Being built

TeraWulf Lake Mariner AI data center campus (Somerset)

Also called: Lake Mariner Data, CB-3, CB-4, CB-5, Wulf Compute

TeraWulf runs bitcoin mining at the old Somerset coal plant on Lake Ontario and is turning much of it into an AI data center for Fluidstack, with Google's financial backing. About 360 MW of AI capacity is under lease. The town approved the change in 2024.

βœ” ConfirmedSourceLast checked: Oct 7, 2026

Where things stand: Town approved AI data center buildings in 2024; more buildings for Fluidstack (backed by Google) are being built, with another expansion cleared by the planning board in Nov. 2025.

πŸ•’ Latest update (Nov 5, 2025): Somerset Planning Board found no significant environmental impact for two more AI buildings with a cooling water tank and a switch yard.

What we know

  • πŸ“ Where7725 Lake Road, Barker (former Somerset coal power plant on Lake Ontario), Somerset, Niagara County
  • 🏒 CompanyTeraWulf (Lake Mariner Data LLC / Wulf Compute LLC)
  • πŸ›οΈ Owned byTeraWulf Inc.
  • πŸ‘€ Built forFluidstack (AI cloud company), with Google backing the leases
  • 🌳 Size400 acres
  • ⚑ Power it needs360 megawatts (about as much as 288,000 homes)
  • πŸ”Œ Where the power comes fromMostly New York Power Authority hydropower plus NYSEG, through the old coal plant's two big 345 kV power lines.
  • πŸ—Ό New power linesNo
  • ❄️ CoolingDry coolers for the first AI buildings; liquid cooling and water cooling for the newest building (CB-5)
  • πŸ‘· Jobs promised40

❓ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • Oct 2024
    Somerset Town Board voted 5-0 to change the site's zoning (planned unit development) to allow an AI data center.
  • Nov 14, 2024
    Somerset Planning Board approved the site plan for new AI/computing buildings on 23 acres, with sewer and noise conditions.
  • Aug 18, 2025
    TeraWulf announced Fluidstack leased a fifth building (CB-5, 160 MW), bringing leases to about 360 MW; Google backs $3.2 billion of the debt.
  • Nov 5, 2025
    Somerset Planning Board found no significant environmental impact for two more AI buildings with a cooling water tank and a switch yard.

Local votes and rules

βœ… Approved

Planning board approved the site plan for new AI computing buildings at Lake Mariner, on the condition that TeraWulf fixes sewer issues and follows the town noise law.

Nov 2024

πŸ—ΊοΈ Zoning change

Town board voted 5-0 to change the zoning (planned unit development) at TeraWulf's Lake Mariner site to allow AI data center buildings.

Oct 2024
πŸ›°οΈ See it from above

An aerial photo of the area.

Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

πŸ“£ Report something

Where this comes from

  1. Somerset AI data center proposal (Niagara Gazette) Β· Yahoo / Niagara Gazette Β· Oct 24, 2024
  2. Upstate New York community approves AI data center plan Β· Government Technology / Niagara Gazette Β· Nov 14, 2024
  3. TeraWulf announces Fluidstack expansion with 160 MW CB-5 lease at Lake Mariner Β· TeraWulf (SEC filing) Β· Aug 18, 2025
  4. Village of Barker - AI Data Facility (SEQR negative declaration) Β· NYS DEC Environmental Notice Bulletin Β· Nov 5, 2025

See something wrong? Tell us and we'll fix it.