ProposedBig (AI-size): 480 megawatts

Slate Belt Holdings data center campus (Upper Mount Bethel Township)

Also called: River Pointe Data Center, River Pointe Logistics Center, Talen Slate Belt Holdings campus, Amazon data center at River Pointe (earlier, dropped 2025)

Slate Belt Holdings, a partnership of Talen Energy and the River Pointe Logistics team, wants to build up to 23 data center buildings on about 754 acres near Bangor. Each building would be about 201,500 square feet. The company is challenging the township's zoning rules in front of the zoning hearing board.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

🗓️ Next meeting of the people who decide: Thursday, December 17, 2026 (time not announced)

Upper Mount Bethel Township Zoning Hearing Board

📍 Not yet announced. The Oct. 19 session was at the Mount Bethel Volunteer Fire Co. hall.

Date reported by WFMZ; no official notice found yet.

The board meets on this day, but we don't know yet if this project is on the agenda. Call the office to check before you go.

Source

Where things stand: Proposed Two zoning challenges say township zoning unlawfully shuts out data centers: Slate Belt Holdings (753 acres, filed July 2026) and RPL East (152 acres, filed Oct. 2026). Supervisors rejected the developer's proposed agreement (MOU) in Sept. 2026. No approvals yet.

❓ 4 open questions about it: see below.

Last checked Oct 26, 2026.

🕒 Latest update (Oct 19, 2026): The zoning hearing board adjourned the hearing on Slate Belt Holdings' zoning challenge. A board member asked that the township supervisors decide the challenge instead. The developer agreed to a 60-day extension, and the board plans to meet again on Dec. 17.

What we know

  • 📍 WhereRiver Pointe Logistics Center site (former Portland Generating Station land) outside Bangor, Upper Mount Bethel Township, Northampton County
  • 🏢 CompanySlate Belt Holdings LLC
  • 🏛️ Owned byPartnership of Talen Energy and the River Pointe Logistics team
  • 🌳 Size905 acres
  • ⚡ Power it needs480 megawatts (about as much as 384,000 homes)
  • 🔌 Where the power comes fromPlanned 480 megawatt substation on site; Talen's Lower Mount Bethel gas power plant is nearby

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • What approvals has it applied for? 🙋 I'll find out ·
  • When will the zoning hearing board hear RPL East's challenge for the old Portland power plant site? 🙋 I'll find out ·
  • What will the zoning hearing board decide on the Slate Belt Holdings challenge? 🙋 I'll find out ·
  • Will the Upper Mount Bethel supervisors agree to decide Slate Belt Holdings' zoning challenge instead of the zoning hearing board? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 6, 2026: We checked the Delaware River Basin Commission's (DRBC) list of pending applications (August 2026): there is no application for this data center. DRBC said in November 2025 it had not received any data center applications. A data center needs its own DRBC approval only if it takes more than 100,000 gallons a day from its own wells or streams, or discharges more than 50,000 gallons a day (lower limits in some protected areas). Buying water from a water company does not need a separate DRBC approval.

    What happened so far

    • 2019
      River Pointe bought the land to build an industrial park (it once planned up to 15 buildings).
    • April 28, 2025
      Township supervisors said Amazon, long rumored to want a data center at River Pointe, had dropped it because there was not enough power.
    • April 2026
      Slate Belt Holdings (Talen Energy and River Pointe) bought about 755 acres from River Pointe.
    • July 2026
      Slate Belt Holdings filed a zoning challenge with the township zoning hearing board, showing plans for 23 data center buildings on 754 acres.
    • Aug 24, 2026
      Supervisors voted 3-2 not to drop talks on a non-binding deal (memorandum of understanding) with the developer. They also said they would fight the zoning challenge. The developer gave the township 30 more days on the challenge.
    • Sept 2026
      Township supervisors rejected the proposed memorandum of understanding (MOU) from Slate Belt Holdings. Under it, the company would have dropped its zoning challenge.
    • Oct 8, 2026
      RPL East LLC, owned by the same group as River Pointe, filed a second zoning challenge for about 152 acres at 5027 River Road, the old Portland power plant site. A concept plan shows up to six data center buildings, battery storage and substations. Slate Belt Holdings says both sites are part of one 2-gigawatt campus of about 905 acres.
    • Oct 19, 2026
      The zoning hearing board adjourned the hearing on Slate Belt Holdings' zoning challenge. A board member asked that the township supervisors decide the challenge instead. The developer agreed to a 60-day extension, and the board plans to meet again on Dec. 17.

    Local votes and rules

    📜 Data center rules

    Upper Mount Bethel Township is working on rules for data centers. As of March 2026 the draft was still under review and not yet passed.

    March 2026
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    2018–20202021–2023
    Photos: PEMA / PASDA, Pennsylvania aerial photos.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something