🙋 Help out in Georgia
Some answers only a local person can get. Pick a task and press "I'll do it". We email you a task code and everything you need. When you find the answer, send it in, and we add it for everyone to see.
333 open questions in Georgia, by county. Other states
Open tasks by county
Effingham County
- ❓ How much water will the cooling system need for its first fill and each year after, and where will it come from?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ Will new power plants or high-voltage power lines be built to serve it, and who pays?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - 📄 Did any official sign an agreement to keep the plans private (NDA) during the talks?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ How many diesel backup generators will the site have?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ Will the Army Corps hold a public hearing on the wetlands permit, and when will it decide?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ How many data center buildings are in the final plan? The Army Corps notice shows four; a news report on the county site plan says six.
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ What will Effingham County commissioners decide on the site plan on Nov. 17, 2026?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County - ❓ Will the developer put the 20-foot earthen berm along Hodgeville Road in writing?
About OpenAI data center campus near Rincon (Savannah Gateway Industrial Hub) in Unincorporated Effingham County
Bartow County
- ❓ Who is the end user (tenant)?
About Kingston Technology Hub (Thor Equities) in Kingston City - ❓ Will new power lines or a substation be built, and who pays?
About Kingston Technology Hub (Thor Equities) in Kingston City - 📄 Did any official sign an agreement to keep the plans private (NDA)?
About Kingston Technology Hub (Thor Equities) in Kingston City - 📄 Is the 561.51-acre annexation on the Kingston City Council agenda the Kingston Technology Hub site?
About Kingston Technology Hub (Thor Equities) in Kingston City - ❓ Did the city council approve the annexation of the 561.51 acres?
About Kingston Technology Hub (Thor Equities) in Kingston City - ❓ What was the Kingston City Council vote count on the special use permit?
About Kingston Technology Hub (Thor Equities) in Kingston City - ❓ Have residents filed a lawsuit against the Kingston approval?
About Kingston Technology Hub (Thor Equities) in Kingston City - ❓ Did the developer withdraw the request, or will the county commissioner vote on it?
About Brown Farm Road data center (Oakley Real Estate Partners) in Unincorporated Bartow County - ❓ Who is the end user?
About Brown Farm Road data center (Oakley Real Estate Partners) in Unincorporated Bartow County - ❓ When will Cartersville vote on the rezoning?
About Project Indo (DataBank) in Cartersville City - ❓ Who will use the data center?
About Project Indo (DataBank) in Cartersville City - ❓ Will it use diesel backup generators, and how many?
About Project Indo (DataBank) in Cartersville City - ❓ Who is the developer and who is the end user?
About Project Bunkhouse data center campus in Unincorporated Bartow County - ❓ How much power will it need, and where will it come from?
About Project Bunkhouse data center campus in Unincorporated Bartow County - ❓ Has the county approved the rezoning?
About Project Bunkhouse data center campus in Unincorporated Bartow County - ❓ What tax break is being negotiated with the development authority?
About Project Bunkhouse data center campus in Unincorporated Bartow County - ❓ How much power will it need?
About Project Springbank (Atlas Development) in Unincorporated Bartow County - ❓ Has Bartow County approved a rezoning?
About Project Springbank (Atlas Development) in Unincorporated Bartow County - ❓ Who is the end user?
About Project Springbank (Atlas Development) in Unincorporated Bartow County - ❓ Has construction started?
About Switch Atlanta North campus (KEEP 2.0) in Cartersville City - ❓ How much power will it use?
About Switch Atlanta North campus (KEEP 2.0) in Cartersville City - ❓ Does the 1.3 million gallons a day of water estimate still hold?
About Switch Atlanta North campus (KEEP 2.0) in Cartersville City
Richmond County
- ❓ Who is the end user (tenant)?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ How much water will it use per day, and what cooling system will it have?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ Do Augusta's new data center rules (adopted Oct. 6, 2026) apply to this application, which was filed Sept. 28?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ The news report says about 383 acres; the state filing says about 388 acres. Which is right?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ The developer's state filing lists about 600 MW of peak power. Has Georgia Power agreed to serve that much?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ How much water will the closed-loop cooling system need to fill and top up?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ When will the Augusta Commission vote on rezoning Z-26-18 and special exception SE-26-22?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ Will residents get another chance to speak after the state regional review ends and before the Planning Commission votes?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ Will Augusta publish an official notice for the Nov. 23, 2026 Planning Commission hearing, and where will it be held?
About Nixon Technology Center data center campus (Augusta) in Unincorporated Richmond County - ❓ Who is the developer behind Eagle South LLC and who is the end user?
About Project Eisenhower data center (former T5@Augusta site) in Unincorporated Richmond County - ❓ Is construction under way?
About Project Eisenhower data center (former T5@Augusta site) in Unincorporated Richmond County - ❓ How much power and water will it use?
About Project Eisenhower data center (former T5@Augusta site) in Unincorporated Richmond County
Fulton County
- ❓ How much power will it need, and who will supply it?
About The Crossing Business Park data center campus (Union City) in Union City City - ❓ How much water will it use per day, and what cooling system will it have?
