Built & runningBig (AI-size): 100 megawatts
MARA bitcoin mining site (Hannibal)
Also called: MARA Hannibal Data Center
MARA runs a bitcoin mining site near Hannibal that it bought in 2024. In late 2025 it was using 86 megawatts, with plans to reach about 100.
What happens next?
Where things stand: Built & running Running at 86 MW in September 2025, with 14 MW more planned.
❓ 3 open questions about it: see below.
📣 Report noise, water or power bill changes
Last checked Oct 8, 2026.
🕒 Latest update (Oct 2025): MARA said the Hannibal site was running at full capacity, 86 megawatts.
What we know
- 📍 WhereHannibal area along the Ohio River, Ohio, Monroe County
- 🏢 CompanyMARA Holdings
- 🏛️ Owned byMARA Holdings
- 👤 Built forMARA (bitcoin mining)
- ⚡ Power it needs100 megawatts (about as much as 80,000 homes)
- 🔌 Where the power comes fromNext to a working power plant, per MARA
❓ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- How loud is the site for neighbors? 🙋 I'll find out ·
- Does it get a tax break? 🙋 I'll find out ·
- Where exactly is MARA's Hannibal bitcoin site? A parcel number, address or agenda link helps. 🙋 I'll find out ·
What happened so far
- Nov 5, 2024MARA bought the running Hannibal and Hopedale mining sites.
- Oct 2025MARA said the Hannibal site was running at full capacity, 86 megawatts.
🛰️ See it from above
Drag the slider to compare the land before and now.
20182025
We only know the town, so this shows the town center, not the exact site. Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.
Where this comes from
- MARA Adds 372 Megawatts of Capacity in Ohio · MARA Holdings · Nov 11, 2024
- MARA Announces Bitcoin Production and Mining Operation Updates for September 2025 · MARA Holdings · Oct 2025
- Marathon Digital: Hannibal, Ohio · Baxtel · 2026
See something wrong? Tell us and we'll fix it.