Google 'Project Tembo' data center campus south of Cheyenne (formerly Project Jade)

Also called: Project Jade, Project Tembo, Crusoe Cheyenne, BFC Power and Cheyenne Power Hub (power plant)

A huge AI data center campus planned on ranch land south of Cheyenne, near the Colorado line. Google now owns it. It would use 2.7 gigawatts of power at first and could grow to 10 gigawatts. A new gas and fuel-cell power plant is being built next to it.

✔ ConfirmedSourceLast checked: Oct 2026

Where things stand: County approved site plans in January 2026. Google took over from Crusoe in mid-2026. A changed site plan went to a county hearing on Aug. 13, 2026.

🕒 Latest update (Aug 13, 2026): Laramie County Commission hearing on the changed permit was scheduled.

What we know

  • 📍 WhereSection 5, Township 12 North, Range 66 West (power plant site plan also in Section 7), west of US 85 and south of Chalk Bluff Road, about 8 miles south of Cheyenne, Unincorporated Laramie County, Laramie County
  • 🏢 CompanyJupiter Star Holdings, LLC (Google subsidiary); first developed by Crusoe with Tallgrass Energy
  • 🏛️ Owned byGoogle
  • 👤 Built forGoogle
  • 🌳 Size716 acres
  • ⚡ Power it needs2,700 megawatts (about as much as 2,160,000 homes)
  • 🔌 Where the power comes fromTallgrass is building a gas-turbine and fuel-cell power plant next to the site. Google's filing says power will also come from Black Hills Energy through a substation, so the campus will be tied to the grid.
  • 💧 WaterDeep industrial wells below the Ogallala drinking water aquifer (company plan); wastewater treated on site in evaporation ponds
  • ❄️ Coolingclosed-loop cooling
  • 👷 Jobs promised400

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

🔎 What we checked

  • Oct 8, 2026: We checked 2025 satellite images (Sentinel-2) and older USGS images: they show grassland with an electric substation at the north-west corner of the section. The images predate the start of work, so the site was confirmed from the county site plan instead.

What happened so far

  • July 24, 2025
    Crusoe and Tallgrass announced a 1.8 GW AI data center campus south of Cheyenne.
  • Jan 6, 2026
    Laramie County commissioners unanimously approved the site plans for the data center and power plant.
  • June 2026
    Crusoe said it paused work at its customer's request and left the project. Tallgrass said its work goes on.
  • June 30, 2026
    A changed site plan filed with the county named Google (through Jupiter Star Holdings) as owner: four data halls, office and other buildings, done by 2031.
  • Aug 13, 2026
    Laramie County Commission hearing on the changed permit was scheduled.

Local votes and rules

✅ Approved

County commissioners unanimously approved site plans for the Project Jade data center (now Google's Project Tembo) and its gas power plants, about 8 miles south of Cheyenne. Growing beyond 1.8 gigawatts needs more state and county approvals.

Jan 6, 2026
🛰️ See it from above

An aerial photo of the area.

Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.