Data centers in Indiana

42 projects we know about, across 26 counties. Pick your county below, or type your ZIP on the home page.

Big = 100+ megawatts or 100+ acres, or it's described as an AI project. Projects of unknown size always stay on.

Built & runningBeing builtApproved, not built yetProposedStopped or cancelledHollow dot (when zoomed in): exact site not known yet, pin shows the town

All projects

Newest activity first. Click one to see the details.

Proposed

Microsoft Granger data center

St. Joseph County

930 acres · for Microsoft

🕒 Nov 12, 2026: The St. Joseph County Board of Zoning Appeals approved Microsoft's request for a 30-foot…

Being built

Amazon (AWS) Jasper County data center (Project Rise)

Wheatfield Township, Jasper County

304 acres · for Amazon Web Services

🕒 Nov 12, 2026: Amazon held a groundbreaking for the $7 billion, 304-acre campus. More than 350 workers …

Approved, not built yet

Pittsboro data center campus (Raeden; first planned by Vantage)

Pittsboro, Hendricks County

626 acres · for unknown (shared by several tenants)

🕒 Nov 12, 2026: The Pittsboro Board of Zoning Appeals voted 3-2 to approve, with conditions, a special e…

Approved, not built yet

DC BLOX Thunderbird data center campus (east Indianapolis)

Warren Township, Marion County

🕒 Nov 9, 2026: A City-County Council committee voted 11-2 to recommend that the full council reject abo…

Proposed

Project Zora (northern Warrick County)

Warrick County

1,200 acres

🕒 Nov 9, 2026: County commissioners voted 3-0 to table a countywide data center ordinance; they also di…

Being built

Google data center campus near Monrovia (Project Louie)

Monroe Township, Morgan County

550 acres · for Google

🕒 Oct 7, 2026: Indiana's utility commission (IURC) approved AES Indiana's plan to power Google's 390-me…

Proposed

Digital Realty data center campus, Kokomo Industrial Park North

Kokomo, Howard County

476 acres

🕒 Oct 10, 2026: Digital Realty held a public open house about the plan.

Being built

Microsoft La Porte data center campus

La Porte, LaPorte County

1,300 acres · for Microsoft

🕒 June 17, 2026: Microsoft held a groundbreaking for the campus.

Proposed

Wylie Capital Broadway data center, Merrillville

Merrillville, Lake County

87 acres

🕒 June 1, 2026: A one-year town pause on new data center approvals started.

Reported in the news, not confirmed yet

Stopped or cancelled

Agincourt data center proposal, Valparaiso

Valparaiso, Porter County

180 acres

🕒 March 11, 2025: The mayor said Agincourt would withdraw and release its option on the land.

Stopped or cancelled

Bristol Innovation Park

Bristol, Elkhart County

957 acres

🕒 Aug 3, 2026: The landowners asked to withdraw the request; the Town Council accepted it.

Stopped or cancelled

American Tower edge data center (Pike Township, Indianapolis)

Pike Township, Marion County

7 acres

🕒 Feb 2026: American Tower withdrew its rezoning request after pushback from neighbors.

Approved, not built yet

Radius Data Centers, AllPoints 18 and 19 (Plainfield)

Plainfield, Hendricks County

30.3 acres

🕒 Jan 5, 2026: The Plainfield Plan Commission unanimously approved the primary plat. More than a dozen …

Approved, not built yet

Google Michigan City data center (Project Maize)

Michigan City, LaPorte County

70 acres · for Google

🕒 April 16, 2026: Google confirmed it is buying the Project Maize site.

Approved, not built yet

Amazon (AWS) Portage data center

Portage, Porter County

for Amazon Web Services

🕒 Dec 5, 2023: Portage City Council approved tax breaks for the Amazon data center.

Stopped or cancelled

Provident data center proposal, Chesterton

Chesterton, Porter County

200 acres

🕒 June 10, 2024: Provident Realty Advisors withdrew its application.

Approved, not built yet

Bristol data center site (south of State Road 120)

Bristol, Elkhart County

240 acres

🕒 May 20, 2026: Local TV reported few updates on the site since the 2024 vote.

Stopped or cancelled

Prologis data center proposal near Leesburg

Kosciusko County

550 acres

🕒 April 22, 2025: County commissioners voted unanimously against the rezoning.

Stopped or cancelled

Data One / Logistix data center proposal northwest of Frankfort

Clinton County

715 acres

🕒 Jan 20, 2026: County commissioners voted 3-0 to deny the rezoning.

