Meta runs a large data center campus at Stanton Springs along I-20. The Newton County water authority says it uses about 10% of the county's daily water. In 2026, nearby Morgan County residents said their well water became muddy after construction; the cause is unclear.

👥 Reported, not confirmed yetSourceLast checked: Oct 2026

What happens next?

Where things stand: Built & running Running since about 2020; a three-building, 1.5 million square foot expansion was added in 2023 (per Baxtel).

❓ 3 open questions about it: see below.

📣 Report noise, water or power bill changes

Last checked Oct 8, 2026.

🕒 Latest update (May 2026): Morgan County residents near the site said their well water turned muddy; the EPA said it would review.

What we know

  • 📍 WhereStanton Springs industrial park along I-20, near Social Circle, Unincorporated Newton County, Newton County
  • 🏢 CompanyMeta
  • 🏛️ Owned byMeta Platforms
  • 👤 Built forMeta
  • 💧 WaterNewton County Water and Sewerage Authority
  • ❄️ Coolingoutside air cooling (per Baxtel)

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • What caused the muddy well water near the site? 🙋 I'll find out ·
  • Is Meta planning more buildings (an AI campus) here? 🙋 I'll find out ·
  • How much power does the campus use? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 8, 2026: We checked USGS aerial imagery of the site (33.600476, -83.697068): large data center buildings, substation and a second campus under construction at the pin.

    What happened so far

    • 2023
      A three-building expansion added about 1.5 million square feet.
    • May 2026
      Morgan County residents near the site said their well water turned muddy; the EPA said it would review.

    Local votes and rules

    ⏸️ Pause on new data centers

    A data center tracker lists a Newton County data center pause dated July 15, 2026. Newton County already hosts Meta and Amazon data centers. Details were not found.

    July 15, 2026
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. Meta Newton Campus (Atlanta) Data Center · Baxtel
    2. Data center accused of muddying Georgia county's drinking water · NewsNation · May 23, 2026
    3. OpenStreetMap: Meta Stanton Springs Data Center (mapped site) · OpenStreetMap contributors · Oct 7, 2026
    4. USGS National Map imagery around the existing pin · U.S. Geological Survey · Oct 8, 2026

    See something wrong? Tell us and we'll fix it.