🙋 Help out in Pennsylvania
Some answers only a local person can get. Pick a task and press "I'll do it". We email you a task code and everything you need. When you find the answer, send it in, and we add it for everyone to see.
455 open questions in Pennsylvania, by county. Other states
Open tasks by county
Luzerne County
- ❓ Where exactly in Salem Township is the 185-acre Salem 4 site?
About Salem 4 data center site (Moores 109 LLC, Salem Township) in Salem Township - ❓ Who is behind Moores 109 LLC, and who would use the data center?
About Salem 4 data center site (Moores 109 LLC, Salem Township) in Salem Township - ❓ How many buildings and megawatts are planned?
About Salem 4 data center site (Moores 109 LLC, Salem Township) in Salem Township - ❓ When will supervisors consider the zoning change?
About Salem 4 data center site (Moores 109 LLC, Salem Township) in Salem Township - ❓ Did the Oct. 27, 2026 overlay vote include the 185-acre Moores 109 (Salem 4) site?
About Salem 4 data center site (Moores 109 LLC, Salem Township) in Salem Township - ❓ Will NorthPoint apply to the zoning hearing board for a special exception?
About Project Hazelnut (NorthPoint, Hazle Township) in Hazle Township - ❓ What will Commonwealth Court decide on NorthPoint's appeal?
About Project Hazelnut (NorthPoint, Hazle Township) in Hazle Township - ❓ Will NorthPoint keep or withdraw its pending water application at the Susquehanna River Basin Commission (No. 2025-149)?
About Project Hazelnut (NorthPoint, Hazle Township) in Hazle Township - ❓ Will Hazle Township supervisors adopt the data center rules by the Dec. 7, 2026 deadline, and with what setback?
About Project Hazelnut (NorthPoint, Hazle Township) in Hazle Township - ❓ How many buildings, how much power and water?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ Can residents appeal the permits, and by when?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ How many megawatts will the data center use, and how much water?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ Will anyone challenge Newport Township's April 2026 zoning change in court?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ When will Fit Energy file land development plans with Newport Township?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ The state environmental agency (DEP) lists a second Newport Township data center called 'Newport Ridge' (NorthPoint / Invenergy). Is it a separate project from Fit Energy's campus, and where is it?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ Fit Energy says it bought about 2,700 acres, but earlier reports said the campus would use about 1,386 acres. How much land will the data center use?
About Fit Energy fuel cell power and data center project (Newport Township) in Newport Township - ❓ Who will build and use the campus?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - ❓ How much water will it use, and will wells be affected?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - ❓ What power lines and power plants would be needed for up to 4 gigawatts?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - 📄 Was an agreement to keep the plans private (NDA) signed?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - ❓ What was the vote count on the Oct. 27, 2026 overlay expansion, and which ordinance covers which land?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - 📄 Will the $43 million community benefits agreement be signed and made public?
About Salem 3 data center campus (4-3 Glennbrook Group) in Salem Township - ❓ Which property in Wilkes-Barre is being marketed or planned for a data center?
About Wilkes-Barre data center site (Avison Young) in Wilkes-Barre City - ❓ Who is the developer or buyer?
About Wilkes-Barre data center site (Avison Young) in Wilkes-Barre City - ❓ Has the city received any zoning request?
About Wilkes-Barre data center site (Avison Young) in Wilkes-Barre City - ❓ Is this DEP entry the 67-69 Public Square tower, which Avison Young is marketing for data center use?
About Wilkes-Barre data center site (Avison Young) in Wilkes-Barre City - ❓ Does the new owner (Shell) still plan a data center at Hunlock Creek?
About Hunlock Creek power plant data center idea (Castleton Commodities, Hunlock Township) in Hunlock Township - ❓ How big would it be?
About Hunlock Creek power plant data center idea (Castleton Commodities, Hunlock Township) in Hunlock Township - ❓ Has an application been filed with Luzerne County?
About Hunlock Creek power plant data center idea (Castleton Commodities, Hunlock Township) in Hunlock Township - ❓ When will Luzerne County Council vote on the data center zoning rules?
About Hunlock Creek power plant data center idea (Castleton Commodities, Hunlock Township) in Hunlock Township - ❓ Who is the developer of the Nescopeck / Valley View Wood data center?
About Nescopeck / Valley View Wood data center (Nescopeck Township) in Nescopeck Township - ❓ How many acres and buildings are planned?
About Nescopeck / Valley View Wood data center (Nescopeck Township) in Nescopeck Township - ❓ Has anything been filed with Nescopeck Township?
About Nescopeck / Valley View Wood data center (Nescopeck Township) in Nescopeck Township - ❓ Who is KSR, and what land has it bought in Plains Township?
About Plains Township data center site (KSR) in Plains Township - ❓ When will commissioners vote on the overlay district?
About Plains Township data center site (KSR) in Plains Township - ❓ Is this linked to the KSR Capital-backed company that dropped the Great Stream Commons deal?
About Plains Township data center site (KSR) in Plains Township - ❓ Will the judge let the land buyer continue the appeal?
About Sugarloaf Township data center (Tomhicken Road) in Sugarloaf Township - ❓ Who would build a data center there now?
About Sugarloaf Township data center (Tomhicken Road) in Sugarloaf Township - ❓ Which data center company, if any, is behind the landowners?
About Hollenback Township landowner rezoning for data centers in Hollenback Township - ❓ What has the court decided?
About Hollenback Township landowner rezoning for data centers in Hollenback Township - ❓ What will Luzerne County Court decide in Brewster's zoning case?
About Brewster Land Company data center challenge (Dorrance Township) in Dorrance Township - ❓ How many megawatts will it use, and where will the power come from?
About QTS data center campus (Salem 2), Salem Township in Salem Township - ❓ How much water will it use? Has it applied to the Susquehanna River Basin Commission?
About QTS data center campus (Salem 2), Salem Township in Salem Township - ❓ Who is the end user?
About QTS data center campus (Salem 2), Salem Township in Salem Township - ❓ Will new high-voltage power lines be built?
About QTS data center campus (Salem 2), Salem Township in Salem Township - 📄 Did township officials sign an agreement to keep the plans private (NDA)?
About QTS data center campus (Salem 2), Salem Township in Salem Township - ❓ Which water company will serve the QTS campus, and how much water will it need to fill its closed-loop cooling systems?
About QTS data center campus (Salem 2), Salem Township in Salem Township - ❓ What happens to the data centers when the nuclear plant's licenses end (2042-2044)?
About Amazon (AWS) Salem Township campus next to Susquehanna nuclear plant in Salem Township - ❓ Will new high-voltage power lines be built?
About Amazon (AWS) Salem Township campus next to Susquehanna nuclear plant in Salem Township - 📄 Did state or local officials sign an agreement with Amazon to keep the plans private (NDA)?
About Amazon (AWS) Salem Township campus next to Susquehanna nuclear plant in Salem Township - ❓ Has DEP issued Amazon's industrial wastewater permit, and will cooling water go to the Berwick sewer plant or the Susquehanna River?
About Amazon (AWS) Salem Township campus next to Susquehanna nuclear plant in Salem Township - ❓ Could the request come back after the borough adopts its data center rules?
About West Hazleton data center site (behind Valmont Shopping Plaza) in West Hazleton Borough - ❓ DEP still lists this site as a proposed data center. Is the request really withdrawn?
About West Hazleton data center site (behind Valmont Shopping Plaza) in West Hazleton Borough - ❓ Will it be converted to an AI data center?