About The Crossing Business Park data center campus (Union City) in Union City City - ❓ Who is the end user (tenant)?
About The Crossing Business Park data center campus (Union City) in Union City City - ❓ Is this the same project as the earlier 'The Crossings' filing (DRI #4617), which was terminated?
About The Crossing Business Park data center campus (Union City) in Union City City - ❓ When will Union City review the master plan, and will there be a public hearing?
About The Crossing Business Park data center campus (Union City) in Union City City - 📄 Did any official sign an agreement to keep the plans private (NDA)?
About The Crossing Business Park data center campus (Union City) in Union City City - ❓ How much power and water will it use?
About Microsoft ATL50 data center in Union City City - ❓ Is ATL50 part of the Microsoft campus already planned nearby?
About Microsoft ATL50 data center in Union City City - ❓ Does the city's ban on data centers near the Beltline and transit apply here?
About 1611 Ellsworth mixed-use project with data center in Atlanta City - ❓ How much power will the data center use?
About 1611 Ellsworth mixed-use project with data center in Atlanta City - ❓ Who is the end user?
About T5 ATL IV data center campus (Gullatt Road, Fairburn) in Fairburn City - ❓ Did it get a tax break?
About T5 ATL IV data center campus (Gullatt Road, Fairburn) in Fairburn City - ❓ Who is the end user?
About Stonewall Tell data center (RSC Investment Management) in South Fulton City - ❓ How much power will it use?
About Stonewall Tell data center (RSC Investment Management) in South Fulton City - ❓ Has South Fulton approved it?
About Stonewall Tell data center (RSC Investment Management) in South Fulton City - ❓ Has the city approved it, and has construction started?
About TA Realty ATL03 / Red Oak data center in Union City City - ❓ How much power will it use?
About TA Realty ATL03 / Red Oak data center in Union City City - ❓ How much power will it use?
About Vantage data center (Westlake site, South Fulton) in South Fulton City - ❓ Has construction started?
About Vantage data center (Westlake site, South Fulton) in South Fulton City - ❓ How much power will it use?
About Vantage data center (Stacks Road site, South Fulton) in South Fulton City - ❓ Has construction started?
About Vantage data center (Stacks Road site, South Fulton) in South Fulton City - ❓ When will the other two buildings open?
About Edged Atlanta data center campus (ATL01) in Atlanta City - ❓ Did the project get a tax break?
About Edged Atlanta data center campus (ATL01) in Atlanta City - ❓ Who is behind Burr Computer Environments?
About ATL11 data center (Stonewall Tell Road) in Union City City - ❓ Is this the same project as the Microsoft campus on Stonewall Tell Road?
About ATL11 data center (Stonewall Tell Road) in Union City City - ❓ Is it under construction?
About ATL11 data center (Stonewall Tell Road) in Union City City - ❓ Has Fairburn approved it?
About Fairburn Technology Center (Bohannon Drive) in Fairburn City - ❓ Who is the end user?
About Fairburn Technology Center (Bohannon Drive) in Fairburn City - ❓ How much power will it use?
About Fairburn Technology Center (Bohannon Drive) in Fairburn City - ❓ What tax break did the Development Authority of Fulton County approve?
About Microsoft Union City data center campus (Stonewall Tell Road) in Union City City - ❓ How much power will it use?
About Microsoft Union City data center campus (Stonewall Tell Road) in Union City City - ❓ Is construction under way?
About Microsoft Union City data center campus (Stonewall Tell Road) in Union City City
Putnam County
- ❓ When will the City of Eatonton hold a hearing on the rezoning and conditional use?
About Eatonton 379 data center campus in Eatonton City - ❓ The state list shows the site as unincorporated Putnam County, but the City of Eatonton filed it. Is the land inside city limits, or will it be annexed?
About Eatonton 379 data center campus in Eatonton City - ❓ Which company is behind Eatonton 379, LLC, and who is the end user (tenant)?
About Eatonton 379 data center campus in Eatonton City - ❓ Will Tri-County EMC or Georgia Power serve it, and will new power lines be built?
About Eatonton 379 data center campus in Eatonton City - ❓ What kind of power would be made on site, and how many diesel backup generators will there be?
About Eatonton 379 data center campus in Eatonton City - ❓ What cooling system will it use?
About Eatonton 379 data center campus in Eatonton City - 📄 Did any official sign an agreement to keep the plans private (NDA)?
About Eatonton 379 data center campus in Eatonton City
Coweta County
- ❓ How many diesel backup generators will there be?
About Project Peach data center campus (CyrusOne) in Unincorporated Coweta County - ❓ Was a tax break given?
About Project Peach data center campus (CyrusOne) in Unincorporated Coweta County - ❓ Will the developer appeal the return to rural zoning or apply again?
About Project Peach data center campus (CyrusOne) in Unincorporated Coweta County - ❓ Where exactly is the Coweta site?
About T5 ATL IV data center (Coweta County site) in Unincorporated Coweta County - ❓ On what date did commissioners approve the rezoning, and with what conditions?
