Send us a tip
Approved, not built yetBig (AI-size): 1,250 megawatts

Prometheus Hyperscale data center campus east of Evanston

Also called: WY-1, Aspen Mountain

Prometheus Hyperscale plans a 1.25-gigawatt data center on 506 acres of ranch land east of Evanston. It would make its own power from natural gas. The company says building would start within six months of final permits and take four to five years.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

🗓️ No meeting or deadline known yet.

Zoning here is usually decided by the Uinta County Commissioners (for land outside city and town limits).

Where things stand: Approved, not built yet County granted a conditional use permit in June 2026. A court tossed a challenge in August. Building has not started.

❓ 4 open questions about it: see below.

Last checked Oct 8, 2026.

🕒 Latest update (Aug 17, 2026): A judge dismissed the challenge.

What we know

  • 📍 WhereRanch land about 12 miles east of Evanston, south of Interstate 80, Unincorporated Uinta County, Uinta County
  • 🏢 CompanyPrometheus Hyperscale
  • 🌳 Size506 acres
  • ⚡ Power it needs1,250 megawatts (about as much as 1,000,000 homes)
  • 🔌 Where the power comes fromMostly natural gas made on site, not from the grid. The company hopes to add nuclear later.
  • 💧 Waterprivate on-site well for building plumbing; company says no water from the Bear River
  • ❄️ Coolingclosed loop with a water-glycol mix, replaced about every six years and trucked in
  • 💵 Cost$16 billion

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • Which tech company will use the Evanston data center? 🙋 I'll find out ·
  • What are the 30 permit conditions? 🙋 I'll find out ·
  • How much gas will the on-site power plant burn, and what air permits are needed? 🙋 I'll find out ·
  • Where exactly is the site? A parcel number, address or agenda link helps. 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 8, 2026: We checked the news reports and the 2020 state parcel map for an exact site: none gives a parcel, address or road corner.

    What happened so far

    • June 2026
      Uinta County commissioners unanimously granted a conditional use permit with about 30 conditions.
    • July 16, 2026
      Residents asked a court to review the permit.
    • Aug 17, 2026
      A judge dismissed the challenge.

    Local votes and rules

    ⚖️ Court case

    Residents asked the district court to review and cancel the county's permits for the Prometheus data center. They said there were secret meetings and conflicts of interest, and that a water study was needed. The county denied this. A judge dismissed the case on Aug. 17, 2026, so the permits stand.

    July 16, 2026

    ✅ Approved

    County commissioners unanimously granted a conditional use permit for Prometheus Hyperscale's 1.25-gigawatt data center on about 506 acres east of Evanston. The permit has about 30 conditions, including dust and noise limits, closed-loop cooling, and protecting local electric rates.

    June 16, 2026
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    We only know the town, so this shows the town center, not the exact site. Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. 1.25GW data center approved on ranchland near Evanston, Wyoming · KPCW · June 19, 2026
    2. Prometheus Pushes Ahead On $32B Wyoming Data Centers As Legal Challenge Fades · Cowboy State Daily · Aug 25, 2026

    See something wrong? Tell us and we'll fix it.