sites; check your own bill or PAPowerSwitch for your exact price. Source

Governor asks PUC: data centers first in line to be cut in emergencies · Aug 18, 2026
The governor's August 2026 order tells his energy lawyer to push the PUC for rules so that, in a power emergency, data centers are cut off before homes unless they brought their own new power. It also asks that data centers, not other customers, pay for PJM's emergency 'backstop' power purchase, even if a data center goes broke. These are requests; the PUC decides. Source

Office of Consumer Advocate: your lawyer at the PUC · Oct 6, 2026
The Office of Consumer Advocate (OCA) is a state office, set up in 1976, that represents home utility customers in PUC rate cases, at federal regulators, and in court. It works on electric, gas, water and phone cases, including data center cost cases. You can call it toll-free at 1-800-684-6560 or email consumer@paoca.org. Source

💵 Tax breaks

Sales tax break on data center computers and equipment · Jan 1, 2022
Pennsylvania's 6% sales tax does not apply to computer equipment bought for a certified data center. The program was created by Act 84 of 2016 as a refund and changed by Act 13 of 2019 and Act 25 of 2021. Since January 1, 2022, it is a full exemption. To qualify, a data center must invest at least $75 million and create 25 jobs in a county with 250,000 people or fewer, or $100 million and 45 jobs in a bigger county, and pay at least $1 million a year in wages. The state expects it to cost $188.4 million in 2026-27, growing to about $517 million a year by 2030-31, or about $2 billion total by mid-2031. As of August 2026, 14 data center sites held a certificate. Source

New tax break applicants must follow GRID rules · Aug 18, 2026
Under the governor's August 2026 order, the Department of Revenue must make anyone who applies for the sales tax break on or after August 18, 2026, follow the GRID rules. Bills to repeal the tax break passed the House and the Senate in different forms in 2026, but none became law. Source

Local property tax breaks (KOZ and others) · June 2026
Data centers may also seek local property tax breaks, such as a Keystone Opportunity Zone, which can waive property taxes for 10 years or more. A 2026 Senate tax bill would have banned this for data centers, but it did not become law. Ask your county, town and school district if any tax break or payment deal (PILOT) has been offered. Source

🤐 Secret deals and public records

Secret deals (NDAs): what is and is not banned · Aug 18, 2026
Since August 18, 2026, state agencies under the governor may not sign secret deals (NDAs) about data centers. This does not cover towns, townships, counties, school boards, water authorities or private landowners. Bills to ban local NDAs (HB 2359 and SB 1408) have not become law. You can ask your local government, in writing, whether it signed an NDA and for a copy. Source

Right-to-Know Law: how to get public records · 2008
Under Pennsylvania's Right-to-Know Law, any legal resident of the United States can ask a state or local agency for records. You do not have to say why. The agency must answer within 5 business days. It can take up to 30 more calendar days if it says why (for example, legal review). If it does not answer in time, that counts as a denial. Agencies may charge only for copies and postage, not for staff time to review records. Source

If your records request is denied · 2008
You can appeal to the state Office of Open Records within 15 business days of a denial (or a 'deemed' denial when the agency does not answer). Requests to the legislature and courts have their own appeal rules. After the Office of Open Records decides, either side can go to court within 30 days (Commonwealth Court for state agencies, county court for local agencies). Source

Sunshine Act: public meetings · 2021
Town councils, township supervisors, school boards and authorities must vote in public meetings that are announced ahead of time. Since a 2021 change (Act 65), they must post the agenda at least 24 hours before the meeting. You have a right to comment at public meetings. Closed-door 'executive sessions' are allowed only for reasons the law lists. Source

State map of data center permits · Sept 2026
DEP runs a public map of data center projects that have contacted DEP or the Department of Revenue, with their permit stage. In September 2026 the governor's office counted 100+ data centers reported by the public, 20 in active state permitting and 5 with first-phase permits. Source

💧 Water

Susquehanna River Basin Commission (central PA) · 2026
In the Susquehanna River basin (much of central and northeast PA), a project needs approval from the Susquehanna River Basin Commission (SRBC) if it uses up (evaporates or consumes) 20,000 gallons a day or more on average over 30 days, or takes 100,000 gallons a day or more from a well or stream. This applies even if the data center buys water from a public water system. As of early 2026, SRBC had approved only one large data center (Amazon Web Services in Salem Township). SRBC posts applications in its online viewer, holds public hearings about a month before its quarterly meetings, and takes written comments for 10 days after a hearing. Source