About Project Sail data center campus (Prologis / Atlas Development) in Unincorporated Coweta County - ❓ How much water will the final plan use each day?
About Project Sail data center campus (Prologis / Atlas Development) in Unincorporated Coweta County - ❓ Has Prologis bought the land, and who is the end user?
About Project Sail data center campus (Prologis / Atlas Development) in Unincorporated Coweta County - ❓ What will Coweta County Superior Court decide in the residents' lawsuit against the Project Sail rezoning?
About Project Sail data center campus (Prologis / Atlas Development) in Unincorporated Coweta County - ❓ Will the probate court accept the residents' petition and call a vote on Coweta's data center rules?
About Project Sail data center campus (Prologis / Atlas Development) in Unincorporated Coweta County - ❓ Who is the developer and end user?
About Project Oak data center in Unincorporated Coweta County - ❓ Will the developer reapply after six months?
About Project Oak data center in Unincorporated Coweta County - ❓ Who is the developer and end user?
About Bridgeport data center campus (Bridgeport Industrial Park) in Unincorporated Coweta County - ❓ Does it need any new county vote, since the land is already zoned industrial?
About Bridgeport data center campus (Bridgeport Industrial Park) in Unincorporated Coweta County - ❓ Where will 1,500 megawatts of power come from?
About Bridgeport data center campus (Bridgeport Industrial Park) in Unincorporated Coweta County - ❓ When will Coweta County vote on the rezoning?
About Central Coweta Industrial Phase II data centers in Unincorporated Coweta County - ❓ How much power will it use?
About Central Coweta Industrial Phase II data centers in Unincorporated Coweta County - ❓ Who is the end user?
About Central Coweta Industrial Phase II data centers in Unincorporated Coweta County
Floyd County
- ❓ Where exactly on Huffaker Road is the site? A parcel number or map from the state filing helps.
About Microsoft data center (Huffaker Road, Rome area) in Unincorporated Floyd County - ❓ How many diesel backup generators will there be?
About Microsoft data center (Huffaker Road, Rome area) in Unincorporated Floyd County - ❓ The state filing gives a build-out value of $340 million; news in 2023 said $1 billion. Which is right?
About Microsoft data center (Huffaker Road, Rome area) in Unincorporated Floyd County - ❓ Does Microsoft need a rezoning or other county vote, and when is the hearing?
About Microsoft data center (Huffaker Road, Rome area) in Unincorporated Floyd County - ❓ What will the development authority do with the land now?
About Battey Business Complex data center (Atlas Development) in Rome City - ❓ Did the Floyd County Commission approve the rezoning on May 27, 2025?
About Coosa data center campus (Project Gracie, Atlas Development) in Unincorporated Floyd County - ❓ Will it really use 5 million gallons of water a day?
About Coosa data center campus (Project Gracie, Atlas Development) in Unincorporated Floyd County - ❓ How much power will it need?
About Coosa data center campus (Project Gracie, Atlas Development) in Unincorporated Floyd County - ❓ Has Atlas refiled anywhere nearby?
About Dixon data center (Atlas Development) in Unincorporated Floyd County
Bulloch County
- ❓ Who is the end user (tenant)?
About Burkhalter Road data center in Statesboro in Statesboro City - ❓ Which utility will supply the power, and will new power lines be needed?
About Burkhalter Road data center in Statesboro in Statesboro City - ❓ How many diesel backup generators will there be?
About Burkhalter Road data center in Statesboro in Statesboro City - ❓ When must the city answer the lawsuit, and when is the first court hearing?
About Burkhalter Road data center in Statesboro in Statesboro City - ❓ Has a special use permit been applied for?
About Burkhalter Road data center in Statesboro in Statesboro City - ❓ Will the court grant the developer's request to dismiss the residents' lawsuit?
About Burkhalter Road data center in Statesboro in Statesboro City
Cobb County
- ❓ On what date did council vote?
About Bells Ferry Road data center campus (Grindcap / MMM Acquisitions) in Marietta City - ❓ Who is the end user?
About Bells Ferry Road data center campus (Grindcap / MMM Acquisitions) in Marietta City - ❓ How many backup generators are planned?
About Bells Ferry Road data center campus (Grindcap / MMM Acquisitions) in Marietta City - 📄 What was in the four fully blacked-out pages of the city agenda item?
About Prime Storage data center (Delk Road) in Marietta City - ❓ Who will supply its power if not the city?
About Prime Storage data center (Delk Road) in Marietta City
Rockdale County
- ❓ How much power will it use?
About Project Rockforge data center campus (Grind Capital / MMM Acquisitions) in Unincorporated Rockdale County - ❓ Who is the end user?
About Project Rockforge data center campus (Grind Capital / MMM Acquisitions) in Unincorporated Rockdale County - ❓ Did the developer file a court appeal of the Oct. 6, 2026 denial, or will it apply again?
About Project Rockforge data center campus (Grind Capital / MMM Acquisitions) in Unincorporated Rockdale County - ❓ Was this project approved or dropped?
About Rockdale Technology Park 1 (Sigman Road) in Unincorporated Rockdale County - ❓ Is it under construction?
