Being built

Heartland Industrial Park AI data center (Fluidstack, near Merom)

Also called: Next Frontier Indiana Campus, Heartland Industrial Park, Fluidstack Sullivan County

Fluidstack and partners are building a large AI data center campus next to the Merom coal plant in Sullivan County. The first phase is two buildings (430 MW) on about 140 acres; the full site could reach 2.1 gigawatts on about 1,000 acres. The company promised $50 million to the county and says it uses closed-loop cooling.

โœ” ConfirmedSourceLast checked: Oct 6, 2026

Where things stand: Phase 1 is under construction. The first data hall is planned to open in July 2027.

๐Ÿ•’ Latest update (Aug 6, 2026): Fluidstack held a public open house in Merom about the project.

What we know

  • ๐Ÿ“ WhereHeartland Industrial Park, between County Road 400 West and the Merom Generating Station, outside New Lebanon, Sullivan County
  • ๐Ÿข CompanyMeridian Arc HoldCo (Fluidstack and a Coatue-affiliated company); site developer Potentia
  • ๐Ÿ›๏ธ Owned byFluidstack
  • ๐Ÿ‘ค Built forunknown (Google backs the lease)
  • ๐ŸŒณ Size1,000 acres
  • โšก Power it needs2,100 megawatts (about as much as 1,680,000 homes)
  • ๐Ÿ”Œ Where the power comes fromPower through Hoosier Energy and WIN Energy REMC, next to Hallador's coal-fired Merom Generating Station. The developer says it pays all energy costs.
  • โ„๏ธ CoolingClosed-loop cooling: filled once, then reused
  • ๐Ÿ’ต Cost$65 billion
  • ๐Ÿ’ธ Tax breaksThe developer says it asked for no property tax breaks for Phase 1.

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • 2026
    A $5.7 billion financing deal closed for the first 430 MW phase on about 140 acres, with Google backing the lease.
  • Aug 6, 2026
    Fluidstack held a public open house in Merom about the project.
๐Ÿ›ฐ๏ธ See it from above

Drag the slider to compare the land before and now.

RecentRecent
Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. FluidStack hosts open house for Sullivan County data center campus ยท WTHI-TV ยท Aug 6, 2026
  2. Sullivan County data center (project website) ยท Fluidstack
  3. Data center start-up Potentia behind 2.1 GW Indiana project now backed by Fluidstack and Google ยท New Project Media ยท 2026