About Nautilus Cryptomine (bitcoin mining at Susquehanna nuclear plant) in Salem Township - ❓ How much water and noise does it produce?
About Nautilus Cryptomine (bitcoin mining at Susquehanna nuclear plant) in Salem Township
Cumberland County
- ❓ What will be in the water discharged toward Carlisle?
About PAX-1 data center campus (Middlesex Township) in Middlesex Township - ❓ Who is the end user?
About PAX-1 data center campus (Middlesex Township) in Middlesex Township - ❓ What did the court decide?
About PAX-1 data center campus (Middlesex Township) in Middlesex Township - ❓ Will the developer ask the Susquehanna River Basin Commission to approve its water use? (As of October 2026, SRBC's public list shows no data center application here; only the township authority's pending request for a new Well 2.)
About PAX-1 data center campus (Middlesex Township) in Middlesex Township - ❓ Will the judge pause construction after the Nov. 13, 2026 hearing?
About PAX-1 data center campus (Middlesex Township) in Middlesex Township - ❓ Who made the offer?
About Farm data center offer (Silver Spring Township) in Silver Spring Township - ❓ How big would it be?
About PA Data Center Partners / PowerHouse data center (Monroe Township, Cumberland) in Monroe Township - ❓ What approvals are needed?
About PA Data Center Partners / PowerHouse data center (Monroe Township, Cumberland) in Monroe Township - ❓ Who is the developer?
About Airport Road data center zoning request (Southampton Township, Cumberland County) in Southampton Township - ❓ How big is it?
About Airport Road data center zoning request (Southampton Township, Cumberland County) in Southampton Township - ❓ When will the hearing resume?
About Airport Road data center zoning request (Southampton Township, Cumberland County) in Southampton Township
Lackawanna County
- ❓ Who is the end user?
About Project Green Mountain (Archbald) in Archbald Borough - ❓ Who owns Green Mountain 6 LLC?
About Project Green Mountain (Archbald) in Archbald Borough - ❓ How loud will 196 diesel generators be for neighbors?
About Project Green Mountain (Archbald) in Archbald Borough - ❓ When will hearings end and council vote?
About Project Green Mountain (Archbald) in Archbald Borough - 📄 Was an agreement to keep the plans private (NDA) signed?
About Project Green Mountain (Archbald) in Archbald Borough - ❓ Will a data center application be filed?
About Triboro data center site (Olyphant) in Olyphant Borough - ❓ How much water and power would 'Project Triboro' need?
About Triboro data center site (Olyphant) in Olyphant Borough - ❓ Has Ercor Triboro filed a conditional use application, and when is the hearing?
About Triboro data center site (Olyphant) in Olyphant Borough - ❓ Reports have said both 12 and nine data centers. How many are actually planned?
About Triboro data center site (Olyphant) in Olyphant Borough - 📄 Will Olyphant Borough Council vote on the proposed settlement and $101 million community benefits agreement with ERCOR Triboro, and when?
About Triboro data center site (Olyphant) in Olyphant Borough - ❓ Who is the end user (tenant)?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ How much water will it really use each day, and from where?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ Will new high-voltage power lines be built, and who pays for them?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - 📄 Did any official sign an agreement to keep the plans private (NDA)?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ Will the Wildcat Ridge developer apply to the Susquehanna River Basin Commission to use mine pool water, and who pays for the $93 million in water upgrades?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ Will the Wildcat Ridge developer appeal the Oct. 21, 2026 denial to the Lackawanna County Court of Common Pleas?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ Has Cornell Realty Management appealed Archbald's Oct. 21, 2026 denial to the Lackawanna County Court of Common Pleas?
About Wildcat Ridge data center campus (Archbald) in Archbald Borough - ❓ Who is the tenant?
About Project Gravity (Archbald) in Archbald Borough - ❓ Has it applied for an air permit for its diesel generators?
About Project Gravity (Archbald) in Archbald Borough - ❓ Why was it removed from the state Fast Track program?
About Project Gravity (Archbald) in Archbald Borough - 📄 Was an agreement to keep the plans private (NDA) signed?
About Project Gravity (Archbald) in Archbald Borough - ❓ Has Project Gravity applied to the Susquehanna River Basin Commission? (Water lost to evaporation above 20,000 gallons a day needs SRBC approval.)
About Project Gravity (Archbald) in Archbald Borough - ❓ In January 2026 the developer estimated 360,000 gallons of water a day; in October 2026 Corscale said about 7,500 gallons a day. Which number is right for the final plan?
About Project Gravity (Archbald) in Archbald Borough - ❓ When will Archbald Borough Council vote on Project Gravity's final land development plan?
About Project Gravity (Archbald) in Archbald Borough - ❓ Who was the planned end user?
About Breaker Street data center campus (Jessup) in Jessup Borough - ❓ How much power and water will it use?
About Sunnyside Road data center (Jessup) in Jessup Borough - ❓ Will it buy power directly from the gas plant?
About Sunnyside Road data center (Jessup) in Jessup Borough - ❓ Who is the end user?
About Sunnyside Road data center (Jessup) in Jessup Borough - ❓ Who is challenging the Sunnyside Road approval in court, and what is the case about?
About Sunnyside Road data center (Jessup) in Jessup Borough - ❓ What will the court decide on the appeal?
About Project Scott (Archbald I LLC, 18 buildings) in Archbald Borough - ❓ Is a second application under the older 2023 zoning still alive?
About Project Scott (Archbald I LLC, 18 buildings) in Archbald Borough - ❓ Who would the end user be?
About Project Scott (Archbald I LLC, 18 buildings) in Archbald Borough - ❓ How much power and water would it use?
About Project North (Archbald I LLC, 4 buildings near the Jermyn line) in Archbald Borough - ❓ When will Archbald decide on the Project North zoning permits?
About Project North (Archbald I LLC, 4 buildings near the Jermyn line) in Archbald Borough - ❓ How much power would it use?
About Dickson City Development data center (Bell Mountain) in Dickson City Borough - ❓ What will the county court decide?
About Dickson City Development data center (Bell Mountain) in Dickson City Borough - ❓ Who is the end user?
About Dickson City Development data center (Bell Mountain) in Dickson City Borough - ❓ How much power and water would it use?
About Popca LLC data center campus (Newton Township) in Newton Township - ❓ Where is the appeal now (zoning board or county court), and when is the next hearing?
About Popca LLC data center campus (Newton Township) in Newton Township - ❓ How much water will it use?
About DBT-Data Lackawanna One (Jessup) in Jessup Borough - ❓ What are the plans for DBT's three other sites (Lackawanna Two, Three, Four)?
About DBT-Data Lackawanna One (Jessup) in Jessup Borough - ❓ What will the court decide?
About Scranton Materials data center campus (Ransom Township) in Ransom Township - ❓ How much power and water would it use?
About Scranton Materials data center campus (Ransom Township) in Ransom Township - ❓ Has DBT filed any plans for these sites?
About DBT-Data Lackawanna Two, Three and Four sites (Archbald/Jessup) in Archbald Borough - 📄 Did SLIBCO or the county sign an agreement to keep the plans private (NDA)?
About DBT-Data Lackawanna Two, Three and Four sites (Archbald/Jessup) in Archbald Borough - ❓ How many megawatts will the campus use in total?
About Project Gold (Clifton Township, Gouldsboro) in Clifton Township - ❓ Who is the end user?