About DC BLOX Atlanta East data center (Farmer Road) in Unincorporated Rockdale County
Candler County
- ❓ Who is the developer or end user behind the site owners?
About Possible data center near Metter-Candler Airport in Unincorporated Candler County - ❓ When will the rezoning hearing be held?
About Possible data center near Metter-Candler Airport in Unincorporated Candler County - ❓ How many diesel backup generators will there be, and what noise limit will apply?
About Possible data center near Metter-Candler Airport in Unincorporated Candler County - ❓ How many megawatts will it use, and how much water will the on-site well pump?
About Possible data center near Metter-Candler Airport in Unincorporated Candler County - ❓ Who is behind this proposal, and has an application been filed with the City of Metter?
About Possible data center site in Metter (off East Hiawatha Street) in Metter City - ❓ How big would it be (acres, buildings, megawatts)?
About Possible data center site in Metter (off East Hiawatha Street) in Metter City - ❓ What will the Metter data center task force recommend?
About Possible data center site in Metter (off East Hiawatha Street) in Metter City
Wayne County
- 📄 Did the development authority sign an agreement to keep the plans private (NDA)?
About Possible data center at Wayne Commerce Center in Jesup in Jesup City - ❓ Is the site inside Jesup city limits, and which government's data center rules apply?
About Possible data center at Wayne Commerce Center in Jesup in Jesup City - ❓ How much power and water would it use?
About Possible data center at Wayne Commerce Center in Jesup in Jesup City - ❓ Will the Wayne County Industrial Development Authority offer the Wayne Commerce Center to another data center company?
About Possible data center at Wayne Commerce Center in Jesup in Jesup City
Newton County
- ❓ How many megawatts is the data center?
About Serverfarm data center with on-site gas power (Covington) in Covington City - 📄 Where exactly is the site? A parcel number, address or agenda link helps.
About Serverfarm data center with on-site gas power (Covington) in Covington City - ❓ What caused the muddy well water near the site?
About Meta Stanton Springs (Newton) data center campus in Unincorporated Newton County - ❓ Is Meta planning more buildings (an AI campus) here?
About Meta Stanton Springs (Newton) data center campus in Unincorporated Newton County - ❓ How much power does the campus use?
About Meta Stanton Springs (Newton) data center campus in Unincorporated Newton County - ❓ How many megawatts will the campus use?
About Amazon Web Services data center (Alcovy Road, Covington) in Covington City - ❓ Why was a stop-work order issued, and what was fixed?
About Amazon Web Services data center (Alcovy Road, Covington) in Covington City - ❓ What tax break did it get?
About Amazon Web Services data center (Alcovy Road, Covington) in Covington City - ❓ Is this linked to the Amazon project on nearby Alcovy Road?
About Gregory Road data center campus in Covington City - ❓ Who is the developer behind Universal Planning LLC?
About Gregory Road data center campus in Covington City - ❓ Has Covington approved it?
About Gregory Road data center campus in Covington City
Muscogee County
- ❓ Where exactly in Columbus is the Duos data center?
About Duos AI data center in Columbus (Axe Compute GPU cluster) in Columbus City - ❓ Does Duos plan to expand the Columbus site, and how much more power would it need?
About Duos AI data center in Columbus (Axe Compute GPU cluster) in Columbus City - ❓ Who is the end user (tenant)?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - ❓ How much water will it use per day?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - ❓ Without diesel generators, will it build gas power or other power on site?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - ❓ Will new high-voltage power lines be built through Upatoi?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - ❓ What did the judge decide in the neighbors' lawsuit?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - ❓ When will the rezoning application for the site be heard?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City - 📄 Is the Dec. 14, 2026 bench trial in the neighbors' lawsuit confirmed on the court calendar?
About Project Ruby data center campus in Upatoi (Columbus) in Columbus City
Sumter County
- ❓ Who will supply the power, and will new power lines be needed?
About Liberty Data Centers campus in Americus in Americus City - ❓ How much water will it use per day?
About Liberty Data Centers campus in Americus in Americus City - ❓ How many diesel backup generators will there be?
About Liberty Data Centers campus in Americus in Americus City - ❓ What rules will Americus adopt after the 30-day pause, and will they apply to this project?
About Liberty Data Centers campus in Americus in Americus City - ❓ Who are the end users (tenants)?
About Liberty Data Centers campus in Americus in Americus City - 📄 Where exactly is the site? A parcel number, address or agenda link helps.
About Liberty Data Centers campus in Americus in Americus City
Early County
- ❓ How many acres and buildings are planned?
About QTS data center campus in Blakely in Blakely City - ❓ How many diesel backup generators will there be?
About QTS data center campus in Blakely in Blakely City - 📄 Did local officials sign an agreement to keep the plans private (NDA)?
About QTS data center campus in Blakely in Blakely City - ❓ Will the new power lines and substation cross nearby land, and who pays for them?
About QTS data center campus in Blakely in Blakely City - ❓ Is 1,500 megawatts the final power need after Georgia Power's studies?
About QTS data center campus in Blakely in Blakely City - ❓ Does the site still need rezoning or a site plan approval from Blakely, and when is that vote?
