Being builtBig (AI-size): 360 megawatts

TeraWulf Lake Mariner AI data center campus (Somerset)

Also called: Lake Mariner Data, CB-3, CB-4, CB-5, Wulf Compute

TeraWulf runs bitcoin mining at the old Somerset coal plant on Lake Ontario and is turning much of it into an AI data center for Fluidstack, with Google's financial backing. About 360 MW of AI capacity is under lease. The town approved the change in 2024.

✔ ConfirmedSourceLast checked: Oct 2026

What happens next?

🗓️ No meeting or deadline known yet.

Zoning here is usually decided by the Town Board of Somerset Town.

Where things stand: Being built Town approved AI data center buildings in 2024; more buildings for Fluidstack (backed by Google) are being built, with another expansion cleared by the planning board in Nov. 2025.

❓ 2 open questions about it: see below.

Last checked Oct 8, 2026.

🕒 Latest update (Nov 5, 2025): Somerset Planning Board found no significant environmental impact for two more AI buildings with a cooling water tank and a switch yard.

What we know

  • 📍 Where7725 Lake Road, Barker (former Somerset coal power plant on Lake Ontario), Somerset, Niagara County
  • 🏢 CompanyTeraWulf (Lake Mariner Data LLC / Wulf Compute LLC)
  • 🏛️ Owned byTeraWulf Inc.
  • 👤 Built forFluidstack (AI cloud company), with Google backing the leases
  • 🌳 Size400 acres
  • ⚡ Power it needs360 megawatts (about as much as 288,000 homes)
  • 🔌 Where the power comes fromMostly New York Power Authority hydropower plus NYSEG, through the old coal plant's two big 345 kV power lines.
  • 🗼 New power linesNo
  • ❄️ CoolingDry coolers for the first AI buildings; liquid cooling and water cooling for the newest building (CB-5)
  • 👷 Jobs promised40

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

  • How much water will the newer water-cooled buildings use per day? 🙋 I'll find out ·
  • How many diesel backup generators are on site? 🙋 I'll find out ·

✉️ Ask for it in writing

Copy this letter, fill in the parts in [brackets], and send it by email or mail.

    This is a template, not legal advice.

    🔎 What we checked

    • Oct 8, 2026: We checked the 2025 satellite picture. The data center halls stand at the old Somerset power plant on the lake shore, about 1 km north of where the address pin on Lake Road was. We moved the pin to the buildings.

    What happened so far

    • Oct 2024
      Somerset Town Board voted 5-0 to change the site's zoning (planned unit development) to allow an AI data center.
    • Nov 14, 2024
      Somerset Planning Board approved the site plan for new AI/computing buildings on 23 acres, with sewer and noise conditions.
    • Aug 18, 2025
      TeraWulf announced Fluidstack leased a fifth building (CB-5, 160 MW), bringing leases to about 360 MW; Google backs $3.2 billion of the debt.
    • Nov 5, 2025
      Somerset Planning Board found no significant environmental impact for two more AI buildings with a cooling water tank and a switch yard.

    Local votes and rules

    ✅ Approved

    Planning board approved the site plan for new AI computing buildings at Lake Mariner, on the condition that TeraWulf fixes sewer issues and follows the town noise law.

    Nov 2024

    🗺️ Zoning change

    Town board voted 5-0 to change the zoning (planned unit development) at TeraWulf's Lake Mariner site to allow AI data center buildings.

    Oct 2024
    🛰️ See it from above

    Drag the slider to compare the land before and now.

    20182025
    Photos: Sentinel-2 cloudless by EOX IT Services GmbH (contains modified Copernicus Sentinel data), CC BY-NC-SA 4.0.

    Live near here?

    Tell us what you see, hear, or what your bill looks like.

    📣 Report something

    Where this comes from

    1. Somerset AI data center proposal (Niagara Gazette) · Yahoo / Niagara Gazette · Oct 24, 2024
    2. Upstate New York community approves AI data center plan · Government Technology / Niagara Gazette · Nov 14, 2024
    3. TeraWulf announces Fluidstack expansion with 160 MW CB-5 lease at Lake Mariner · TeraWulf (SEC filing) · Aug 18, 2025
    4. Village of Barker - AI Data Facility (SEQR negative declaration) · NYS DEC Environmental Notice Bulletin · Nov 5, 2025
    5. Sentinel-2 cloudless 2025 image of the Somerset plant site · EOX IT Services (Sentinel-2 cloudless) · Oct 8, 2026

    See something wrong? Tell us and we'll fix it.