About Project Gold (Clifton Township, Gouldsboro) in Clifton Township - ❓ Will new high-voltage power lines be needed?
About Project Gold (Clifton Township, Gouldsboro) in Clifton Township - ❓ What happened to the Covington Township part of the plan?
About Project Gold (Clifton Township, Gouldsboro) in Clifton Township - ❓ What is the status of residents' challenge to the settlement?
About Project Gold (Clifton Township, Gouldsboro) in Clifton Township - ❓ Could a data center plan come back for this land?
About Mudiita data center campus idea (Ransom Township) in Ransom Township - ❓ Has PNK filed a data center application?
About PNK Group data centers (Valley View Business Park, Archbald) in Archbald Borough - ❓ How much power and water would it use?
About PNK Group data centers (Valley View Business Park, Archbald) in Archbald Borough - ❓ What is the current approval status?
About Project Boson (Archbald) in Archbald Borough - ❓ How much power and water will it use?
About Project Boson (Archbald) in Archbald Borough - ❓ Who is the end user?
About Project Boson (Archbald) in Archbald Borough - ❓ Is any data center plan still being considered for this land?
About Blakely data center campus in Blakely Borough
Washington County
- ❓ When is the next continued conditional use hearing, and when will supervisors vote?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ How many old gas wells are under or near the site, and are they safe?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ How much water will it use and from where?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ When will DEP decide on the air permit for the 105 gas engines, and is there a public comment period?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ Who is the tenant?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - 📄 Did Hanover Township or the county sign an agreement to keep the plans private (NDA)?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ Did the supervisors who went on the developer-paid trip report it on their yearly financial interest forms?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ The Observer-Reporter now says the gas power plant would be 350 megawatts; earlier reports said 450. Which is right?
About Prime Data Centers campus at Starpointe Business Park in Hanover Township - ❓ What exactly does EQT Ventures plan to build, and how big would it be?
About EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park) in Allenport Borough - ❓ Would it include a gas power plant?
About EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park) in Allenport Borough - ❓ How much water would it take from the Monongahela River?
About EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park) in Allenport Borough - ❓ What will the new joint zoning rules require, and when will they be voted on?
About EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park) in Allenport Borough - 📄 Did any of the six towns sign an agreement to keep the plans private (NDA)?
About EQT option on former Wheeling-Pittsburgh Steel mill land (Mon River Industrial Park) in Allenport Borough - ❓ Has any data center company made an offer on the CNX land?
About CNX Zediker Station Road site (marketed for a data center) in South Strabane Township - ❓ Will the township pass a separate rule on gas power plants for data centers?
About CNX Zediker Station Road site (marketed for a data center) in South Strabane Township - 📄 Has CNX signed any agreement with a buyer or with local officials to keep the plans private (NDA)?
About CNX Zediker Station Road site (marketed for a data center) in South Strabane Township - ❓ Where exactly in West Finley Township is the 147-acre site?
About West Finley Township data center proposal (Next Generation Land Company) in West Finley Township - ❓ How would the data center get water and power?
About West Finley Township data center proposal (Next Generation Land Company) in West Finley Township - ❓ Has a formal application been filed with the township?
About West Finley Township data center proposal (Next Generation Land Company) in West Finley Township - ❓ When will the township vote on its new data center rules?
About West Finley Township data center proposal (Next Generation Land Company) in West Finley Township - ❓ Is a data center still planned at Fort Cherry, and who would build it?
About Fort Cherry Development District gas power plant for data centers (Liberty Energy / Imperial Land / Range Resources) in Robinson Township - ❓ How big would the power plant be, and has DEP received an air permit application?
About Fort Cherry Development District gas power plant for data centers (Liberty Energy / Imperial Land / Range Resources) in Robinson Township - ❓ Has Robinson Township received any zoning or land development application?
About Fort Cherry Development District gas power plant for data centers (Liberty Energy / Imperial Land / Range Resources) in Robinson Township
Northampton County
- ❓ Who is the developer and end user?
About Industrial Drive data center (2184 Industrial Drive, Bethlehem) in Bethlehem City - ❓ How much air pollution from on-site gas generation?
About Industrial Drive data center (2184 Industrial Drive, Bethlehem) in Bethlehem City - ❓ Who would use the Industrial Drive data center (the end user)?
About Industrial Drive data center (2184 Industrial Drive, Bethlehem) in Bethlehem City - ❓ When will the state approve the sewer plans and stormwater permit for the Industrial Drive data center?
About Industrial Drive data center (2184 Industrial Drive, Bethlehem) in Bethlehem City - ❓ How much water will the on-site gas turbines use each year?
About Industrial Drive data center (2184 Industrial Drive, Bethlehem) in Bethlehem City - ❓ How many megawatts and buildings?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ Will it take power directly from the Talen plant?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ How much water from the Delaware River? Will the Delaware River Basin Commission review it?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ Would the data center take water from the Martins Creek power plant's river intake, or from a public water company?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ When will the Lower Mount Bethel Planning Commission take up the rezoning petition for the data center land again?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ When will the Lower Mount Bethel planning commission take up the 284-acre rezoning petition?
About Lower Mount Bethel hyperscale data center (near Martins Creek power plant) in Lower Mount Bethel Township - ❓ How much power and water would the Commerce Center Boulevard data center use?
About Commerce Center Boulevard data center (Bethlehem) in Bethlehem City - ❓ Who would use the data center (the end user)?
About Commerce Center Boulevard data center (Bethlehem) in Bethlehem City - ❓ When will the Bethlehem Planning Commission review the plan?
About Commerce Center Boulevard data center (Bethlehem) in Bethlehem City - ❓ Would it have backup diesel generators or its own power plant?
About Commerce Center Boulevard data center (Bethlehem) in Bethlehem City - ❓ What approvals has it applied for?
About Slate Belt Holdings data center campus (Upper Mount Bethel Township) in Upper Mount Bethel Township - ❓ When will the zoning hearing board hear RPL East's challenge for the old Portland power plant site?
About Slate Belt Holdings data center campus (Upper Mount Bethel Township) in Upper Mount Bethel Township - ❓ What will the zoning hearing board decide on the Slate Belt Holdings challenge?
About Slate Belt Holdings data center campus (Upper Mount Bethel Township) in Upper Mount Bethel Township - ❓ Will the Upper Mount Bethel supervisors agree to decide Slate Belt Holdings' zoning challenge instead of the zoning hearing board?
About Slate Belt Holdings data center campus (Upper Mount Bethel Township) in Upper Mount Bethel Township - ❓ Who is the tenant?
About Prologis Lehigh Valley East 16 warehouse-to-data-center (Allen Township) in Allen Township - ❓ How many backup generators?
About Prologis Lehigh Valley East 16 warehouse-to-data-center (Allen Township) in Allen Township - ❓ Who will supply water to the Prologis data center at 2500 Liberty Drive, and how much will it use each day?
About Prologis Lehigh Valley East 16 warehouse-to-data-center (Allen Township) in Allen Township
Carbon County
- ❓ When will the zoning board hear Mele Brothers Realty's challenge?
About Penn Forest Township data center (Route 903 and Maury Road) in Penn Forest Township - ❓ Will Hendricks Group Developers file a data center plan with Penn Forest Township?
About Penn Forest Township data center (Route 903 and Maury Road) in Penn Forest Township - ❓ How much power and water would it use?
About DTA Alliance data center campus (Lower Towamensing Township) in Lower Towamensing Township - ❓ Would it have its own power plant?
