Stopped or cancelled
Amazon data center site in Becker
Also called: Elk River Technologies
Amazon bought about 350 acres near the Sherco power plant in Becker for a large data center. The plan needed about 250 backup diesel generators. In May 2025 Amazon paused the project, but it still owns the land.
Where things stand: Amazon paused the project in May 2025. It still owns the land.
๐ Latest update (May 23, 2025): Amazon told the city it was pausing its plans in Minnesota, including Becker. It kept the land.
What we know
- ๐ WhereAbout 350 acres of former Xcel Energy land near the Sherco power plant, Becker, Sherburne County
- ๐ข CompanyAmazon Data Services
- ๐๏ธ Owned byAmazon
- ๐ค Built forAmazon
- ๐ณ Size350 acres
- ๐ Where the power comes fromNear Xcel Energy's Sherco plant, where coal units are closing and a large solar farm is being built.
- ๐ข๏ธ Diesel generators250
- ๐ต Cost$1 billion
โ Still unanswered
Nobody has answered these in public yet. Can you help find out?
- Will Amazon restart its Becker data center or sell the land? ๐ I'll find out
What happened so far
- 2024A company called Elk River Technologies bought 348 acres from Xcel Energy for a planned $1 billion data center; the land later went to Amazon.
- May 23, 2025Amazon told the city it was pausing its plans in Minnesota, including Becker. It kept the land.
๐ฐ๏ธ See it from above
An aerial photo of the area.
We only know the town, so this shows the town center, not the exact site. Photos: USGS The National Map.
Where this comes from
- Amazon pulls back on plans for large data center in Becker ยท MPR News ยท May 23, 2025
- Amazon scraps Becker data center plan ยท FOX 9 ยท May 23, 2025
- $1B data center campus planned at closing MN power station ยท Bisnow