About QTS data center campus in Blakely in Blakely City
Crawford County
- ❓ Which company wants to build the data center, and how big would it be?
About Possible data center on the old Boy Scout camp on Boy Scout Road (Byron area) in Unincorporated Crawford County - ❓ Will a court let Byron annex the Boy Scout Road land from Crawford County?
About Possible data center on the old Boy Scout camp on Boy Scout Road (Byron area) in Unincorporated Crawford County - ❓ How much water and power would it use?
About Possible data center on the old Boy Scout camp on Boy Scout Road (Byron area) in Unincorporated Crawford County - 📄 Did Byron officials sign an agreement to keep the plans private (NDA)?
About Possible data center on the old Boy Scout camp on Boy Scout Road (Byron area) in Unincorporated Crawford County - ❓ Did the sale to T-Rex close, and does it plan to expand the site?
About Crypto mining data center in Roberta in Roberta City - ❓ How loud is the site for neighbors, and are there noise limits?
About Crypto mining data center in Roberta in Roberta City
DeKalb County
- ❓ What will the court decide about the moratorium?
About Shadowbox Studios data center proposal in Unincorporated DeKalb County - ❓ How much of the nearly 200-acre property would the data center buildings cover?
About Shadowbox Studios data center proposal in Unincorporated DeKalb County - ❓ Will the developer appeal or sue?
About Ellenwood data center (PCC-DeKalb LLC) in Unincorporated DeKalb County
Haralson County
- ❓ What does Georgia-Tallapoosa LLC plan to build?
About Georgia-Tallapoosa land deal (possible data center) in Tallapoosa City - ❓ Who is behind the company?
About Georgia-Tallapoosa land deal (possible data center) in Tallapoosa City - ❓ When will Tallapoosa City Council vote?
About Georgia-Tallapoosa land deal (possible data center) in Tallapoosa City
Lowndes County
- ❓ Has DC BLOX or anyone else filed plans for a data center on the Coleman Road site?
About Possible data center on Coleman Road site near Foxborough (north Valdosta) in Unincorporated Lowndes County - ❓ Will Lowndes County adopt a data center ordinance when the 60-day pause ends, and what will it say?
About Possible data center on Coleman Road site near Foxborough (north Valdosta) in Unincorporated Lowndes County - ❓ How much power and water would a data center here use?
About Possible data center on Coleman Road site near Foxborough (north Valdosta) in Unincorporated Lowndes County
Troup County
- ❓ Will it really use 2 to 4 million gallons of water a day?
About Project Pegasus data center campus (Google, LaGrange) in LaGrange City - ❓ What tax break did the Development Authority of LaGrange give?
About Project Pegasus data center campus (Google, LaGrange) in LaGrange City - ❓ Who is the end user?
About Hogansville data center (Hightower Road land) in Hogansville City - ❓ When will the rezoning come up for a vote?
About Hogansville data center (Hightower Road land) in Hogansville City - 📄 Will the NDA be released?
About Hogansville data center (Hightower Road land) in Hogansville City - ❓ Who is the developer and end user?
About Project West data center campus (LaGrange) in LaGrange City - ❓ Has LaGrange approved it?
About Project West data center campus (LaGrange) in LaGrange City - ❓ Was it affected by LaGrange's 180-day data center pause?
About Project West data center campus (LaGrange) in LaGrange City
Jasper County
- ❓ Who would build and use the data center?
About Mine Lake data center site (Monticello) in Monticello City - ❓ Has a rezoning or state review been filed?
About Mine Lake data center site (Monticello) in Monticello City - ❓ How much power and water would it use?
About Mine Lake data center site (Monticello) in Monticello City
Fayette County
- ❓ When will Microsoft file a site plan?
About Microsoft data center (Project Rita, Tyrone) in Tyrone Town - ❓ How much power will it use?
About Microsoft data center (Project Rita, Tyrone) in Tyrone Town - ❓ Will new power lines be needed?
About Microsoft data center (Project Rita, Tyrone) in Tyrone Town - ❓ Was the Clean Water Act lawsuit filed, and what is its status?
About QTS Fayetteville data center campus (Project Excalibur) in Fayetteville City - ❓ How much power will the full campus use?
About QTS Fayetteville data center campus (Project Excalibur) in Fayetteville City - ❓ How many diesel backup generators are planned?
About QTS Fayetteville data center campus (Project Excalibur) in Fayetteville City - ❓ How much power will it need? The filing said it depends on the customer.
About QTS ATL2 East data center in Fayetteville City - ❓ Does it need any new city vote?
About QTS ATL2 East data center in Fayetteville City
Jackson County
- ❓ What did the city approve, and when?
About Northern Data / Rumble data center (Maysville) in Maysville Town - ❓ Will it grow to 180 megawatts, as the company once said it could?
About Northern Data / Rumble data center (Maysville) in Maysville Town
Columbia County
- ❓ Is this the same site as the Pumpkin Center rezoning?
About Project Squash data center (Wrightsboro Road, Harlem) in Unincorporated Columbia County - ❓ What tax terms are in the Kinetic bond-for-title deal?