About DTA Alliance data center campus (Lower Towamensing Township) in Lower Towamensing Township - ❓ Who is the end user?
About DTA Alliance data center campus (Lower Towamensing Township) in Lower Towamensing Township - ❓ Is the Bowmanstown site part of the same data center campus as the Lower Towamensing site, and how would they connect?
About DTA Alliance data center campus (Lower Towamensing Township) in Lower Towamensing Township - ❓ Will the power plant burn more fuel to run it?
About Keel Infrastructure Panther Creek / Carbon Node East data center (Nesquehoning) in Nesquehoning Borough - ❓ Has DEP issued the stream and wetland permits?
About Keel Infrastructure Panther Creek / Carbon Node East data center (Nesquehoning) in Nesquehoning Borough - ❓ How will Nesquehoning Borough supply the 700,000-gallon first fill without hurting home water service?
About Keel Infrastructure Panther Creek / Carbon Node East data center (Nesquehoning) in Nesquehoning Borough - ❓ Has NorthPoint formally asked Banks or Packer Township for a zoning overlay?
About NorthPoint data center on Tresckow Mountain (Banks and Packer townships) in Banks Township - ❓ Will it use a closed-loop cooling system, or take up to 2 million gallons a day from the Quakake Tunnel?
About NorthPoint data center on Tresckow Mountain (Banks and Packer townships) in Banks Township - ❓ How many buildings and megawatts are planned?
About NorthPoint data center on Tresckow Mountain (Banks and Packer townships) in Banks Township - ❓ Who is the end user?
About NorthPoint data center on Tresckow Mountain (Banks and Packer townships) in Banks Township
Dauphin County
- ❓ Who is the tenant that will use the data centers?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - ❓ How many megawatts of power will the site use?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - 📄 Did Swatara Township sign an agreement with the developer to keep the plans private (NDA)?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - ❓ Will new power lines be needed to serve the site?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - ❓ Corscale has given two totals for both Swatara sites ($10.5 billion in Sept. 2026 and $14.5 billion in Oct. 2026). Which is current?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - ❓ What are the 17 conditions Swatara Township attached to its Nov. 4, 2026 approval of the Highland Street data center?
About Corscale Highlands East data center (Highland Street, Swatara Township) in Swatara Township - ❓ Where will its water and power come from?
About Corscale Highlands West data center (Dauphin Highlands golf course, Swatara Township / Steelton) in Swatara Township - ❓ How much water and how many backup generators would the golf course site use?
About Corscale Highlands West data center (Dauphin Highlands golf course, Swatara Township / Steelton) in Swatara Township - ❓ Corscale has given two totals for both Swatara sites ($10.5 billion in Sept. 2026 and $14.5 billion in Oct. 2026). Which is current?
About Corscale Highlands West data center (Dauphin Highlands golf course, Swatara Township / Steelton) in Swatara Township - 🗓️ What did the Swatara Township Planning Commission recommend on the golf course data center plan at its Nov. 10, 2026 meeting, and when will commissioners vote?
About Corscale Highlands West data center (Dauphin Highlands golf course, Swatara Township / Steelton) in Swatara Township - ❓ How big would it be and how much power and water?
About HCI DP Land Acquisition data center (South Hanover Township quarry) in South Hanover Township - ❓ When is the zoning hearing?
About HCI DP Land Acquisition data center (South Hanover Township quarry) in South Hanover Township - ❓ Which landowners or developer want the data center, and on which land?
About Londonderry Township data center (Dauphin County) in Londonderry Township - ❓ Will the township vote on the revised overlay ordinance, and when?
About Londonderry Township data center (Dauphin County) in Londonderry Township - ❓ How big would it be?
About Londonderry Township data center (Dauphin County) in Londonderry Township
Chester County
- ❓ Will Aqua commit enough water?
About Sentinel / Green Fig data center at Foote Mineral Superfund site (East Whiteland) in East Whiteland Township - ❓ Is the Superfund site safely cleaned up?
About Sentinel / Green Fig data center at Foote Mineral Superfund site (East Whiteland) in East Whiteland Township - ❓ Who is the end user?
About Sentinel / Green Fig data center at Foote Mineral Superfund site (East Whiteland) in East Whiteland Township - ❓ Will the plan be downsized?
About Sentinel / Green Fig data center at Foote Mineral Superfund site (East Whiteland) in East Whiteland Township - ❓ What will the courts decide on the appeal and zoning challenges?
About Pennhurst data center (East Vincent Township) in East Vincent Township - ❓ What did the planning commission recommend, and has the board voted?
About Constellation Energy data center (East Coventry Township, near Limerick nuclear plant) in East Coventry Township - ❓ How many buildings and megawatts?
About Constellation Energy data center (East Coventry Township, near Limerick nuclear plant) in East Coventry Township - ❓ Would it take power directly from the nuclear plant?
About Constellation Energy data center (East Coventry Township, near Limerick nuclear plant) in East Coventry Township
Allegheny County
- ❓ How many buildings will actually be proposed, and how much power will they use?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ How much contamination is on the old landfill, and who pays for cleanup?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ Where will water come from (Youghiogheny River?) and how much per day?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ Does the township's zoning allow this, or will it need a zoning change?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - 📄 Did township officials sign an agreement to keep the plans private (NDA)?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ Who would be the tenant?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ Will the developer file a formal application with Elizabeth Township, and when?
About Elizabeth Township data center and gas plant proposal (former U.S. Steel landfill, 'Fiore Property') in Elizabeth Township - ❓ Who is the developer of the SEI Allegheny data center, and what does SEI stand for?
About SEI Allegheny data center (Findlay Township) in Findlay Township - ❓ Where exactly in Findlay Township is the site, and how many acres and buildings are planned?
About SEI Allegheny data center (Findlay Township) in Findlay Township - ❓ Has anything been filed with Findlay Township or Allegheny County?
About SEI Allegheny data center (Findlay Township) in Findlay Township - ❓ Will the Allegheny County Health Department require an air permit for the diesel generators, and how many generators are planned?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Who is the tenant or end user?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Where will the water come from and how much will it use per day?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Will new power lines or a new substation be needed?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - 📄 Did the borough sign an agreement to keep the plans private (NDA)?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Will the project ask for a tax break?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Which water company will supply the Springdale data center, and how many gallons a day will it need for top-ups once running?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough - ❓ Will Allegheny County approve, add conditions to, or deny the Springdale data center's preliminary land development plan?
About Springdale Dynamo data center (former Cheswick power plant) in Springdale Borough
Lycoming County
- ❓ What exactly was approved and when?
About Muncy data center (Muncy Township) in Muncy Township - ❓ How much power and water would it use?
About Muncy data center (Muncy Township) in Muncy Township - ❓ What did the court decide on the neighbors' appeal?
About Muncy data center (Muncy Township) in Muncy Township - ❓ What did the Lycoming County court decide on the developer's request (motion to quash) to throw out the neighbors' appeal of the deemed approval? A hearing was set for Nov. 6, 2026.
About Muncy data center (Muncy Township) in Muncy Township
Union County
- ❓ How much power will it use?
About PNK Group data center (Gregg Township, Union County) in Gregg Township - ❓ How many buildings could be added later?
About PNK Group data center (Gregg Township, Union County) in Gregg Township - ❓ How much will PPL's new Allenwood power line cost, and will any of that cost reach other PPL customers' bills?
About PNK Group data center (Gregg Township, Union County) in Gregg Township - ❓ Has Gregg Township posted its written decision with the 31 conditions for PNK's data center?