Delaware River Basin Commission (eastern PA) · 2026
In the Delaware River basin (Philadelphia area, Lehigh Valley, Poconos), the Delaware River Basin Commission (DRBC) must review projects that take more than 100,000 gallons a day on average over 30 days, or discharge more than 50,000 gallons a day of wastewater (10,000 in some protected waters). DRBC lists projects to be heard at public hearings; you can sign up for email alerts. Source

DEP and water (western PA and everywhere) · Aug 18, 2026
Western PA (the Ohio River basin, including Pittsburgh) has no river basin commission. There, DEP permits for wastewater discharges and stormwater are the main state checks. Under the governor's order, data centers that do not sign a GRID deal must show their water approvals before DEP even starts reviewing other permits. Starting July 1, 2027, data centers over 10 megawatts must report yearly water use to DEP. A House bill (HB 2246) for a special DEP data center water permit has not passed the Senate. Source

🌫️ Air and generators

DEP air permits for backup generators and gas turbines · 2026
In Pennsylvania, you may not build a new source of air pollution, such as diesel backup generators or a gas power plant, without DEP approval first. This first approval is called a 'plan approval'. Small burners (2.5 million BTU per hour or less) are exempt. DEP must print a notice of each plan approval application in the Pennsylvania Bulletin, and anyone can send comments for 30 days after it is published. Bigger plants may also need a federal-level operating permit (Title V). In Allegheny County, the county Health Department also handles air permits; Philadelphia has its own city air program (check locally). Source

State is reviewing rules for data center generators · Aug 18, 2026
The governor's August 2026 order tells DEP to study whether backup generator rules need cleaner technology, whether they count the combined pollution from many generators at one site or nearby sites, and what happens when generators run to help the grid. GRID projects must use zero-emission batteries or backup power that meets the rules. No new rule has been proposed yet. Source

🙋 How to have your say

Who decides a data center in your town · 2022
Pennsylvania zoning follows a state law called the Municipalities Planning Code (MPC). Your elected council or supervisors (the 'governing body') decide rezonings, zoning law changes, conditional uses and land development plans. A separate zoning hearing board decides variances, special exceptions, appeals of the zoning officer, and most challenges to the zoning law. Find out which one handles your project: ask the municipal office or read the public notice. Source

Hearings: become a 'party' so you can appeal · 2022
Zoning hearings must be publicly advertised, and a notice must be posted on the land at least one week before. At the hearing, 'parties' are the town, anyone affected who makes a timely appearance on the record, and others the board allows, including community groups. Sign in as a party (some boards use a written form). Parties can have a lawyer, present evidence, and question the developer's witnesses. Usually only parties can appeal later. A written decision is due within 45 days after the last hearing. Source

Appeal deadline: 30 days · 2022
An appeal of a zoning or conditional use decision goes to the county Court of Common Pleas and must be filed within 30 days after the decision is entered. Courts apply this deadline strictly. To challenge an approval before the zoning hearing board, you generally also have 30 days. Owners or tenants of the affected land can join (intervene in) an appeal within 30 days after it is filed. A judge can make people who appeal post a bond if the appeal is found frivolous. Source

Watch for 'curative amendments' · 2022
A landowner or developer who says a zoning law unfairly blocks a use can file a 'curative amendment' with the governing body, which must start a hearing within 60 days. This can be used when a town's zoning has no place for data centers. Towns that adopt data center rules can lower this risk. Watch public notices for these hearings. Source

Local approval now comes before state permits · Aug 18, 2026
Under the governor's order, DEP will not issue permits for a data center over 25 megawatts until the project shows it fits the local comprehensive plan and has all local zoning and land development approvals. That makes your local hearing the first and most important place to speak up. Source

How to file a Right-to-Know request · 2008
1) Find the agency's open records officer (on its website or ask the office). 2) Send a written request by email, mail, fax or in person. The Office of Open Records has a standard request form. 3) Describe the records clearly, for example: 'all NDAs, letters and emails with [company] about a data center, January 2025 to today.' 4) You must be a legal US resident; you do not have to say why you want them. 5) Mark your calendar: answer due in 5 business days, or up to 30 more days if the agency extends. 6) If denied, appeal to the Office of Open Records within 15 business days. Source

How to speak up at the utility commission (PUC) · 2026
Rate cases (like PECO's 2026 request) and data center power rules are decided at the PUC. Look up the case number on the PUC website. You can send a written comment to the case, speak at a public input hearing if one is held, or file a formal complaint to become a party. The Office of Consumer Advocate represents home customers in these cases and can tell you about hearings (1-800-684-6560). Source