About Project Squash data center (Wrightsboro Road, Harlem) in Unincorporated Columbia County - ❓ Is Google the end user here?
About White Oak Technology Park (Appling) in Unincorporated Columbia County - 📄 Is the $17 billion Kinetic agreement approved in Aug. 2026 for this site or the Harlem site?
About White Oak Technology Park (Appling) in Unincorporated Columbia County - ❓ The 2025 filing listed 6.6 million gallons of water a day; the 2026 filing lists 148,000. Which is right?
About White Oak Technology Park (Appling) in Unincorporated Columbia County - ❓ How many diesel generators are planned?
About White Oak Technology Park (Appling) in Unincorporated Columbia County - ❓ Is the 'Project Squash' grading permit filing for this site?
About Pumpkin Technology Campus (Pumpkin Center, Harlem) in Unincorporated Columbia County - ❓ Who is the end user?
About Pumpkin Technology Campus (Pumpkin Center, Harlem) in Unincorporated Columbia County - ❓ How much power will it need?
About Pumpkin Technology Campus (Pumpkin Center, Harlem) in Unincorporated Columbia County - ❓ Will the developer reapply?
About Byrd Farms Technology Campus in Unincorporated Columbia County
Crisp County
- ❓ How many megawatts will the campus use?
About Project Splice technology campus outside Cordele in Unincorporated Crisp County - ❓ Who is the end user (tenant)?
About Project Splice technology campus outside Cordele in Unincorporated Crisp County - ❓ Will new high-voltage power lines or a new substation be built near homes?
About Project Splice technology campus outside Cordele in Unincorporated Crisp County - ❓ How many diesel backup generators will there be?
About Project Splice technology campus outside Cordele in Unincorporated Crisp County - 📄 Were any tax breaks given, or agreements to keep plans private (NDAs) signed?
About Project Splice technology campus outside Cordele in Unincorporated Crisp County
Douglas County
- ❓ Will the developer try again or go to court?
About Hickman Property data center campus (EdgeConneX) in Unincorporated Douglas County - ❓ How much power will the campus use?
About Stream Data Centers Winston campus (SDC ATLA) in Unincorporated Douglas County - ❓ Who is the end user?
About Stream Data Centers Winston campus (SDC ATLA) in Unincorporated Douglas County - ❓ When will construction start?
About Stream Data Centers Winston campus (SDC ATLA) in Unincorporated Douglas County - ❓ Who is the end user?
About Winston data center (Trammell Crow, Waldrop land) in Unincorporated Douglas County - ❓ How much power will it use?
About Winston data center (Trammell Crow, Waldrop land) in Unincorporated Douglas County - ❓ Did it receive a tax break?
About Winston data center (Trammell Crow, Waldrop land) in Unincorporated Douglas County - ❓ Is it under construction or running now?
About Stack Infrastructure ATL02 campus (Lithia Springs) in Unincorporated Douglas County - ❓ How many megawatts will the full four-building campus use?
About Stack Infrastructure ATL02 campus (Lithia Springs) in Unincorporated Douglas County - ❓ Is this the same land as the 2023 'Rock House Road Data Center Site' state filing?
About Amazon Web Services land for data center (Echo Road, Douglas County) in Unincorporated Douglas County - ❓ Has Amazon applied for building permits?
About Amazon Web Services land for data center (Echo Road, Douglas County) in Unincorporated Douglas County - ❓ How much power and water would it use?
About Amazon Web Services land for data center (Echo Road, Douglas County) in Unincorporated Douglas County - ❓ How many megawatts will it use?
About DC BLOX Atlanta West campus in Douglasville City - ❓ Did it get a tax break?
About DC BLOX Atlanta West campus in Douglasville City - ❓ Is this the land Amazon bought in 2024?
About Rock House Road data center site in Unincorporated Douglas County - ❓ Will it really use 1.1 million gallons of water a day?
About Rock House Road data center site in Unincorporated Douglas County - ❓ Is it under construction or running now?
About Vantage Data Centers Douglasville campus in Douglasville City - ❓ How much power will it use?
About Vantage Data Centers Douglasville campus in Douglasville City
Henry County
- ❓ Who is the end user?
About Hampton Technology Park in Hampton City - ❓ Is this the same site as Equinix's xScale campus in Hampton?
About Hampton Technology Park in Hampton City - ❓ How will the cemetery be protected?
About Hampton Technology Park in Hampton City - 📄 Where exactly is the site? A parcel number, address or agenda link helps.
About Hampton Technology Park in Hampton City - ❓ Which company is behind Southeast Property Holdings?
About Henderson Farms data center campus (Hampton) in Hampton City - ❓ When was the permit approved?
About Henderson Farms data center campus (Hampton) in Hampton City - ❓ Is the hydroponic farm with the University of Georgia still planned?
About Henderson Farms data center campus (Hampton) in Hampton City - ❓ Exactly where is the site, and is it the same as Hampton Technology Park?
About Equinix xScale data center campus (Hampton) in Hampton City - ❓ How many megawatts will it use?