About PNK Group data center (Gregg Township, Union County) in Gregg Township - 📄 What will the community benefits agreement between PNK and Gregg Township say, and will it be public?
About PNK Group data center (Gregg Township, Union County) in Gregg Township - ❓ Is Data Centric or KSR Capital looking at other Pennsylvania sites (DEP lists a KSR project in Plains Township)?
About Data Centric LLC data center at Great Stream Commons (canceled) in Gregg Township
Bucks County
- ❓ How many megawatts will it use, and where will the power come from?
About Amazon (AWS) Falls Township campus (Keystone Trade Center) in Falls Township - ❓ How many diesel generators?
About Amazon (AWS) Falls Township campus (Keystone Trade Center) in Falls Township - 📄 Did township officials sign an NDA?
About Amazon (AWS) Falls Township campus (Keystone Trade Center) in Falls Township - ❓ Does Amazon's river water use need its own Delaware River Basin Commission docket, or is it covered by the old U.S. Steel water allocation?
About Amazon (AWS) Falls Township campus (Keystone Trade Center) in Falls Township - ❓ Has a formal application been filed for 215 Cathill Road?
About 215 Cathill Road data center (West Rockhill Township) in West Rockhill Township - ❓ How big would it be?
About 215 Cathill Road data center (West Rockhill Township) in West Rockhill Township
Mifflin County
- ❓ What will the zoning hearing board decide on the developer's appeal?
About PA Data Center Partners project (Loop Road, Granville Township) in Granville Township
Beaver County
- ❓ When will the Big Beaver planning commission and borough council vote on the land development plan?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ How much electricity will the campus use?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ Where will water come from, and could it affect private wells nearby?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ How many diesel generators make up the 270 megawatts of backup power, and how often will they be tested?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ Who is the tenant?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - 📄 Did the borough sign an agreement to keep the plans private (NDA)?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ Will Switch ask for a tax break?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ How much water will Switch need to fill its closed-loop cooling system at the start, and which water authority will supply it?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ What is the new deadline for Big Beaver Borough to act on Switch's land development plan?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ What did the Big Beaver planning commission recommend on Oct. 22, 2026, and when will Borough Council vote on Switch's plan?
About Switch Big Beaver data center campus (former Pitt Race track) in Big Beaver Borough - ❓ How much of the Midland site is moving from bitcoin mining to AI?
About Mawson / Big Digital Energy bitcoin mine and AI site (Midland) in Midland Borough - ❓ How much water and power does it use, and from where?
About Mawson / Big Digital Energy bitcoin mine and AI site (Midland) in Midland Borough - ❓ Does the borough have noise limits for the site?
About Mawson / Big Digital Energy bitcoin mine and AI site (Midland) in Midland Borough - ❓ How much water will the campus and gas plant take from the Ohio River each day?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - ❓ Has DEP issued an air permit for the gas power plant or fuel cells?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - ❓ Who is the tenant (which tech company)?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - ❓ How many diesel backup generators will there be?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - 📄 Did Shippingport Borough or Beaver County sign an agreement to keep the plans private (NDA)?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - ❓ Will the project get a property tax break (such as KOZ or LERTA)?
About Project Phoenix data center campus (former Bruce Mansfield power plant) in Shippingport Borough - ❓ What happened at the September 10 zoning hearing, and when will council vote?
About Midland data center proposal (former J&L / steel mill land) in Midland Borough - ❓ How big would the data center be and how much power would it use?
About Midland data center proposal (former J&L / steel mill land) in Midland Borough - ❓ Would it build its own gas power plant?
About Midland data center proposal (former J&L / steel mill land) in Midland Borough - ❓ Where would water come from?
About Midland data center proposal (former J&L / steel mill land) in Midland Borough - 📄 Did the borough sign an agreement to keep the plans private (NDA)?
About Midland data center proposal (former J&L / steel mill land) in Midland Borough - ❓ Has the developer filed any zoning or land development plans with the City of Aliquippa?
About Aliquippa data center and gas plant proposal (former J&L Steel mill site) in Aliquippa City - ❓ Who would own and use the data center?
About Aliquippa data center and gas plant proposal (former J&L Steel mill site) in Aliquippa City - ❓ Has DEP received an air permit application for the gas plant?
About Aliquippa data center and gas plant proposal (former J&L Steel mill site) in Aliquippa City - ❓ Where would water come from and how much per day?
About Aliquippa data center and gas plant proposal (former J&L Steel mill site) in Aliquippa City - 📄 Did the city sign an agreement to keep the plans private (NDA)?
About Aliquippa data center and gas plant proposal (former J&L Steel mill site) in Aliquippa City
Westmoreland County
- ❓ How many buildings and how much power will be built in each phase?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ Where will cooling water come from and how much per day?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ Will a gas power plant be built on site, and has DEP received an air permit application?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ Will new high-voltage power lines be needed?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - 📄 Did the township sign an agreement to keep the plans private (NDA)?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ What will the final data center ordinance require for noise and setbacks?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ What is the outcome of the court appeal?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - 📄 Will the township's Community Benefits Agreement with TECfusions be public, and what will it include?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ Do Upper Burrell's new data center rules (adopted Oct. 22, 2026) apply to the rest of the TECfusions campus beyond Building J?
About TECfusions Keystone Connect (former Alcoa research campus) in Upper Burrell Township - ❓ Where would the data center get its power? Would it use the nearby Tenaska gas plant?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township - ❓ Has DEP approved the sewage permit for the site?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township - ❓ How much water would it use per day?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township - ❓ Who would use the data center?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township - ❓ When will Westmoreland County review a site development plan?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township - 📄 Did township officials sign an agreement to keep the plans private (NDA)?
About Data center off Route 31 (South Huntingdon Township) in South Huntingdon Township
Butler County
- ❓ Which companies are behind the project, and who would use the data center?
About Misty Hollow Energy and Data Campus in Forward Township - ❓ How will wastewater be handled, and how much water will be used per day?
About Misty Hollow Energy and Data Campus in Forward Township - ❓ Has DEP received an air permit application for the 300 megawatt gas plant?
About Misty Hollow Energy and Data Campus in Forward Township - ❓ How loud will it be at nearby homes, day and night?
About Misty Hollow Energy and Data Campus in Forward Township - ❓ When will the township supervisors vote?
About Misty Hollow Energy and Data Campus in Forward Township - 📄 Did the township sign an agreement to keep the plans private (NDA)?
About Misty Hollow Energy and Data Campus in Forward Township
Blair County
- ❓ How big would the data center be and how much power would it use?
About Terawatt data center proposal at former Appvion paper mill in Taylor Township - ❓ Would it build its own gas power plant?
About Terawatt data center proposal at former Appvion paper mill in Taylor Township - ❓ Where would its water come from, and who gets water first in a drought?
About Terawatt data center proposal at former Appvion paper mill in Taylor Township - 🗓️ What happened at the October 5, 2026 township meeting?
About Terawatt data center proposal at former Appvion paper mill in Taylor Township - ❓ When will Terawatt file a land development plan with Taylor Township?
About Terawatt data center proposal at former Appvion paper mill in Taylor Township
Northumberland County
- ❓ How big is it and how much power and water would it use?
About FIT Energy data center (Natalie, Mount Carmel Township) in Mount Carmel Township - ❓ What approvals does it need and when is the next hearing?