Approved, not built yet

Surge Development data center near Knightstown

Henry County

500 acres

🕒 Jan 28, 2026: County commissioners approved the planned unit development 2-1.

Being built

Meta Jeffersonville data center (River Ridge)

Jeffersonville, Clark County

619 acres · for Meta

🕒 July 2026: Local public radio reported the building was nearing completion.

Stopped or cancelled

Google 'Project Flo' data center (Franklin Township, Indianapolis)

Franklin Township, Marion County

468 acres · for Google

🕒 Sept 22, 2025: Google withdrew its rezoning petition before the City-County Council could vote.

Proposed

Jefferson Proving Ground data center (north of Madison)

Jefferson County

549 acres

🕒 April 2026: The county council created an Economic Revitalization Area (a tax-break zone) for the si…

Proposed

Jumping Bison data center (Greensburg)

Greensburg, Decatur County

550 acres

🕒 Dec 2024: Greensburg City Council approved a 10-year, 60% property tax break for Jumping Bison LLC.

Reported in the news, not confirmed yet

Proposed

Merrillville Technology Park (Province Group)

Merrillville, Lake County

🕒 June 1, 2026: A one-year town pause on new data center approvals started.

Reported in the news, not confirmed yet

Stopped or cancelled

Hancock County MegaSite data center proposal

Buck Creek Township, Hancock County

776 acres

🕒 May 2025: After a crowded public meeting, Surge withdrew the rezoning request.

Approved, not built yet

QLEVR data center, Shadow Lake Business Park (Charlestown)

Charlestown, Clark County

12 acres

🕒 July 2026: The Charlestown Advisory Plan Commission voted 4-3 to let it move forward, with conditio…

Proposed

Blue Power gas plant and data center (near Carbon)

Clay County

27.62 acres

🕒 July 2026: Officials said that without county zoning they cannot pause the project.

Stopped or cancelled

Outrigger Industrial data center (Washington)

Washington, Daviess County

120 acres

🕒 May 2026: The city council voted unanimously to cancel dealings with Outrigger and to look at a mo…

Approved, not built yet

CoreWeave data center at Digital Crossroads, Hammond

Hammond, Lake County

25 acres · for CoreWeave

🕒 Sept 29, 2025: The mayor said the $7 billion project was moving forward after NIPSCO got state approval…

Approved, not built yet

Sentinel data center, Eagle Creek Township (near Lowell)

Eagle Creek Township, Lake County

160 acres

🕒 June 9, 2026: Lake County Council approved rezoning 160 acres from farm to light industrial.

Reported in the news, not confirmed yet

Approved, not built yet

Karis Critical data center campus, Merrillville

Merrillville, Lake County

180 acres

🕒 June 1, 2026: A one-year town pause on new data center approvals started.

Approved, not built yet

Sabey Decatur Technology Park (Indianapolis)

Decatur Township, Marion County

130 acres

🕒 Sept 16, 2026: The city approved about $240 million in tax breaks for the project.

Approved, not built yet

Prologis data center campus (Shelbyville)

Shelbyville, Shelby County

576 acres

🕒 Jan 7, 2026: The Shelbyville Plan Commission gave the zoning request an unfavorable recommendation.

Being built

Amazon (AWS) Hobart data center campus

Hobart, Lake County

700 acres · for Amazon Web Services

🕒 May 28, 2026: Merrillville officials said the Hobart campus was under construction.

Approved, not built yet

Metrobloks IND-A1 data center (Martindale-Brightwood)

Center Township, Marion County

14 acres

🕒 Aug 19, 2026: Indianapolis passed a data center pause through 2027. This project is exempt because it …

Being built

Heartland Industrial Park AI data center (Fluidstack, near Merom)

Sullivan County

1,000 acres · for unknown (Google backs the lease)

🕒 Aug 6, 2026: Fluidstack held a public open house in Merom about the project.

Built & running

Amazon (AWS) New Carlisle data center campus

St. Joseph County

1,200 acres · for Amazon Web Services (AI work for Anthropic)

🕒 Oct 2025: Amazon switched on the campus ("Project Rainier"), with about 500,000 AI chips.

Built & running

Google Fort Wayne data center (Project Zodiac)

Fort Wayne, Allen County

728 acres · for Google

🕒 Aug 25, 2026: State regulators held a public hearing on the wetlands request.

Being built

Meta Lebanon data center campus (LEAP District)

Lebanon, Boone County

1,500 acres · for Meta

🕒 Feb 11, 2026: Meta announced and broke ground on a $10 billion, 1 gigawatt campus in Lebanon.

