Phillip Road site (possible data center in an 'innovation center')

Also called: Panattoni Phillip Road project, PL24-1010

Panattoni wants to rezone a 240-acre city-owned field in west Roseville for about 660 homes, shops and an 'innovation center.' The draft environmental report says the industrial part could include a data center. The city says any data center would be capped at 30 megawatts and use recycled water.

โœ” ConfirmedSourceLast checked: Oct 7, 2026

Where things stand: Rezoning is under review; the plan could allow a data center up to 30 MW, but none is formally proposed.

๐Ÿ•’ Latest update (July 14, 2026): Roseville told reporters its grid is not built for a hyperscale data center.

What we know

  • ๐Ÿ“ Whereabout 240 city-owned acres at the west end of Blue Oaks Boulevard, along Pleasant Grove Creek, west Roseville, Roseville, Placer County
  • ๐Ÿข CompanyPanattoni Development
  • ๐ŸŒณ Size240 acres
  • ๐Ÿ”Œ Where the power comes fromRoseville Electric (city-owned utility); the city says its grid cannot serve a large hyperscale data center
  • ๐Ÿ’ง Waterrecycled water (draft environmental report budgets 538 acre-feet a year for cooling a possible data center)
  • ๐Ÿ›ข๏ธ Diesel generators15

โ“ Still unanswered

Nobody has answered these in public yet. Can you help find out?

What happened so far

  • 2021
    Roseville City Council signed an option to sell the land to Panattoni.
  • Feb 2026
    Draft environmental report released. It assumes a possible data center with 15 diesel backup generators of 3 MW each.
  • July 14, 2026
    Roseville told reporters its grid is not built for a hyperscale data center.
๐Ÿ›ฐ๏ธ See it from above

An aerial photo of the area.

We only know the town, so this shows the town center, not the exact site. Photos: USGS The National Map.

Live near here?

Tell us what you see, hear, or what your bill looks like.

๐Ÿ“ฃ Report something

Where this comes from

  1. Roseville Phillip Road site and data center questions ยท CapRadio ยท July 17, 2026
  2. What is (and isn't) happening with data centers in the Sacramento region ยท Abridged (PBS KVIE) ยท July 14, 2026

See something wrong? Tell us and we'll fix it.