About FIT Energy data center (Natalie, Mount Carmel Township) in Mount Carmel Township - ❓ Are the plans Blue Creek Investments filed on Oct. 9, 2026 for this data center, and where is the site?
About FIT Energy data center (Natalie, Mount Carmel Township) in Mount Carmel Township
Montgomery County
- ❓ When will the court and the zoning board hear MLP Ventures' appeal and variance requests?
About MLP Ventures data centers (Upper Merion Township) in Upper Merion Township - ❓ Has MLP Ventures filed a court appeal of the Aug. 13, 2026 denial?
About MLP Ventures data centers (Upper Merion Township) in Upper Merion Township - ❓ What will the Montgomery County Court of Common Pleas decide on MLP Ventures' lawsuit over the Aug. 13, 2026 denial?
About MLP Ventures data centers (Upper Merion Township) in Upper Merion Township - ❓ Could it be refiled?
About Data center at former steel mill, 900 Conshohocken Road (Plymouth Township) in Plymouth Township - ❓ Will the nearby county-owned quarry be sold to a data center developer?
About Data center at former steel mill, 900 Conshohocken Road (Plymouth Township) in Plymouth Township - ❓ When is the next Zoning Hearing Board session on 900 Conshohocken Road, and when will the board decide?
About Data center at former steel mill, 900 Conshohocken Road (Plymouth Township) in Plymouth Township - ❓ Who is the developer and end user?
About Undisclosed data center (Hanover Land Development site, Upper Hanover Township) in Upper Hanover Township - ❓ How big is it?
About Undisclosed data center (Hanover Land Development site, Upper Hanover Township) in Upper Hanover Township - ❓ When is the next hearing?
About Undisclosed data center (Hanover Land Development site, Upper Hanover Township) in Upper Hanover Township - ❓ Which parcel is the Upper Hanover data center on? The 37-acre Hanover Development LP field on Gravel Pike matches the news, but no filing names it.
About Undisclosed data center (Hanover Land Development site, Upper Hanover Township) in Upper Hanover Township - ❓ How big would it be (buildings, square feet, megawatts)?
About Data center campus on Front Street (West Conshohocken) in West Conshohocken Borough - ❓ On what date will borough council hold the conditional use hearing?
About Data center campus on Front Street (West Conshohocken) in West Conshohocken Borough - ❓ Is this site part of the same campus as MLP Ventures' Upper Merion plans that were denied in August 2026?
About Data center campus on Front Street (West Conshohocken) in West Conshohocken Borough - ❓ Where would its power come from, and would the gas fuel cells run all the time?
About Data center campus on Front Street (West Conshohocken) in West Conshohocken Borough - ❓ How much water would it use per day?
About Data center campus on Front Street (West Conshohocken) in West Conshohocken Borough - ❓ How much power (megawatts) would it use?
About Publicker site data center (1301 Main St., Linfield, Limerick Township) in Limerick Township - ❓ How much water would it use each day?
About Publicker site data center (1301 Main St., Linfield, Limerick Township) in Limerick Township - ❓ How many backup diesel generators are planned?
About Publicker site data center (1301 Main St., Linfield, Limerick Township) in Limerick Township - ❓ Who is the end user?
About Publicker site data center (1301 Main St., Linfield, Limerick Township) in Limerick Township - ❓ Who is the end user?
About Project Laurel (MCD 7 LLC, Limerick Township) in Limerick Township - ❓ Where exactly will the new power line cross the Schuylkill River?
About Project Laurel (MCD 7 LLC, Limerick Township) in Limerick Township - ❓ When will supervisors vote?
About Project Laurel (MCD 7 LLC, Limerick Township) in Limerick Township - ❓ Has Pennsylvania American Water issued an updated will-serve letter for Project Laurel, and will the campus use closed-loop cooling?
About Project Laurel (MCD 7 LLC, Limerick Township) in Limerick Township - ❓ When will Limerick Township hear MCD 7 LLC's two newer conditional use applications (CU 26-05 and CU 26-06)?
About Project Laurel (MCD 7 LLC, Limerick Township) in Limerick Township
Indiana County
- ❓ How much water per day will the power plant and the 39 data centers use from Two Lick Reservoir, and what happens in a drought?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ Has Amazon signed a final deal with Homer City Redevelopment?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ Will new high-voltage power lines be built, and where?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ How many diesel backup generators will the data centers have?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - 📄 What will the Community Benefits Agreement include, and who will sign it?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - 📄 Did Center Township, Black Lick Township or Indiana County sign an agreement to keep the plans private (NDA)?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ What is the status of the air permit appeal at the Environmental Hearing Board?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ Amazon filings have described both 39 buildings on about 2,200 acres and 36 buildings on about 1,100 acres. Which is the current plan?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - 📄 Will Indiana County adopt its proposed 'large utility load' land development amendment and NDA ban (a vote was reported as planned for November 18, 2026)?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ How much water will the new gas power plant take from Two Lick Creek each day?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township - ❓ Will the Indiana County Planning Commission approve or reject Amazon's data center plan by its 90-day deadline (about mid-January 2027)?
About Homer City Energy Campus (gas power plant + Amazon data center campus) in Center Township
Columbia County
- ❓ How big would it be, and where exactly?
About Outrigger data center (Mifflin Township, Columbia County) in Mifflin Township - ❓ Has Mifflin Township received a zoning request?
About Outrigger data center (Mifflin Township, Columbia County) in Mifflin Township - ❓ Did Mifflin Township give the site planning approval in July 2026 and a conditional use permit in August 2026, as the sale listing says?
About Outrigger data center (Mifflin Township, Columbia County) in Mifflin Township - ❓ Who will buy the site and use the data center?
About Outrigger data center (Mifflin Township, Columbia County) in Mifflin Township
Schuylkill County
- ❓ How much power and water will it use?
About Amazon (AWS) Kline Township campus in Kline Township - ❓ Will new power lines or a substation be built?
About Amazon (AWS) Kline Township campus in Kline Township - 📄 What does the county's NDA with Amazon cover? (You can ask for it with a Right-to-Know request.)
About Amazon (AWS) Kline Township campus in Kline Township - ❓ Which water supplier will serve the Amazon Kline Township campus, and has it signed a will-serve letter?
About Amazon (AWS) Kline Township campus in Kline Township - ❓ When will Amazon apply for its township zoning permit, and when will building start?
About Amazon (AWS) Kline Township campus in Kline Township - ❓ How many megawatts will it use? (A tracker lists 1.2 gigawatts.)
About Nebius 'AI factory' at Highridge Industrial Park (Butler Township, Schuylkill) in Butler Township - 📄 Will a community benefits agreement be signed, and what will it include?
About Nebius 'AI factory' at Highridge Industrial Park (Butler Township, Schuylkill) in Butler Township - ❓ Will new power lines be needed?
About Nebius 'AI factory' at Highridge Industrial Park (Butler Township, Schuylkill) in Butler Township - ❓ How many diesel generators are planned?
About Nebius 'AI factory' at Highridge Industrial Park (Butler Township, Schuylkill) in Butler Township - ❓ When will KRNL file plans?
About KRNL data center (New Castle Township, near Frackville) in New Castle Township - ❓ How big would it be, and how much power and water would it use?
About KRNL data center (New Castle Township, near Frackville) in New Castle Township
Lehigh County
- ❓ When will the planning commission and supervisors vote?
About Project Atlas (Edged, South Whitehall Township) in South Whitehall Township - ❓ Who is the end user?