How to comment on state and river basin permits · 2026
DEP air plan approvals are announced in the Pennsylvania Bulletin with a 30-day comment period. Check DEP's data center permit map to see which permits a project has applied for. For water use, SRBC and DRBC hold public hearings; SRBC takes written comments up to 10 days after its hearing. The governor's office also has an online form to share data center concerns. Source

🧾 Help with your bills

LIHEAP heating help · Nov 2, 2026
A one-time cash grant of $200 to $1,000, paid straight to your utility or fuel company. The 2025-26 season ran December 3, 2025, to May 8, 2026. The 2026-27 season is scheduled to open November 2, 2026. Income limits (2025-26): $23,940 a year for 1 person, $49,500 for 4, plus $8,520 for each extra person. Apply online at COMPASS, call 1-866-857-7095, or visit your County Assistance Office. Source

LIHEAP crisis grants (emergencies) · 2026
Extra help if your heat is shut off or about to be, you are almost out of fuel (less than 15 days), or your heater is broken. Help comes within 10 business days, faster in a life-threatening emergency. If you already got LIHEAP this season, call your County Assistance Office. Source

Your utility's Customer Assistance Program (CAP) and other help · 2026
Each big Pennsylvania electric company has a low-income Customer Assistance Program (CAP) that lowers your monthly bill based on your income, plus hardship funds and free home energy-saving work. Call the number on your bill and ask for 'CAP', 'hardship fund' or 'low-income usage reduction'. Under PPL's 2026 settlement, the $14 reconnection fee is waived for customers at or below 150% of the poverty line, and data centers will pay $11 million a year toward low-income help starting in 2027. Source

Dollar Energy Fund hardship grants · 2026
A nonprofit that gives grants toward utility bills. It partners with Duquesne Light, Met-Ed, Penelec, Penn Power, West Penn Power, Citizens' Electric, Columbia Gas, Peoples, and several water companies. Contact your utility first, then apply online or through a local agency. You need proof of income and a copy of your bill. Phone: 1-888-282-6816. Source

Free home weatherization (WAP) · 2026
The state's Weatherization Assistance Program pays for air sealing, insulation, heating system repair or replacement, and safety fixes. The average job is about $8,547 per home. Older adults, people with disabilities, families with children and high energy users get priority. Renters can apply with landlord permission. Apply through the weatherization agency for your county; expect a waitlist. Source

Shop for a lower supply price (PAPowerSwitch) · 2026
PAPowerSwitch is the PUC's official site to compare your utility's 'price to compare' with offers from other suppliers. Enter your ZIP code. A fixed-price contract can protect you from June and December price jumps, but read the end date and any cancel fee. Be careful with 'variable' prices, which can rise a lot. Source

📞 Who to contact

Pennsylvania Public Utility Commission (PUC) · Oct 6, 2026
Sets electric, gas and water rates and the rules for hooking up data centers. Takes comments and complaints about utilities. Source

Office of Consumer Advocate (OCA) · Oct 6, 2026
Represents home utility customers at the PUC and in court. Toll-free 1-800-684-6560; consumer@paoca.org. Source

Department of Environmental Protection (DEP) · Oct 6, 2026
Issues air, water discharge and stormwater permits. Runs the data center permit map and will collect yearly energy and water reports. Source

DEP Air Quality Permits Division · Oct 6, 2026
Air permits for generators, turbines and power plants. Phone 717-787-9702; RA-EPAir@pa.gov. Source

Office of Open Records (OOR) · Oct 6, 2026
Hears appeals when an agency denies a Right-to-Know request. Has standard request and appeal forms. Source

Department of Revenue - data center tax break · Oct 6, 2026
Runs the data center sales tax exemption. Office of Economic Development: 717-772-3896; ra-rv-datacenter@pa.gov. Source

Governor's data center page and feedback form · Oct 6, 2026
The governor's order, GRID rules, permit map, and an online form to share data center concerns. Source

Susquehanna River Basin Commission (SRBC) · Oct 6, 2026
Approves large water use in the Susquehanna basin. Search applications in its WAAV viewer. Source

Delaware River Basin Commission (DRBC) · Oct 6, 2026
Reviews large water use and discharges in the Delaware basin. Sign up for hearing alerts. Source

Department of Human Services - LIHEAP · Oct 6, 2026
Heating bill grants and crisis help. Hotline 1-866-857-7095. Source

Department of Community and Economic Development (DCED) · Oct 6, 2026
Runs weatherization help and must publish best practices for local data center zoning and community benefit agreements under the governor's order. Source

Pennsylvania General Assembly · Oct 6, 2026
Look up bills (like SB 1345, HB 2359, SB 1408) and find your state senator and representative. Source