๐Ÿ“ฃ Report Something
USA โ€บ Washington โ€บ Grant County โ€บ Moses Lake City
Being built

Keel Grant Node AI data center (former Bitcoin mine)

Also called: Grant Node Data Center, former Bitfarms Moses Lake site

Keel Infrastructure is replacing an old Bitcoin mining site in Moses Lake with a one-story data center for AI computing of about 18 MW. No customer has been announced.

๐Ÿ‘ฅ Reported, not confirmed yetSourceLast checked: Oct 2026

Where things stand: Redevelopment under way in 2026; no tenant named.

๐Ÿ•’ Latest update (Aug 12, 2026): Local news reported Keel is turning the old mine into a single-story AI data center.

What we know

  • ๐Ÿ“ Where7906 Randolph Road NE, Moses Lake, Moses Lake, Grant County
  • ๐Ÿข CompanyKeel Infrastructure
  • โšก Power it needs18 megawatts (about as much as 14,400 homes)
  • ๐Ÿ”Œ Where the power comes fromGrant County PUD

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

๐Ÿ”Ž What we checked

  • Oct 8, 2026: We checked satellite photos: large industrial buildings stand at the mapped address next to Grant County International Airport.

What happened so far

  • April 2026
    Keel shut down Bitcoin mining at the Moses Lake site.
  • Aug 12, 2026
    Local news reported Keel is turning the old mine into a single-story AI data center.
๐Ÿ›ฐ๏ธ See it from above

Drag the slider to compare the land before and now.

20182025
Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. Keel advances Moses Lake data center as AWS speculation grows ยท Source ONE News ยท Aug 12, 2026
  2. Sentinel-2 cloudless satellite image of the site (2025) ยท EOX IT Services (Sentinel-2, Copernicus) ยท Oct 8, 2026

See something wrong? Tell us and we'll fix it.