About Project Atlas (Edged, South Whitehall Township) in South Whitehall Township - ❓ Will new high-voltage lines be needed for 725 megawatts?
About Project Atlas (Edged, South Whitehall Township) in South Whitehall Township - ❓ When will the South Whitehall planning commission take up the revised Project Atlas plan? (Decision deadline: Dec. 31, 2026.)
About Project Atlas (Edged, South Whitehall Township) in South Whitehall Township - ❓ How many backup generators?
About J.G. Petrucci data center (1024 N. Bradford St., Allentown) in Allentown City - ❓ How much water will it use?
About J.G. Petrucci data center (1024 N. Bradford St., Allentown) in Allentown City - ❓ When will the city vote?
About J.G. Petrucci data center (1024 N. Bradford St., Allentown) in Allentown City - ❓ Has the Lehigh County Authority given this data center a will-serve letter, and for how many gallons a day?
About J.G. Petrucci data center (1024 N. Bradford St., Allentown) in Allentown City - ❓ How many megawatts would it use? (A tracker lists 80 MW.)
About Quantm Group data center (2401 W. Emaus Ave., Allentown) in Allentown City - ❓ What cooling and backup generators are planned?
About Quantm Group data center (2401 W. Emaus Ave., Allentown) in Allentown City - ❓ When will the planning commission vote?
About Quantm Group data center (2401 W. Emaus Ave., Allentown) in Allentown City - ❓ Has the Lehigh County Authority given this data center a will-serve letter, and for how many gallons a day?
About Quantm Group data center (2401 W. Emaus Ave., Allentown) in Allentown City - ❓ How many new buildings will the expansion add?
About TierPoint TekPark data center expansion (Breinigsville, Upper Macungie Township) in Upper Macungie Township - ❓ How much water will the expanded site use?
About TierPoint TekPark data center expansion (Breinigsville, Upper Macungie Township) in Upper Macungie Township - ❓ How many diesel generators are on site?
About TierPoint TekPark data center expansion (Breinigsville, Upper Macungie Township) in Upper Macungie Township - ❓ Who will use the new space?
About TierPoint TekPark data center expansion (Breinigsville, Upper Macungie Township) in Upper Macungie Township
Venango County
- ❓ When will the remaining coal ash be removed, and what is DEP doing about the missed deadline?
About Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine) in Scrubgrass Township - ❓ Will the plant switch to natural gas, and has DEP received permit applications for a new gas plant or pipeline?
About Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine) in Scrubgrass Township - ❓ How much water would the campus take from the Allegheny River?
About Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine) in Scrubgrass Township - ❓ What local approvals will Scrubgrass Township need to give, and when will it vote?
About Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine) in Scrubgrass Township - ❓ How many diesel backup generators are planned?
About Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine) in Scrubgrass Township
Lawrence County
- ❓ How big will it be and how much power will it use?
About Saadia Holdings 'mini data center' proposal in Union Township - ❓ What approvals does Union Township need to give, and when?
About Saadia Holdings 'mini data center' proposal in Union Township - ❓ Will it have diesel backup generators near homes?
About Saadia Holdings 'mini data center' proposal in Union Township - ❓ Will Stonebridge appeal to the Lawrence County Court of Common Pleas or file a new plan under the stricter rules?
About Stonebridge data center campus at Powder Mill Works (former dynamite factory) in North Beaver Township - ❓ How much power and water would the campus use?
About Stonebridge data center campus at Powder Mill Works (former dynamite factory) in North Beaver Township - ❓ Who would use the data center?
About Stonebridge data center campus at Powder Mill Works (former dynamite factory) in North Beaver Township - 📄 Did either township sign an agreement to keep the plans private (NDA)?
About Stonebridge data center campus at Powder Mill Works (former dynamite factory) in North Beaver Township
Fayette County
- ❓ What exactly does Nadara plan to build, and would it include a gas power plant?
About Nadara data center site near Gans (Fay-Penn land) in Springhill Township - 📄 What are the terms of Fay-Penn's purchase agreement with Nadara, and did Fay-Penn sign an agreement to keep the plans private (NDA)?
About Nadara data center site near Gans (Fay-Penn land) in Springhill Township - ❓ Where would the water come from (Monongahela or Cheat River?) and how much per day?
About Nadara data center site near Gans (Fay-Penn land) in Springhill Township - ❓ Would new power lines be needed?
About Nadara data center site near Gans (Fay-Penn land) in Springhill Township
Wayne County
- ❓ Will Linde Corporation appeal the Sept. 9, 2026 denial in county court, or file a new plan?
About Linde Corporation 20-building data center campus (Clinton Township, Wayne County) in Clinton Township - ❓ What exactly did supervisors vote down, and can Linde Corporation appeal or file again?
About Linde Corporation 20-building data center campus (Clinton Township, Wayne County) in Clinton Township
Lancaster County
- ❓ What is the status of the second Greenfield Road data center and why was its hearing canceled?
About Lancaster AI Hub / CoreWeave data center (Greenfield Road, Lancaster) in Lancaster City - ❓ How will the city enforce the CBA?
About Lancaster AI Hub / CoreWeave data center (Greenfield Road, Lancaster) in Lancaster City - ❓ How big is the Harrisburg Pike data center (buildings, megawatts)?
About Lancaster AI Hub West (1375 Harrisburg Pike, Lancaster) in Lancaster City - 📄 Is it covered by the city's community benefits agreement and 20,000-gallon water cap?
About Lancaster AI Hub West (1375 Harrisburg Pike, Lancaster) in Lancaster City - ❓ Who will use it?
About Lancaster AI Hub West (1375 Harrisburg Pike, Lancaster) in Lancaster City - ❓ When will the zoning hearing board hear the residents' appeal?
About Lancaster AI Hub West (1375 Harrisburg Pike, Lancaster) in Lancaster City - ❓ Was the bid for a data center?
About McGinness Innovation Park bid (Columbia Borough) in Columbia Borough - ❓ Will the borough take new bids?
About McGinness Innovation Park bid (Columbia Borough) in Columbia Borough
Tioga County
- ❓ Which municipality is the site in?
About Alpha Compute data center campus (Tioga County) - ❓ Will it build its own gas power plant?
About Alpha Compute data center campus (Tioga County) - ❓ What local approvals are needed?
About Alpha Compute data center campus (Tioga County)
Delaware County
- ❓ Has PECO received a request for power service?
About Project Trainer (Ridge Road, Trainer Borough) in Trainer Borough - ❓ Will a formal application be filed?
About Project Trainer (Ridge Road, Trainer Borough) in Trainer Borough
Perry County
- ❓ What will the court decide on MRP Industrial's challenge to Watts Township's data center rules?
About MRP Industrial data center campus (Perry County) in Watts Township
Clearfield County
- ❓ Did DEP approve the air permit?
About Iron City No. 2 data center with gas generators in Beccaria Township - ❓ Where exactly is the site and how many megawatts will it use?
About Iron City No. 2 data center with gas generators in Beccaria Township - ❓ Has Beccaria Township or Clearfield County approved it?
About Iron City No. 2 data center with gas generators in Beccaria Township - ❓ Who will use the computing power?
About Iron City No. 2 data center with gas generators in Beccaria Township - ❓ Where exactly is the site, and how many megawatts will it use?
About Iron City Wells AI data center with gas generators in Karthaus Township - ❓ Is it a new AI data center or a converted crypto mine?
About Iron City Wells AI data center with gas generators in Karthaus Township - ❓ Has Karthaus Township or Clearfield County approved it?
