Built & runningBig (AI-size): 187 acres

Google data center campus at Elliot and Sossaman roads, Mesa

Also called: Redhawk, Google Mesa

Google is building an air-cooled data center campus in southeast Mesa, about 750,000 square feet across three phases. Mesa gave up to $16 million in tax breaks. The first building was due to open in 2025.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

Where things stand: Built & running First building was due online in 2025; a second building (Redhawk) is being planned. Full build-out is set for 2030.

❓ 3 open questions about it: see below.

📣 Report noise, water or power bill changes

Last checked Oct 8, 2026.

🕒 Latest update (2024): Plans for the second building (Redhawk Phase 2) went to Mesa for review.

What we know

  • 📍 Where187 acres of former farmland at the northwest corner of Elliot and Sossaman roads in Mesa's Elliot Road Technology Corridor. Map point is that corner., Mesa, Maricopa County
  • 🏢 CompanyGoogle
  • 👤 Built forGoogle
  • 🌳 Size187 acres
  • ❄️ Coolingair cooling
  • 💵 Cost$1 billion
  • 💸 Tax breaksMesa City Council approved up to $16 million in tax breaks over 25 years. Google must spend $800 million by 2027.

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • Is the second Google building under construction? 🙋 I'll find out ·
  • How much power does the campus use? 🙋 I'll find out ·
  • How much water does it use each day? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 8, 2026: We checked the 2025 Sentinel-2 satellite picture of the map point: Google's data center buildings stand at the northwest corner next to the point.

    What happened so far

    • July 1, 2019
      Mesa City Council approved a development deal for Google's $1 billion data center, with a $16 million property tax break over 25 years.
    • 2023
      Google broke ground on the Mesa campus.
    • 2024
      Plans for the second building (Redhawk Phase 2) went to Mesa for review.

    Local votes and rules

    ✅ Approved

    City planning board approved a smaller EdgeCore data center in Eastmark: two buildings (1.2 million square feet, down from 2.1 million). Generator tests only 9 a.m. to 9 p.m. It still needs a city council vote.

    March 11, 2026

    📜 Data center rules

    City council unanimously passed data center zoning rules, in effect Aug. 8, 2025. Data centers need council approval, may only go in industrial zones, must be 400 feet from homes and no taller than 60 feet, and must do an early review of power and water use.

    July 8, 2025
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. Mesa approves $1 billion deal to develop Google data center · KJZZ · July 2, 2019
    2. Plans Advancing for Construction of New and Very Large Google Data Center · Construction Reporter · 2024
    3. Google breaks ground on Mesa data center campus in Arizona · DatacenterDynamics · 2023
    4. Geocoded road corner: Elliot Rd and Sossaman Rd · Esri World Geocoder · Oct 7, 2026
    5. Sentinel-2 cloudless 2025 satellite mosaic (EOX) · EOX IT Services (contains Copernicus Sentinel data) · Oct 8, 2026

    See something wrong? Tell us and we'll fix it.