Proposed

Keel Scrubgrass AI data center campus (former waste-coal power plant and bitcoin mine)

Also called: Scrubgrass AI Campus, Bitfarms Scrubgrass, Stronghold Scrubgrass

An old waste-coal power plant in Scrubgrass Township that ran bitcoin mining is planned to become a 1.3 gigawatt AI data center campus on 650 acres. Owner Keel Infrastructure says it may switch the plant to natural gas. Neighbors are pressing the company about a coal ash pile it has not yet removed.

โœ” ConfirmedSourceLast checked: Oct 6, 2026

Where things stand: Bitcoin mining stopped June 29, 2026. Keel held public meetings in September 2026 for a 1.3 gigawatt AI campus; construction planned 2027-2032, first operations 2029. Township approvals still needed.

๐Ÿ•’ Latest update (Sept 22, 2026): Keel held community meetings at the Clintonville Fire Hall. It projected 591 jobs at full buildout and admitted it missed the September 1 deadline to remove about 150,000 tons of coal ash.

What we know

  • ๐Ÿ“ WhereScrubgrass power plant near Kennerdell, by the Allegheny River, Scrubgrass, Venango County
  • ๐Ÿข CompanyKeel Infrastructure (formerly Bitfarms; site bought from Stronghold Digital Mining in March 2025)
  • ๐Ÿ›๏ธ Owned byKeel Infrastructure Corp. (Nasdaq: KEEL)
  • ๐ŸŒณ Size650 acres
  • โšก Power it needs1,363 megawatts (about as much as 1,090,400 homes)
  • ๐Ÿ”Œ Where the power comes fromExisting waste-coal power plant (about 63 megawatts now). Company is 'seriously considering' switching the plant to natural gas and adding 550+ megawatts of gas power, with a 3-4 mile pipeline to the Tennessee Gas Pipeline.
  • โ„๏ธ CoolingClosed-loop cooling planned (company says it uses much less water than evaporative cooling)
  • ๐Ÿ‘ท Jobs promised591
  • ๐Ÿค Secret deal (NDA)No

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • March 2025
    Bitfarms bought the site from Stronghold Digital Mining.
  • April 1, 2026
    Bitfarms became part of Keel Infrastructure, which is moving from bitcoin mining to AI data centers.
  • June 2, 2026
    Company said Scrubgrass could grow to about 1,363 megawatts on 650 acres; it has done power studies with FirstEnergy up to 750 megawatts. A legal settlement requires removing an unpermitted coal ash pile by September 2026.
  • June 29, 2026
    Bitcoin mining at Scrubgrass stopped.
  • Sept 22, 2026
    Keel held community meetings at the Clintonville Fire Hall. It projected 591 jobs at full buildout and admitted it missed the September 1 deadline to remove about 150,000 tons of coal ash.

Local votes and rules

๐Ÿ“œ Data center rules

Scrubgrass Township, which has no zoning or planning commission, adopted an ordinance to govern how data centers are sited, built and run. It came as Keel Infrastructure (formerly Bitfarms) said its site near Kennerdell could become a 1.3-gigawatt AI data center campus. No permit application had been filed as of August 2026.

July 2026
๐Ÿ›ฐ๏ธ See it from above

Drag the slider to compare the land before and now.

2018โ€“20202021โ€“2023
We only know the town, so this shows the town center, not the exact site. Photos: PEMA / PASDA, Pennsylvania aerial photos.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. Keel outlines Scrubgrass data center plans as residents question plant's record ยท exploreClarion ยท Sept 23, 2026
  2. Scrubgrass could become area's largest AI data center campus ยท exploreClarion ยท June 2, 2026
  3. Keel Infrastructure Corp. Form 10-Q (quarter ended June 30, 2026) ยท U.S. SEC ยท 2026
  4. Keel Infrastructure: Scrubgrass AI Campus ยท Baxtel

See something wrong? Tell us and we'll fix it.