About Equinix xScale data center campus (Hampton) in Hampton City - ❓ Did Henry County approve it?
About Strickland Tract data center (Red Wolf DCD Properties) in Unincorporated Henry County - ❓ Did Henry County approve or deny the rezoning?
About Rocky Creek Road data center (Red Wolf DCD Properties) in Unincorporated Henry County - ❓ How much power would it use?
About Rocky Creek Road data center (Red Wolf DCD Properties) in Unincorporated Henry County
Gordon County
- ❓ Will Masterworks file a state regional review (DRI)?
About Highway 53 data center (Masterworks Atlanta, Calhoun) in Calhoun City - ❓ How much power and water would it use?
About Highway 53 data center (Masterworks Atlanta, Calhoun) in Calhoun City - ❓ Who is the end user?
About Highway 53 data center (Masterworks Atlanta, Calhoun) in Calhoun City
Irwin County
- ❓ Who is the end user? A petition claims Google, but this is not confirmed.
About Project Arrowhead data center campus near Mystic in Unincorporated Irwin County - ❓ Has Irwin County approved any rezoning or special exception for this site?
About Project Arrowhead data center campus near Mystic in Unincorporated Irwin County - 📄 Will the new industrial authority give tax breaks, and was an agreement to keep the plans private (NDA) signed?
About Project Arrowhead data center campus near Mystic in Unincorporated Irwin County - ❓ Will new high-voltage power lines be built, since the filing says existing lines are not enough?
About Project Arrowhead data center campus near Mystic in Unincorporated Irwin County - ❓ Will the on-site wastewater plant release water into the Alapaha River?
About Project Arrowhead data center campus near Mystic in Unincorporated Irwin County
Brantley County
- ❓ Who wants to buy the landfill tract, and is Microsoft really involved?
About Possible data center on the former landfill tract in Brantley County in Unincorporated Brantley County - ❓ Will Brantley County vote to allow data centers in light industrial zones, and when?
About Possible data center on the former landfill tract in Brantley County in Unincorporated Brantley County - ❓ How much power and water would the data center use, and would it build its own power plant?
About Possible data center on the former landfill tract in Brantley County in Unincorporated Brantley County
Camden County
- ❓ Will the landowner file new data center plans after the Camden County pause ends?
About Proposed industrial park and data center on I-95 in Kingsland in Kingsland City - ❓ Did Kingsland adopt a data center moratorium in May 2026?
About Proposed industrial park and data center on I-95 in Kingsland in Kingsland City
Walton County
McDuffie County
- ❓ Who is the developer and end user?
About Project Azalea data center in Unincorporated McDuffie County - ❓ Where will 400 megawatts of power come from?
About Project Azalea data center in Unincorporated McDuffie County - ❓ Will water come from Clarks Hill Lake?
About Project Azalea data center in Unincorporated McDuffie County
Clarke County
- ❓ Who is the developer, and how big is the plan?
About Athena Studios data center proposal in Unincorporated Clarke County - ❓ What did Athens-Clarke's new data center rules say, and does this project meet them?
About Athena Studios data center proposal in Unincorporated Clarke County - ❓ Who was the end user?
About Old Elberton Road data center (FAE Clark LLC) in Unincorporated Clarke County
Whitfield County
- ❓ How many megawatts will Dalton 4 use?
About Core Scientific Dalton 4 AI data center (Old Tilton Road) in Unincorporated Whitfield County - ❓ Who is the AI customer?
About Core Scientific Dalton 4 AI data center (Old Tilton Road) in Unincorporated Whitfield County - ❓ How much water will it use?
About Core Scientific Dalton 4 AI data center (Old Tilton Road) in Unincorporated Whitfield County
Spalding County
- ❓ How will the court rule on the lawsuits?
About Wallace Jackson data center campus in Unincorporated Spalding County - ❓ The state filing lists 500,000 gallons of water a day; county rules cap closed-loop use near 25,000. Which applies?
About Wallace Jackson data center campus in Unincorporated Spalding County - ❓ How much power will it need?
About Wallace Jackson data center campus in Unincorporated Spalding County - ❓ Will the developer move forward?
About Spalding Investments data center campus (High Falls Road and South McDonough Road) in Unincorporated Spalding County - ❓ How much power will it need?
About Spalding Investments data center campus (High Falls Road and South McDonough Road) in Unincorporated Spalding County - ❓ Will the developer move forward?
About Project Spalding data center campus (High Falls Road and Alicia Drive) in Unincorporated Spalding County - ❓ Who is the end user?
About Project Spalding data center campus (High Falls Road and Alicia Drive) in Unincorporated Spalding County
Twiggs County
- ❓ How much will it cost? Reports say $2 billion and $5 billion.
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County - ❓ How many megawatts will it use, and which utility will serve it?
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County - ❓ How much water will the first fill and later top-ups take, and from where?
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County - ❓ Who is the end user (tenant)?
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County - ❓ What has the court decided on the residents' lawsuit or appeal?
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County - ❓ How many diesel backup generators will there be?
