MARA bitcoin mining site (Hannibal)

Also called: MARA Hannibal Data Center

MARA runs a bitcoin mining site near Hannibal that it bought in 2024. In late 2025 it was using 86 megawatts, with plans to reach about 100.

โœ” ConfirmedSourceLast checked: Oct 6, 2026

Where things stand: Running at 86 MW in September 2025, with 14 MW more planned.

๐Ÿ•’ Latest update (Oct 2025): MARA said the Hannibal site was running at full capacity, 86 megawatts.

What we know

  • ๐Ÿ“ WhereHannibal area along the Ohio River, Ohio, Monroe County
  • ๐Ÿข CompanyMARA Holdings
  • ๐Ÿ›๏ธ Owned byMARA Holdings
  • ๐Ÿ‘ค Built forMARA (bitcoin mining)
  • โšก Power it needs100 megawatts (about as much as 80,000 homes)
  • ๐Ÿ”Œ Where the power comes fromNext to a working power plant, per MARA

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • Nov 5, 2024
    MARA bought the running Hannibal and Hopedale mining sites.
  • Oct 2025
    MARA said the Hannibal site was running at full capacity, 86 megawatts.
๐Ÿ›ฐ๏ธ See it from above

An aerial photo of the area.

We only know the town, so this shows the town center, not the exact site. Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. MARA Adds 372 Megawatts of Capacity in Ohio ยท MARA Holdings ยท Nov 11, 2024
  2. MARA Announces Bitcoin Production and Mining Operation Updates for September 2025 ยท MARA Holdings ยท Oct 2025

See something wrong? Tell us and we'll fix it.