Proposed

Decennial Group data center idea near Akron

Fulton County

🕒 March 2, 2026: County commissioners voted 2-1 for a one-year data center pause.

Proposed

Proposed data center campus (Franklin County)

Franklin County

300 acres

🕒 2026: Residents packed an informational meeting about the proposal.

Reported in the news, not confirmed yet

The rules in Indiana

What the state says about data centers, in plain words.

📜 State laws

House Enrolled Act 1210 (2026): small payment to local governments · March 12, 2026
Signed by Gov. Mike Braun on March 12, 2026. To keep a state sales tax break, a data center that gets local approval after June 30, 2026, may have to pay the local government up to 1% of the sales tax it does not pay on its electricity. Data centers that already have a tax break certificate are left out. Earlier versions would have paid local governments much more; the final version was cut in the last days of the session. If the local government asks, the Department of Revenue reports how much is owed. Source

House Enrolled Act 1406 (2026): state study of data center costs · March 2026
Signed in March 2026. The Indiana Finance Authority and the Indiana Economic Development Corporation must study what data center tax breaks cost the state and local governments, how data centers affect power bills and water supplies, and their effects on the environment. The report is due November 1, 2026, to a legislative committee. Source

House Enrolled Act 1007 (2025): fast-track power plants for very big customers · 2025
Passed in 2025. It sets up a faster (about 150-day) state review for new power plants built to serve one very large customer, such as a data center using 150 megawatts or more (or 5% of the utility's peak). The big customer must agree to pay at least 80% of the costs tied to it. The governor's office says it wants data centers to pay 100%. As of September 2026, a consumer group said no utility had used the fast-track plan yet; AES Indiana filed its Google deal under this law. Source

House Enrolled Act 1405 (2019): the data center sales tax break · 2019
This 2019 law created Indiana's sales tax break for data centers (see Tax breaks). It also lets local councils and county boards give property tax breaks on data center equipment. A 2025 law (HEA 1601) widened it to quantum computing and some other advanced computing. Source

House Bill 1333 (2026): skipping local zoning on farmland, dropped · Feb 2026
This bill would have let data centers and solar farms be built on some lower-quality farmland without the usual local zoning hearings. After public pushback, the sponsor said that part would not move forward, and the bill died in committee. Source

Other 2026 bills that did not pass · Feb 27, 2026
Nearly a dozen data center bills were filed in the 2026 session, which ended February 27, 2026. Bills that did not pass include HB 1245 (a utility commission study of data center power demand) and HB 1043 (a state water permit for data centers using 10 million gallons a month or more). The next regular session starts in January 2027. Source

💡 Who pays for the power

Indiana Michigan Power (I&M) large-customer rules · Feb 19, 2025
On February 19, 2025, I&M announced that the Indiana Utility Regulatory Commission (IURC) approved its rules for very large new customers like data centers (70 megawatts or more at one site, or 150 megawatts across sites). They must sign contracts of at least 12 years, pay for at least 80% of the power they signed up for each month even if they use less, post more money up front, and pay an exit fee if they leave early. The IURC added that any cut of more than 20% in a customer's signed-up power must come back to it for approval. Consumer groups and the big tech companies signed the deal. Source

NIPSCO's deal with Amazon (up to 2,400 megawatts) · June 17, 2026
On June 17, 2026, the IURC approved a 15-year contract between NIPSCO and Amazon for data centers in northern Indiana, starting January 1, 2027, and growing to up to 2,400 megawatts by the end of 2032 (Cause No. 46322). New power plants for Amazon will be built by a separate company, NIPSCO GenCo, so other customers do not pay for them. NIPSCO says other customers will get about $1 billion in bill credits over 15 years. Some terms, like a cap on building costs and the site, are kept confidential. Source

AES Indiana's deal with Google (Monrovia) · April 22, 2026
On April 22, 2026, AES Indiana asked the IURC to approve a contract of at least 15 years to serve a planned Google data center in Monrovia (Morgan County). AES says Google will pay for all its power and all new equipment needed to serve it, and that other customers will save over $770 million over 15 years. A trade publication reported the IURC approved it in 2026; we have not yet seen the order itself. Source

AES Indiana rate increase reopened · Sept 2, 2026
In June 2026 the IURC approved a $71 million rate increase for AES Indiana (just over $9 a month for a typical home). On September 2, 2026, it agreed to reopen the case after the Citizens Action Coalition argued AES had already signed deals with Google during the case. Governor Braun fired one commissioner who voted for the increase in August 2026; the state cited other reasons for the firing. Source