About Iron City Wells AI data center with gas generators in Karthaus Township - ❓ Where will water come from?
About Iron City Wells AI data center with gas generators in Karthaus Township - ❓ Is it already running?
About Iron City Wells AI data center with gas generators in Karthaus Township
Mercer County
- ❓ Did Sharon City Council and the Mercer County Regional Planning Commission give final approval, and when?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City - ❓ How much water will the closed-loop cooling use, and from which water company?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City - ❓ How many diesel backup generators will be installed?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City - ❓ Who is the tenant?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City - 📄 Did the city sign an agreement to keep the plans private (NDA)?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City - ❓ Which water company will supply the Keel Sharon data center?
About Keel Sharon AI data center (former Westinghouse plant, Clark Street) in Sharon City
Jefferson County
- ❓ Who is the developer and how big is the project?
About Pine Creek Township data center proposal (Sulgar Road) in Pine Creek Township - ❓ Does Pine Creek Township have zoning that applies?
About Pine Creek Township data center proposal (Sulgar Road) in Pine Creek Township - 📄 Did any local officials sign an agreement to keep the plans private (NDA)?
About Pine Creek Township data center proposal (Sulgar Road) in Pine Creek Township - ❓ Where would the Pine Creek data center get water while Brookville's 180-day pause is in effect (until about December 2026)?
About Pine Creek Township data center proposal (Sulgar Road) in Pine Creek Township
York County
- ❓ Has the township voted on the zoning change?
About Rexroth Farms data center (Conewago Township, York County) in Conewago Township - ❓ How big would it be?
About Rexroth Farms data center (Conewago Township, York County) in Conewago Township - ❓ How many megawatts and buildings?
About York 2 Energy Center data center (Peach Bottom Township) in Peach Bottom Township - ❓ How much water from the Susquehanna River? Has SRBC approved it?
About York 2 Energy Center data center (Peach Bottom Township) in Peach Bottom Township - ❓ Who will own the York 2 power plant after Constellation sells it, and is the data center plan still going ahead?
About York 2 Energy Center data center (Peach Bottom Township) in Peach Bottom Township - ❓ Will the data center need its own water approval from the Susquehanna River Basin Commission, or will it share the power plant's river water?
About York 2 Energy Center data center (Peach Bottom Township) in Peach Bottom Township - ❓ Who is the developer?
About Briarwood golf course data center (West Manchester Township) in West Manchester Township - ❓ What approvals remain?
About Briarwood golf course data center (West Manchester Township) in West Manchester Township - ❓ Did the township change its zoning?
About Windsor Township data center (Elysian Partners) in Windsor Township - ❓ How big would it be?
About Windsor Township data center (Elysian Partners) in Windsor Township - ❓ Has a land development plan been filed?
About Fairview Crossroads data center (Fairview Township, York County) in Fairview Township - ❓ How big would it be?
About Fairview Crossroads data center (Fairview Township, York County) in Fairview Township
Berks County
- ❓ How big will it be?
About Titus Station AI data center campus (Cumru Township) in Cumru Township - ❓ How much water from the Schuylkill River?
About Titus Station AI data center campus (Cumru Township) in Cumru Township - ❓ When will plans be filed?
About Titus Station AI data center campus (Cumru Township) in Cumru Township
Lebanon County
- ❓ Could the land be offered to another data center developer?
About South Annville Township data center (Mount Pleasant Road) in South Annville Township
Monroe County
- ❓ What did the Zoning Hearing Board decide?
About Pennsylvania Glacial Till data center overlay (Tobyhanna Township) in Tobyhanna Township - ❓ Who is the data center developer and end user?
About Pennsylvania Glacial Till data center overlay (Tobyhanna Township) in Tobyhanna Township - ❓ How many buildings and megawatts are planned on the 520-acre Glacial Till site?
About Pennsylvania Glacial Till data center overlay (Tobyhanna Township) in Tobyhanna Township - ❓ Who is the developer?
About Smithfield Gateway data center (Route 209, Monroe County) in Smithfield Township - ❓ How big is it?
About Smithfield Gateway data center (Route 209, Monroe County) in Smithfield Township - ❓ Is it in Smithfield Township?
About Smithfield Gateway data center (Route 209, Monroe County) in Smithfield Township - ❓ How big would the Pocono Manor data center be?
About Pocono Manor data center (Pocono Manor Investors, Tobyhanna Township) in Tobyhanna Township - ❓ Who would build and use it?
About Pocono Manor data center (Pocono Manor Investors, Tobyhanna Township) in Tobyhanna Township - ❓ Where would its water and power come from?
About Pocono Manor data center (Pocono Manor Investors, Tobyhanna Township) in Tobyhanna Township - 📄 Did the township sign an agreement to keep the plans private (NDA)?
About Pocono Manor data center (Pocono Manor Investors, Tobyhanna Township) in Tobyhanna Township
Montour County
- ❓ Will Talen appeal or try a new location?
About Talen Energy data center rezoning (Anthony Township, Montour County) in Anthony Township - 📄 What did the NDA cover?
About Talen Energy data center rezoning (Anthony Township, Montour County) in Anthony Township
Clarion County
- ❓ Has any data center company agreed to use the site?
About Glassworks Data Campus (former Owens-Illinois glass plant) in Clarion Borough - ❓ Would a gas power plant be built on site?
About Glassworks Data Campus (former Owens-Illinois glass plant) in Clarion Borough - ❓ How would 1.2 million gallons a day affect the Clarion River and local water customers?
About Glassworks Data Campus (former Owens-Illinois glass plant) in Clarion Borough - ❓ What does Clarion Borough's January 2026 data center ordinance require?
About Glassworks Data Campus (former Owens-Illinois glass plant) in Clarion Borough - 📄 Did the borough sign an agreement to keep the plans private (NDA)?
About Glassworks Data Campus (former Owens-Illinois glass plant) in Clarion Borough
Greene County
- ❓ Has a data center tenant signed on?
About Project Hummingbird (former Robena Mine) in Monongahela Township - ❓ Has DEP issued air and water permits for the gas turbines and water plant?
About Project Hummingbird (former Robena Mine) in Monongahela Township - ❓ How much of the 18 million gallons a day will be lost to evaporation?
About Project Hummingbird (former Robena Mine) in Monongahela Township - ❓ Will there be diesel backup generators?
About Project Hummingbird (former Robena Mine) in Monongahela Township - 📄 Did Monongahela Township or Greene County sign an agreement to keep the plans private (NDA)?
About Project Hummingbird (former Robena Mine) in Monongahela Township - ❓ Will the project ask for a tax break?
About Project Hummingbird (former Robena Mine) in Monongahela Township
Bradford County
- ❓ How much water will the power plant and data center use? Has SRBC approved it?
About Wyalusing Energy Center / Klondike data center (Bradford County) in Wyalusing Township - ❓ Who is the end user?
About Wyalusing Energy Center / Klondike data center (Bradford County) in Wyalusing Township
📄 How to ask for public records in Pennsylvania
- Anyone who lives legally in the U.S. can ask. It's free to ask.
- Find the "Right-to-Know Officer" on your township, borough or county website.
- Send a short written request. Say exactly what you want, for example: "Any non-disclosure agreement about the data center project on Route 30, 2023 to today."
- They have 5 business days to answer. They may take 30 more days.
- If they say no, you can appeal to the Office of Open Records within 15 business days.
🦺 Stay safe: only take photos from public roads. Never go onto private land.