Being built

ValorC3 Boise data center on Emerald Street

Also called: ValorC3 BOI2

A 38,000-square-foot, 10-megawatt data center being built in west Boise for one large tech company. The owner already wants to nearly double the building. It is expected to open in 2027.

โœ” ConfirmedSourceLast checked: Oct 8, 2026

Where things stand: Under construction, expected to open in 2027. In March 2026 the owner applied to add about 31,000 square feet.

๐Ÿ•’ Latest update (April 2026): ValorC3 closed a loan to keep building, backed by a long lease with a big tech company.

What we know

  • ๐Ÿ“ Where9601 W. Emerald St., Boise (address geocoded with the Census geocoder), Boise, Ada County
  • ๐Ÿข CompanyValorC3 Data Centers
  • ๐Ÿ‘ค Built forA large tech company (not named)
  • โšก Power it needs10 megawatts (about as much as 8,000 homes)
  • ๐Ÿ”Œ Where the power comes fromIdaho Power grid
  • ๐Ÿ’ต Cost$20 million

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • May 2025
    ValorC3 announced a second, 10-megawatt Boise data center.
  • March 2026
    ValorC3 filed a preliminary city application to add about 31,000 square feet.
  • April 2026
    ValorC3 closed a loan to keep building, backed by a long lease with a big tech company.
๐Ÿ›ฐ๏ธ See it from above

An aerial photo of the area.

Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. Boise data center is set to open next year. Before opening, owners just applied to nearly double it ยท BoiseDev ยท March 26, 2026
  2. ValorC3 secures credit facility to fund 10MW data center in Boise, Idaho ยท DatacenterDynamics ยท April 2026
  3. ValorC3 to develop second data center in Boise, Idaho ยท DatacenterDynamics ยท May 2025

See something wrong? Tell us and we'll fix it.