About Pine Ridge Tech Park data center (Twiggs County) in Unincorporated Twiggs County
Monroe County
- ❓ Where will the power come from? Developers spoke of local power generation.
About Forsyth Technology Campus (Trammell Crow) in Forsyth City - ❓ Who is the end user?
About Forsyth Technology Campus (Trammell Crow) in Forsyth City - ❓ Will it really use 1.5 million gallons of water a day?
About Forsyth Technology Campus (Trammell Crow) in Forsyth City - ❓ Will Google need a rezoning?
About Google land for possible data center (Rumble Road) in Unincorporated Monroe County - ❓ When will Google decide to build?
About Google land for possible data center (Rumble Road) in Unincorporated Monroe County - ❓ Google paid about $42 million (Macon Telegraph) or $58.5 million (DCD) for the land. Which is right?
About Google land for possible data center (Rumble Road) in Unincorporated Monroe County - ❓ Who will build and use the data centers?
About Rumble Technology Campus (Cloverleaf) in Unincorporated Monroe County - ❓ Will it really use 2 million gallons of water a day?
About Rumble Technology Campus (Cloverleaf) in Unincorporated Monroe County - ❓ Where will the power come from?
About Rumble Technology Campus (Cloverleaf) in Unincorporated Monroe County
Carroll County
- ❓ Could Atlas bring the plan back?
About Project Bus data center campus (Atlas Development) in Temple City - ❓ Why was it withdrawn?
About Project Bus data center campus (Atlas Development) in Temple City - ❓ Has Villa Rica City Council approved the rezoning?
About Avemore technology and data park (Atlas Development) in Villa Rica City - ❓ How much power and water will it use?
About Avemore technology and data park (Atlas Development) in Villa Rica City - ❓ Who is the end user?
About Avemore technology and data park (Atlas Development) in Villa Rica City
Hall County
- ❓ What will be built on the land under light industrial zoning?
About Project Turbo data center (O'Kelly Road) in Unincorporated Hall County
Habersham County
- ❓ Will the developer try again in the county?
About Big Red Apple Innovation Corridor (included a data center site) in Unincorporated Habersham County
Clayton County
- ❓ Will it really use 3 million gallons of water a day, or less with a different cooling system?
About Fort Gillem data center campus (Digital Realty ATL15/ATL16) in Forest Park City - ❓ Was a tax break given?
About Fort Gillem data center campus (Digital Realty ATL15/ATL16) in Forest Park City - ❓ Has building construction started, and which permits has Forest Park issued?
About Fort Gillem data center campus (Digital Realty ATL15/ATL16) in Forest Park City - ❓ Has Georgia EPD approved the cleanup of the buried Army waste on the site?
About Fort Gillem data center campus (Digital Realty ATL15/ATL16) in Forest Park City - ❓ How much property tax will the company save under the tax break?
About TA Realty data center (East Tanners Church Road) in Unincorporated Clayton County - ❓ How much water and power will it use?
About TA Realty data center (East Tanners Church Road) in Unincorporated Clayton County - ❓ Has construction started?
About TA Realty data center (East Tanners Church Road) in Unincorporated Clayton County
Butts County
- ❓ Did Butts County approve the rezoning?
About Highway 16 Interstate Health Development (data centers plus hospital) in Unincorporated Butts County - ❓ How many megawatts will the data centers need?
About Highway 16 Interstate Health Development (data centers plus hospital) in Unincorporated Butts County - ❓ What cooling will they use, given the 4.5 million gallons a day water estimate?
About Highway 16 Interstate Health Development (data centers plus hospital) in Unincorporated Butts County - ❓ How much power and water will the campus use?
About River Park data center campus (Amazon Web Services) in Unincorporated Butts County - ❓ What tax break did the project get?
About River Park data center campus (Amazon Web Services) in Unincorporated Butts County - ❓ Is mud from construction reaching High Falls Lake, and who checks?
About River Park data center campus (Amazon Web Services) in Unincorporated Butts County
Jones County
- ❓ When was it withdrawn, and will it be refiled?
About Crooked Creek Technology Park (EagleRock) in Unincorporated Jones County
Randolph County
- ❓ Did the city or county give any tax breaks?
About Crypto mining site in the Cuthbert industrial park in Cuthbert City - ❓ How loud is it for nearby homes and businesses?
About Crypto mining site in the Cuthbert industrial park in Cuthbert City
Pierce County
- ❓ What has Pierce County Superior Court decided on the company's appeal?
About Bitcoin mining data center on Cason Road near Blackshear (denied) in Unincorporated Pierce County - ❓ Is any equipment still on the half-built site?
About Bitcoin mining data center on Cason Road near Blackshear (denied) in Unincorporated Pierce County
Lamar County
- ❓ How many acres did Amazon buy, and where exactly?
About Amazon data center land (Lamar County) in Unincorporated Lamar County - ❓ Will the land need a rezoning?
About Amazon data center land (Lamar County) in Unincorporated Lamar County - ❓ How much power and water would it use?
About Amazon data center land (Lamar County) in Unincorporated Lamar County
🦺 Stay safe: only take photos from public roads. Never go onto private land.