Electric bills jumped in 2024-2025 · July 1, 2025
A Citizens Action Coalition study of IURC data found average home electric bills at Indiana's five big investor-owned utilities rose 17.5% (about $28 a month) between July 2024 and July 2025. NIPSCO rose 26.7%, CenterPoint about 25%, Duke Energy Indiana about 20%, AES Indiana 12% and I&M 3.9%. The study does not say data centers caused these increases. Source

Ratepayer Protection Pledge (not a law) · July 23, 2026
On July 23, 2026, Governor Braun signed the White House 'Ratepayer Protection Pledge'. Signers promise that data centers will pay the full cost of the power and equipment they need. Indiana's big utilities (I&M, Duke, CenterPoint, NIPSCO's parent and AES) also signed. The pledge is voluntary; the Citizens Action Coalition says it is not enforceable and has not been written into Indiana law. Source

💵 Tax breaks

State sales tax break for data centers (up to 50 years) · 2019
Since 2019, the Indiana Economic Development Corporation (IEDC) can let a qualified data center skip the 7% state sales tax on its equipment and on the electricity it uses. The break lasts up to 25 years, or up to 50 years if the investment is over $750 million. The minimum investment ranges from $25 million to over $150 million depending on county population. A consumer group counted $655 million in exemptions paid so far, $611 million of it to Amazon (as of August 2026). The state has never published an estimate of the full cost; a study is due November 1, 2026. Source

Local property tax breaks · 2026
City councils and county boards can give data centers property tax breaks (abatements), including on computer equipment for data centers that invest at least $25 million. There is no state list of these deals. Examples cited by a consumer group: $395 million for Metrobloks and $188 million for Sabey in Indianapolis. Source

🤐 Privacy agreements (NDAs) and public records

Agreements to keep plans private (NDAs) are allowed · June 25, 2025
No Indiana law stops local officials from signing agreements with data center developers to keep plans private (NDAs). In 2025, an Indianapolis City-County Council member signed one about a data center proposed in Franklin Township, which kept the company's name secret. Google was later named as the company and dropped the plan after local opposition. Source

Public records law: anyone can ask · July 1, 2026
Under Indiana's Access to Public Records Act, any person may inspect and copy public records. The agency must respond within 24 hours to a request made in person or by phone, and within 7 days to one made by mail, fax or email. That is only a response; the records themselves must come within a reasonable time. Since July 1, 2026, agencies may use online request portals, put Indiana residents and civic or personal requests first, and slow down out-of-state or automated requests. Source

Deal talks can be kept secret until the final offer · 2017
Records about negotiations between economic development agencies (or a city or county) and a company can be withheld while talks are going on. But the terms of the final offer of public money (like tax breaks) must be made public. Source

Free help if a records request is denied · 2026
The state Public Access Counselor gives free advice and takes formal complaints when an agency denies or ignores a records request or holds an improper closed meeting. The counselor usually answers a complaint within 30 days. Its opinions are advice; to force release you must go to court. Source

💧 Water

Big water users must register with the DNR · 2026
Anyone able to pump more than 100,000 gallons a day from wells, rivers or lakes must register with the Department of Natural Resources (DNR) within 3 months and report yearly use. Data centers that buy water from a city water utility do not register. A 2026 legislative estimate said only 1 of about 70 data centers was registered. Source

Moving large amounts of water long distances · July 1, 2025
Senate Enrolled Act 4 (2025) followed concerns about piping water to the LEAP district in Lebanon. It requires a DNR permit to move more than 10 million gallons a day from one river basin to another, and IURC approval for long water pipelines within a basin. It took effect July 1, 2025. Source

State water inventory due by end of 2026 · 2025
Governor Braun's Executive Order 25-63 ordered a statewide water inventory and management plan, including a public online data platform for water use and future demand. Source

🌫️ Air and generators

Air permits for backup generators (IDEM) · April 10, 2026
The Indiana Department of Environmental Management (IDEM) issues air permits for data center diesel backup generators. A consumer group counted 2,735 backup generators at 11 large data center sites (as of August 2026). Draft permits get a public comment period, usually 30 days, and you can ask for a public hearing. Example: in April 2026 IDEM let the Google data center in Fort Wayne add 140 more generators. IDEM said it cannot deny a permit over quality of life or power bills. Source

Appealing an IDEM permit · 2026
You can appeal an IDEM air permit decision to the Office of Environmental Adjudication within 30 days of the notice. Source

New gas plants for data centers · 2026
New power plants for data centers are approved by the IURC (for utilities) and need IDEM air permits. Utilities including NIPSCO's GenCo, I&M and Duke have planned new gas plants as data center demand grows. Source

🙋 How to have your say

Who decides a data center near you · 2026
Inside a city or town, the city council or town council decides zoning, usually after the plan commission holds a hearing and makes a recommendation. Outside cities and towns, the county commissioners decide, after the county (or area) plan commission. In some counties, one area plan commission serves the county and the towns. Townships in Indiana do not zone. In Indianapolis (Marion County), the Metropolitan Development Commission and the City-County Council decide. Power plant and utility deals go to the state IURC. Source

How zoning hearings work · 2015
Rezonings and new zoning rules start at the plan commission, which must hold a public hearing with notice in the newspaper and, for rezonings, letters to neighbors. The plan commission sends a recommendation to the council or commissioners, who make the final vote. Special permits and variances go to the Board of Zoning Appeals, which also holds a public hearing. Sign up for meeting notices and speak or send written comments. Source

Appeal deadline: 30 days · May 13, 2026
To challenge a zoning decision in court, you must file a petition for judicial review within 30 days of the decision (Indiana Code 36-7-4-1605). The Indiana Supreme Court is deciding whether the 30 days starts at the vote or when written findings are signed, so file early. Source

Local pauses (moratoriums) · Aug 2026
By mid-2026, Indiana University's Environmental Resilience Institute counted 11 counties with data center ordinances, at least 17 with temporary pauses, and 2 (Marshall and Cass) that banned new data centers. In August 2026, Indianapolis paused new data centers through December 2027. Ask your county or council whether a pause or new rules are planned. Source

How to file a public records request · 2026
Anyone can ask any state or local agency for records, in person, by phone, mail or email. Name the records as clearly as you can (for example: 'all emails and agreements about the proposed data center on [road], since January 2026'). The agency must respond within 7 days for written requests. If refused, file a free complaint with the Public Access Counselor. Source

How to comment on a power company case · 2026
Send written comments to the Office of Utility Consumer Counselor (OUCC) online, by mail or fax. Include your name, city and ZIP, the utility, and the IURC cause number. Your comments go into the official case record. Send them at least a week before the OUCC's testimony deadline. Rate cases asking for $2.5 million or more must have a public field hearing. Source

How to comment on a generator air permit · 2026
Watch IDEM's public notices by region, or ask IDEM's Office of Air Quality to put you on its interested parties list for a county. Send written comments during the comment period (usually 30 days) and ask for a public hearing if you want one. Source

🧾 Help with your bills

Energy Assistance Program (EAP) · Oct 1, 2026
A once-a-year payment toward heating and electric bills, paid straight to your utility. It can also help if your power is shut off or about to be. For 2026-2027, apply from October 1, 2026, 8 a.m. to April 30, 2027, online, by mail or in person through your local service provider. It may take up to 55 days to decide. Source

No winter shutoffs for EAP applicants (December 1 to March 15) · 2026
From December 1 to March 15, electric and gas utilities cannot shut off the heat of customers who have applied for or get Energy Assistance. You still owe the bills, so pay what you can. Source

Township trustee help · April 20, 2026
Indiana townships must give emergency help with basic needs, which can include utility bills. Contact your township trustee's office. Source

📞 Who to contact

Indiana Utility Regulatory Commission (IURC) · Oct 7, 2026
Approves electric rates, special data center contracts and new utility power plants. Case documents are on its online services portal. Source

Office of Utility Consumer Counselor (OUCC) · Oct 7, 2026
The state's voice for customers in utility cases. Takes public comments on pending IURC cases. Source

Indiana Department of Environmental Management (IDEM) · Oct 7, 2026
Issues air permits for backup generators and gas plants, and water quality and wetland permits. Posts public notices by region. Source

Indiana Department of Natural Resources, Division of Water · Oct 7, 2026
Registers big water users (over 100,000 gallons a day) and permits moving water between river basins. Source

Indiana Economic Development Corporation (IEDC) · Oct 7, 2026
Grants the state sales tax break to data centers. Source

Public Access Counselor · Oct 7, 2026
Free help and complaints about public records and open meetings. Source

Office of Environmental Adjudication (OEA) · Oct 7, 2026
Hears appeals of IDEM permits. Source